CV: Electrical Engineer
SHAIK AZGAR ALI
Personal Profile:
Total Experience : 5+ years.
Visa Status : visit visa.
Expiry Date : 25-03-2018.
E-Mail : **************@*****.***
Mobile : +971*********/+918*********(INDIA).
Career Objective:
I would like to associate myself with an organization, which has ample scope for growth. This would enable me to utilize all my skills and abilities to the maximum extent and there by contribute to the goals of the organization. I want to see myself in an authoritative position in my field and would like to grow in an organization where innovation rules the forces, and develop professionally to wield managerial responsibilities. Qualifications:
1. B.TECH in Electrical & Electronics Engineering (EEE) from J N T UNIVERSITY, AP, India. 2. Intermediate (12th Standard) with in Apr’06 with an aggregate of 68.2%. 3. SSC (10th Standard) from Board of Secondary Education in Apr’04 with 68.8%. Skills Summary:
1. AutoCAD from Dhanush Enggservices india Pvt Ltd, Hyderabad in 2013. 2. Electrical Design course from Dhanush Enggservices india Pvt Ltd, Hyderabad in 2013. 3. Calculation of cable size and Circuit Breaker size. 4. Calculation of Transformer size and generators size. Professional Experience 5+ years
Employer : BAUD TELECOM COMPANY,KSA.
Period : Mar 2015 to Mar 2017.
Role : Site Engineer
Projects Handled:
Project Name : KING ABDULLAH BIN ABDULAZIZ PROJECT THIRD SAUDI EXPANTION OF HOLY HARAM MAKKAH & SARROUNDING AREAS(SECURITY BUILDINGS PLOT-1)
Consultant : DAR AL-HANDASAH SHARE AND PARTNERS SAUDI ARABIA,KSA. Job Responsibilities as a Electrical site engineer: 1. Handful of Experience in Low Current systems especially in Fire Alarm System, Public Address System & Structure Cabling System
2. Handling splicing working team in order to complete the installation task. 3. Raising WIR‘s (work inspection request) for completion work as per Revised Drawings. Fullfill the comments during inspection with the coordination of site team and complete the task as per consultant requirements.
4. Maintained all Quality Control logs and ensured that all changes made in drawings were followed during implementing process.
5. Monitoring material needs in the site and raising work order. 6. Coordinated with other companies Site Engineers and Technicians and performed tests on project components. 7. Coordinated with Construction Manager and scheduled all materials required fo Various activities. 8. Ensured Coordination with the other services for safety to maintain friendly environment to avoid future Problem.
9. Inspected site executed work /Supervision as per approved shop drawings for approval. 10. Inspected Delivered material at site as per approved Technical Material Submittal. 11. Ensure all equipments and material selection, processes were in accordance to required specification. 12. Prepared project QC plans and documentation forms and evaluated them for quality. 2 of 2
Project Name : KING ABDULLAH BIN ABDULAZIZ PROJECT THIRD SAUDI EXPANTION OF HOLY HARAM MAKKAH & SARROUNDING AREAS(CENTRAL UTILITY COMPLEX)
Consultant : DAR AL-HANDASAH SHARE AND PARTNERS SAUDI ARABIA,KSA. Organization : BT APPLIED TECHNOLOGY,KSA.
Period : May 2014 to FEB 2015.
Role : Site Engineer
Project Responsibility:
1. Inspected site executed work /Supervision as per approved shop drawings for approval. 2. Fallow ups with civil and MEP works for site installation 3. Handful of Experience in 1st Fix of Low Current systems especially in Fire Alarm System, Public address system
& Structure cabling system.
4. Handling splicing working team in order to complete the installation task. 5. Fullfill the comments during inspection with the coordination of site team and complete the task as per consultant requirements.
6. Maintained all Quality Control logs and ensured that all changes made in drawings were followed during work implementing process.
7. Coordinated with other companies Site Engineers and Technicians and performed tests on project components.
8. Ensured Coordination with the other services for safety to maintain friendly environment to avoid future problems.
Organization : T V L ELECTRICALS,VIJAYAWADA.
Period : JAN'2012 to SEP'2013.
Role : Assistant Electrical Engineer.
Projects Handled:
1.Testing And Calibration of Protective relays in HPCL,BPCL,IOCL. 2. Testing & Calibration of ENERGY METERS Ammeters, Volt Meters, Wattmeter’s HPCL,BPCL,IOCL 3.Testing of Power Transformers & Distribution Transformers in KANORIYA CHEMICALS & INDUSTRIES LIMITED. 4.Testing and Filtration of transformer oil IN SPINING MILLS. 5.Testing of current & voltage transformers of all voltage ranges. 6. Testing and Servicing of circuit breakers (VCB, OCB, SF6) of all Voltage ranges in Ripples mall vijayawada. 7.Testing and Commissioning of Complete Panels HT& LT along with C.T.T. Breakers in Vishnu cement s Organization : ZYLOG SYSTEMS PRIVATE LIMITED,TENALI Period : AUG'2011 to DEC'2012.
Role : SERVICE ENGINEER
Responsibilities:
1.Installation of wi5 connection to every home, net centres, colleges etc. 2.Troubleshooting the systems
3.Installation of softwares and operating system.
4.Servicing the wi5 networks & modems & cable rooting. OTHER INFORMATION:
Date of Birth : 21-08-89.
Marital satus : Married.
Languages Known : English, ARABIC, Telugu and Urdu. Religion /Nationality : Muslim/ Indian.
Place : Dubai, UAE
Date : (SK. AZGAR ALI)