Post Job Free

Resume

Sign in

Engineer Manager

Location:
Blacksburg, VA
Posted:
March 16, 2018

Contact this candidate

Resume:

Education

University of Texas at Arlington, Texas: MS Systems Engineering (Aug ’16)

University of Mumbai: BE, Electronics and Telecommunication Engineering (May ’12)

Technical Skills:

MATLAB, Multisim, Keil-C, Express PCB, MS Project, Visio, Rational Doors, and Mindjet Manager.

Creating Integrated Master Plan (IMP), Integrated Master Schedule (IMS), Systems Engineering Master Plan (S.E.M.P.), Six Sigma Yellow Belt, Basic MOST

Work Experience:

Consultant with Experis Engineering Manpower Group, Raleigh NC (July ’16 – Present)

Logistics Engineer, Industrial Projects (BIW & Cab paint shop), Volvo Group Trucks (Dublin NRV)

Use Volvo and Industry standard problem solving and continuous improvement tools including: Fish Bone, VSM 5why, 5W1H to create and document standard operational procedures.

Make (Manual Storage Retrieval Systems) MSRS a more efficient system for the storage and retrieval of painted parts.

Define flow and delivery methods for materials from receiving docks to use points.

Time studies, stop-watch, MOST, and job breakdowns of operators.

Define layout of logistics area and new process for material flow.

Lead continuous improvement process for industrial projects.

Efficient ergonomic delivery of small parts.

Systems Engineer Co-op, (Powertrain) Volvo Group Trucks (Jan. ‘16 – May ‘16)

Paperless Factory: Document processing elimination and reduction

Document paperwork process followed at Engine, Axle, Transmissions lines.

Built business case for pilot plants saving up to $50mil per year for Hagerstown powertrain.

Identified probable solutions and evaluated hardware and software vendors.

Elicited requirements from various related departments (Quality, Safety, Industrial, etc.)

Prepared scope document, RFQ, and status documents at project stage gates.

Production Data Management:

Consolidate process used by stations to calculate the OEE (Overall Equipment Efficiency)

Validate database compatibility between software to reduce transaction complexity.

Kaizens: Initiated Kaizens

Automate pick-by-light areas inventory issuance.

Server information consolidation to feed into DUGA manufacturing control software.

Bar coded axel components to match up the correct parts saving over $80k.

Research Assistant at the RAID labs, University of Texas at Arlington (May ‘15- Jan. ‘16)

Volunteer: Secretary for APICS Chapter Roanoke (Jan’18- Present)

Business Development Manager, Vodafone India Ltd., (Mumbai- India) (Jun ’12 – Oct. ’13)

Approached potential clients to elicit their communication requirements.

Initiate standard departmental process to gather data make it available on team place.

Negotiate meetings, prepare RFP’s, and create quotes.

Architected telecom solution for clients.

Graduate Project: Mobile manufacturing company

Complete lifecycle project and systems engineering master plan. (March ‘15)

Research Project on Earned Value Management and its applications. (Dec. ‘14)



Contact this candidate