Post Job Free

Resume

Sign in

Engineer Manager

Location:
Lahore, Punjab, Pakistan
Salary:
12000
Posted:
February 28, 2018

Contact this candidate

Resume:

CURRICULUM VITAE

Tanveer Ahmad

House # ***, Phase V, Defence Lahore – Pakistan

Contact Cell # 033********

E-mail: ac4m5u@r.postjobfree.com, Skype ID: tanpak786

Age: 47 Years

Experience:

24 years

Qualifications:

Masters in Mechanical Engineering

Skills:

Projects Engineering and Execution as per Contracts, Planning and Scheduling, Plant Modifications, Management of Plant Operation and Maintenance, Start-up and Commissioning, Estimation, Techno-Commercial write-ups etc.

1.Pak Arab Refinery Ltd. (PARCO)

The largest fully integrated Energy Company in Pakistan’s Corporate Sector comprising of country’s most modern Refinery (100,000 BPD) and over 2000 kilometers cross-country network of pipelines.

Job Duration: March 31, 2015 till today

Position: Chief Engineer

Develop scope of work for new projects.

Review work packages submitted by consultants, contractors & vendors including design specifications, drawings, contract documents etc.

Progress monitoring of projects and coordinate for their timely completion.

Projects planning & scheduling. Obtain Management approvals for new projects.

Provide support to the Management through techno-Commercial evaluations for various Projects. Attend meetings with European and American Companies regarding study for the installation of 250,000 BPD new Refinery & revamp project for existing 100,000 BPD Refinery.

Coordinate with TSC and HAZOP Teams. Issue monthly progress reports and other documents.

Co-ordinate with other Departments and Organize Presentations for the Management.

Organize Technical Trainings for the Divisional Employees.

Coordinate for timely utilization of yearly approved Revenue and Capital Budgets.

Supervision of execution activities at sites e.g. horizontal directional drilling activities across canals and tie-ins for dia. 26” cross country white oil pipeline network, replacement of pipeline segments and coating works etc.

2.Project Based Assignments from October, 2012 – March 29, 2015

2.1Senior Manager Technical and Design at HWGC: Finalization of 100 MWe coal based Power Plant consisting of 4x125 TPH coal fired high pressure boilers and steam turbines for a sugar mill. Detail engineering and technical support during the manufacturing of bagasse fired high pressure water tube boilers, pressure vessels, heat exchangers, refinery/petrochemical distillation towers, storage tanks, dual media filters, sand filters, RO units, grey water treatment plants, Demineralized Water/ soft water treatment plants, sewage treatment plants, overhead travelling cranes, belt conveyors, sorting conveyors, process piping and steel structure. Installed as per ASME, DN/EN and API Standards.

2.2Engineering Manager: 48,500 M3 LGO Tank and LCO Tank including piping works for Qatar Petroleum.

2.3Project Manager: Oryx GTL Shutdown works (Qatar).

2.4Project Management for the design, procurement and installation of 15 MMCFD Oil & Gas processing Plant for Polish Oil & Gas Company (POGC). It has been successfully commissioned in June, 2013. Plant consists of separators, de-hydration unit, compressors, U-stamped skid mounted package units (three phase and two phase condensate water separators, glycol drain package, slop oil vessel package, water degasser package), storage tanks, piping, API pumps, fire water network etc.

2.5Project Manager for the installation of 26 KM long Ø10” natural gas pipe line for ENGRO Fertilizer Plant. This project has been successfully installed and commissioned within three months.

2.6Design review of HVAC system including plumbing system for water supply and drainage of 13 story building.

3.Fatima Fertilizer Ltd. (FFL)

Job Duration: August 02, 2010 to Oct. 10, 2012

Position: Unit Manager Projects

Lead Projects Engineering and Execution Teams responsible to handle detail engineering and execution activities of projects within plant and outside plant boundary limits.

Reviewed and approved more than 350 detail engineering packages for projects of Urea Plant, Ammonia Plant, Nitric Acid Plant, CAN Plant, O&U area.

Presentation of Projects Unit budget for management approval. Review and approval of material purchase requisitions, comparative statements, work orders.

Meet the execution timelines.

Day to day plant modifications for Urea Plant, Ammonia Plant, Nitric Acid Plant, CAN Plant, Ammonium Nitrate Plant, NP Plant, O&U Area.

All works were executed as per specifications of Kellogg, Kawasaki, CF Brown and UDHE

Arranged the installation of design soft-wares e.g. Auto-Pipe, STAAD Pro, Compress VI for Project Engineers. Obtained Management approvals for technical trainings of Projects Department personnel. Organized the availability of latest design standards (ASME, API etc.) for the team.

Projects handled in Fatima Fertilizer Limited:

S. No.

Project Title

01

Design and Installation of De-humidification System for CAN Plant including 2x Ø12” – 1.8KM long chilled water pipe lines. Project increased CAN production capacity @50 tons per day.

02

Design and installation of Natural Gas compression facility consisting of two Compressors (Cooper Cameron – USA) and Ø 20” piping works, Civil and E&I works

03

Design and installation of five new wells along with Ø12”–4.5 KM long piping for Potable Water of Plant.

04

Design and Installation of 2x75m3/hr. Reverse Osmosis Plant for O&U Area.

05

Installation of Ø48” piping along with 2x5000m3/hr. cooling water booster pumps for CAN and NP Plant

06

Design and installation of Ø4” – 3.4KM long Natural Gas Line from NG Station to the Township of Plant.

07

Laying of 0.3mm thk. HDPE-GEO Membrane in Evaporation Ponds at an Area of 220,000 M2. Completion of civil works for Evaporation Pond # 1, 2, 3 &4. Design and Installation of Ø10”- 950 m long HDPE underground piping at a depth of 10 feet for Evaporation Pond # 1, 2, 3 &4.

08

Design and installation of Ø12” – 1.2KM long Natural Gas Line from NG Station to Ammonia Plant

09

Design of utility lines (IA, PA, LLPS, CW and DW lines) for Plant Handling and Bagging Area

10

Design and installation of Hot Air Blowing System at Urea and CAN Plant bagging area.

11

Completion of Waste Water Piping System for whole Fertilizer Complex.

12

Completion of Chemical Sewage Piping System for whole Fertilizer Complex

13

Design and Installation of Nitric Acid Jerry Cans Filling Facility

14

Design and installation of Instrument Air (IA) Line for Plant Maintenance Shop

15

Design and Installation of Potable Water Line to Plant Canteen

16

Modifications in conveying and bagging systems from Urea Prilling Tower to bagging systems

17

Design and Installation of Gaseous Ammonia System with Piping at CAN Plant

18

Design of urea dissolving system in the urea solution tank

19

Design and installation of Oily Water System at Plant

20

Design and Installation of mechanical piping works for Sedimentation Basin. FRP lining inside the Sedimentation Basin.

21

Design and Installation of Lime Stone Storage Shed, Protection Sheds for RO Plant, Nitrogen Plant etc.

4.MOUCHEL (ENGLAND)

A leading Engineering and Consulting Company of UK, established in 1897. Provide detail engineering and Project Support services within UK, Middle East and for other countries,

Work Location: Hinckley (Leicestershire)

Department: Energy and Carbon Projects

Duration: 20 November 2008 – 26 February 2010

Position: Senior Mechanical Engineer

Responsibilities included the production of conceptual and detail design packages, design calculations for piping, vessels, tanks, scrubbers, heat exchangers, boilers etc. using IGE/TD Standards, ASME/ANSI/ASTM Standards, BS-EN Standards and API Standards, review & approval of drawings prepared in house, review and approval of contractors design packages, technical bid evaluations, preparation of procurement data sheets/specifications and technical proposals, undertake site visits, attend technical clarification meetings with clients and contractors. Acted as a mentor for Junior Mechanical Engineers.

Projects handled in UK:

S. No.

Project Title

Client

01

New LNG Facilities: Review of vendor design packages for LNG Vessels, control valves, safety valves, plug valves etc.

Kuwait National Petroleum Co. (KNPC)

02

New LPG Facilities: Responsible to review tender documents/ project specs., vendor design packages for vessels, piping, valves etc.

Kuwait Oil Tanker Company

(KOTC)

03

Design of Pressure Reduction Installation (PRI) 92.64 -70 barg 50 km long Gas line (Design Calcs., Data Sheets, Design Report).

National Grid (UK)

04

Technical Analysis of 42 KM Long; Ø600 High Pressure Gas Pipeline between Silk Willoughby and Stay Thorpe Power Station

National Grid (UK)

05

Design package for installation of Rotary Separators at Carnforth Compressor Station

National Grid (UK)

06

Best Available Technique Study to Replace Existing Water Bath Heaters at Carnforth and Warrington Compressor Stations

National Grid (UK)

07

Best Available Technique Study to Install LNG Facilities at Manchester

National Grid (UK)

5. Saudi Basic Industries Corporation (SABIC)

SABIC is a global leader headquartered in Riyadh (Saudi Arabia). Manufacture different kind of products for example: chemicals, metals, fertilizers etc. on a global scale in the Americas, Europe, Middle East and Asia Pacific,

Work Location: Jubail Industrial City- Saudi Arabia

Department: Centralized Design Management Department of SABIC

Position: Sr. Mechanical Design Engineer

Duration: 09 February, 2006 – 18 October, 2008

Design Review of a Mega Project in United States of America in 2006

Saudi Arabian Petrochemical Company (PETROKEMYA), an affiliate of SABIC awarded US$ 260 Million Project to an EPC Company named as MUSTANG TAMPA Inc. located in TAMPA – FLORIDA (USA). Responsibilities as a Stationary Equipment & Piping Specialist during stay in USA included the meetings with equipment manufacturers to freeze technical issues as per project specifications, review and comment on vendor design documents, review and comment on Technical Bid Analysis (TBA) prepared by MUSTANG TAMPA. These activities were performed for following equipment’s of Mega Project:

2 x 150 TPH; 110 Bar G; 520ºC VHP Steam, Water Tube Boilers

1 x 400 M3 De-aerator; 01 No. Ethylene Vaporizer; Air Coolers & Air Dryers

Water Treatment Plant for whole Project

02 Nos. High Pressure Instrument Air Buffer Vessels

4 Nos. Storage Tanks each in diameter 28000 mm

HAZOP Study in Poland during June-July, 2007

Al-Jubail Fertilizer Company (ALBAYRONI); an affiliate of SABIC awarded 400 Million Saudi Riyal Urea Prilling Tower Emission Control Mega Project to an EPC Company named as PROZAP Engineering Ltd. located in Pulaway (Poland). As a Lead Mechanical Design Engineer for this project, attended HAZOP Study meetings held in Poland. HAZOP study included crystallization unit, cleaning unit, scrubbers, vessels, tanks, pumps, fans, silencers, piping, ducting, stacks and steel structure.

Mechanical Design Review in Poland in Nov.- Dec., 2007

Review of mechanical & piping design documents prepared by PROZAP for Urea Prilling Tower Emission Control Project during stay in Poland. Reviewed detail engineering documents for tanks & vessels, piping plans, piping isometrics, pumps & fans specifications, drawings for ducting, steel structure and prilling tower exhaust doors.

Major Responsibilities in SABIC:

-Preparation of Front End Engineering Packages for projects of Petrochemical Plants and Steel Plant.

-Review of design packages submitted by EPC Contractors

-Preparation of Technical Requisitions for procurement of project materials.

-Bid technical evaluations for boilers, FRP/SS/CS Tanks, vessels, de-aerators, coolers, heat exchangers, hydrogen generators, water cooled chillers, air cooled chillers, centrifugal pumps, diaphragm pumps, fans etc. during procurement process.

-Design calculations for vessels, tanks, scrubbers, heat exchangers, boilers and piping using ASME/ANSI, BS-EN and API Codes/Standards

-Material selection for vessels, tanks, scrubbers, heat exchangers, piping and ducting at different working conditions.

- For in house projects, drawings review and approval for vessels, tanks, heat exchangers, scrubbers, piping, ducting and steel structure,

-Projects costing and scheduling

Projects handled in SABIC:

For each project appended below, a team of civil, electrical and instrumentation engineers was assigned to support. All of these assigned Engineers were having more than 20 years’ experience in their relevant discipline.

S. No.

Project Title

Plant Name

01

Installation of Ethane Heat Exchanger with Piping

Jubail United Petrochemical Company

02

Installation of HCl Scrubbing System with Piping

Jubail United Petrochemical Company

03

Installation of 100 M3 HCl Tank with Piping

Saudi Arabian Petrochemical Company

04

Installation of Nitrogen Seal Gas Buffer Vessel & Piping

National Industrial Gases Company

05

Reformer Nox Emission Control Unit with Piping

Al-Jubail Fertilizer Company

06

Urea Granular Emission Control Unit with Piping

Saudi Arabian Fertilizer Company

07

Melamine Recovery Vessels,, Tank and Piping

Saudi Arabian Fertilizer Company

08

Installation of Gas Seal Pot with Piping

Saudi Arabian Petrochemical Company

09

600 RT Water Cooled Chiller with Piping

Saudi Iron & Steel Company (HADEED)

10

3x170RT Air Cooled Chillers with Piping

HADEED

11

Installation of 4 Horizontal & 3 Vertical Ladle

HADEED

Pre-Heaters along with Dryers

12

Installation of Air Compressor with Piping

HADEED

13

Installation of Hydrogen Plant with Piping

HADEED

14

Installation of Air Dilution System with Piping

HADEED

15

Inst. of Furnace De-dusting at DR Module A&B

HADEED

16

Installation of DRI Vibro Feeder with hopper

HADEED

17

Installation of Pinch Roller at Rolling Mill

HADEED

18

Installation of Cooling Water System at SP LP

HADEED

19

Oxide De-dusting at Direct Reduction Plant

HADEED

20

Installation of New Oxygen Line at Steel Plant

HADEED

21

Installation of I Ton Jib Crane at FP Shop

HADEED

22

Installation of Pre-Heating Furnace at FP Shop

HADEED

23

Installation of 04 Nos. Centralized Lubrication Systems

HADEED

24

Installation of 04 Air Compressors at DR Plant

HADEED

25

Installation of Lathe Machine at Fitting Shop

HADEED

26

Installation of 20 M3 HCl Tank & Piping at EDP

HADEED

27

Installation of Strand Cutting Machine at LP Shop

HADEED

28

Modification of Run Out Roller Table

HADEED

29

Installation of Sample Carrier Line in LF # 1&2

HADEED

30

Oil Circulation System for Motor Testing

HADEED

31

Up-Grading of Product De-dusting System at DR Mod. C

HADEED

32

Installation of Roll Shop Logo Branding Machine

HADEED

33

Installation of Six Exhaust Fans in SPLP

HADEED

34

Up-gradation of CCP Cooling System

HADEED

35

Up-gradation of Rolling Mill Open Circuit System

HADEED

36

Replacement of Caster Cooling Pipe Lines

HADEED

37

Installation of Robot Table at Bar Rod Mill Roll Shop

HADEED

38

Installation of Testing Machines at New Test House

HADEED

39

Up-gradation of Grease Sys. at Rolling Mill Complex

HADEED

40

DR Mod A & B Fire Fighting Pumps Replacement

HADEED

41

Irrigation Piping System

HADEED

42

Upgrade Guides for Different Stands at Steel Plant

HADEED

43

Add Screw Counter in Stacker Area of Bar Mill 2

HADEED

6. Descon Engineering Limited (Multinational EPC Company)

Work Location: Lahore - Pakistan

Duration : 20 February 1994 – 08 February 2006

Last Position: Lead Engineer Mechanical Design/Deputy Manager

Engineering Manager:

a- Engineering Manager for 2x80 TPH @ 29 BarG, 350+10ºC Bagasse Fired Water Tube Boilers supplied to JDW Sugar Mills (Pakistan).

Contract Value Pak. Rs. 130 Millions.

b- Engineering Manager for 2x80 TPH @75 BarG, 520+10ºC Bagasse Fired Water Tube Boilers supplied to Almoiz Industries Ltd. (Pakistan). Contract Value Pak. Rs. 350 Millions.

c- Engineering Manager for 30TPH @14BarG, 220ºC Water Tube Boiler supplied to Vimpex (Syria)

Responsibilities included the following:

Performed pressure parts design calculations for below listed projects, drawings checking, got approval of pressure parts design packages including design calculations and drawings from recognized third parties i.e. Lloyds (UK), TUV (Germany), HSB (USA), SGS (UK), Bureau Veritas (France) etc.

Sr. #

Project Title

Client

01

2x30 TPH Water Tube Boilers

National Floor Mills - UAE

02

LPG Bowzers

Mass Jordan Company - Jordan

03

CO2 Bowzers

Iraqi Company

04

25 TPH, 17.93 BarG Water Tube Boiler

Assuit Refinery (ASORC) - Jordan

05

80 TPH, 350+10ºC, 29 BarG Bagasse Fired Water Tube Boiler (Design Year 1998-1999)

Jamal Din Wali Sugar Mills – Pakistan ( JDW 1)

06

80 TPH, 350+10ºC, 29 BarG Bagasse Fired Water Tube Boiler (Design Year 1999-2000)

Kohinoor Sugar Mills Limited

07

60 TPH, 360+10ºC, 26 BarG Bagasse Fired Water Tube Boiler (Design Year 1999-2000)

Noon Sugar Mills Limited

08

2x80 TPH, 350+10ºC, 29 BarG Bagasse Fired Water Tube Boilers (2003-2004)

Jamal Din Wali Sugar Mills - (JDW 2)

09

2x80 TPH, 75 BarG, 520+10ºC Bagasse Fired Water Tube Boilers (2005-2006)

ALMOIZ Industries -

10

80 TPH, 460 + 10 ºC, 760 PSIG Water Tube Boiler

National Refinery

11

3x41 TPH, 17.5 BarG Water Tube Boiler

CPC Rafhan Maize Limited

12

10 TPH, 32 BarG Water Tube Boiler

ICI Pakistan Limited

13

22 TPH, 25 BarG Water Tube Boiler

General Tyres Limited

14

05 TPH, 30 BarG Water Tube Boiler

Tri-Pack Films Limited

15

15 TPH, 12.5 BarG Fire Tube Boiler

Nishat Textile Mills

16

15 TPH, 12.5 BarG Fire Tube Boiler

Afroze Textile Mills

17

15 TPH, 12.5 BarG Fire Tube Boiler

US Apparel Textile Mills

18

15 TPH, 20.68 BarG Fire Tube Boiler

United Industries Limited

19

15 TPH, 20.68 BarG Fire Tube Boiler

Zulfiqar Industries Limited

20

2x15 TPH, 14 BarG Fire Tube Boilers

Nakshbandi Ind. Limited

21

05 TPH, 12 BarG Fire Tube Boiler

Merk Sharp & Dome Pvt. Ltd.

22

02 TPH, 12 BarG Fire Tube Boiler

Leather Connection

23

05 TPH, 19 BarG Fire Tube Boiler

Gamalux.

24

04 TPH, 17.23 BarG Fire Tube Boiler

Packages Limited

25

08 TPH, 10 BarG Fire Tube Boiler

Saleem Brothers Mills Limited

26

3.6 TPH, 17.23 BarG Fire Tube Boiler

Roshan Packages Limited

27

08 TPH, 12 BarG Fire Tube Boiler

Afroze Textile Mills

28

05 TPH, 12 BarG Fire Tube Boiler

Coca Cola Industries

29

2x08 TPH, 8 BarG Fire Tube Boiler

Dewan Farooque Motors Ltd.

30

05 TPH, 12 BarG Fire Tube Boiler

Faisal Spinning Mills Limited

31

05 TPH, 15.5 BarG Fire Tube Boiler

Fauji Cereals

32

04 TPH, 17.23 BarG Fire Tube Boiler

Mahr Garments Limited

33

05 TPH, 12 BarG Fire Tube Boiler

Otsuka Industries Limited

34

08 TPH, 12 BarG Fire Tube Boiler

Quetta Textile Mills Limited

35

2x04 TPH, 12 BarG Fire Tube Boilers

Rawalpindi Medical College

36

04 TPH, 12.5 BarG Fire Tube Boiler

Wartsila Diesel – Pakistan

37

15 TPH, 20.68 BarG Fire Tube Boiler

Colgate Industries Limited

38

20 TPH, 12 BarG Waste Heat Recovery Fire Tube Boiler

Master Textile Mills Limited

39

3x1.48 TPH, 19 BarG Duplex Type Waste Heat Recovery Fire Tube Boiler

ICI Pakistan Limited

40

0.748 TPH, 19 BarG Simplex Type Waste Heat Recovery Fire Tube Boiler

ICI Pakistan Limited

41

400,000 IGPD, 03 BarG Water Heater

Liberty Mills Limited

42

Salt Heater

Sitara Textile Mills Limited

43

CO2 Bowzers & Storage Tanks

Khair Enterprises Ltd.

44

LPG Bowzers and Tanks

Ranja Enterprises

45

CO2 Bowzer

Packgas Limited

46

LPG Bowzer

Caltex Limited

47

LPG Bowzer

SHV Energy Limited

48

Knockout Drum

British Petroleum

49

Nitrogen Vessel

OMV Limited

50

Filter Vessels

National Refinery Limited

51

Water Softening Plants

Nishat Textile, Style Textile, Liberty Mills, Mustaqeem Dyeing etc.

52

De-aerators

National Floor Mills, General Tyre, Engro Asahi Polymer etc.

53

HCl Tank

Sitara Chemical Limited

54

LPG Tanks

Pakistan Oilfields Limited

55

Heat Exchanger

Dyno Mills Limited

56

Heat Exchanger

Engro Chemicals Limited

Other Responsibilities:

Piping Plans & Piping Isometrics checking for above Projects

Vendor quotation verification, material specification preparation, issued O&M Manuals for above Projects.

Material estimation from drawings and project technical proposal preparation at bid stage.

Non-pressure parts mechanical design calculations

Suitable material selection for pressure & non-pressure parts using ASME, DIN & BS Standards

Manufacturer Data Certificates preparation

Sales & Marketing Engineer (1997 - 1998)

Sales and marketing, material costing, technical and commercial proposal preparation for following:

Water Demineralization, Filtration and Softening Plants

Boilers (Fire Tube, Water Tube, Bagasse Fired, HRSG’s, Water Heaters etc.)

Power Plants (1-20 MWe), Overhead Travelling Cranes, Belt Conveyors, Pan Conveyors etc.

Construction Manager (1996 - 1997)

Client: American Electric Supply Corporation (AES - USA)

Plant Capacity: 2 x 365 MWe Power Plant

(i) Supervision of Steel Structure, Equipment & Piping Erection, road work, tanks concrete work, building work, cable laying, panels and motors erection

(ii) Training of client personnel on the operation of system. Commissioning & handing over of the project

Projects Co-ordinator (1995 – 1996)

Cement Plant Capacities: 3000 Tons/Day & 5500 Tons/Day

Client: Fauji Cement & Lucky Cement Corporations.

(i) Material take-off from the drawings and indenting

(ii) Material sourcing and comparative statements Preparation

(iii) Co-ordination with production shop and fabrication planning

Design & Estimation Engineer (1994 – 1995)

Designing, material estimation and drawings checking for overhead traveling cranes, belt conveyors, apron feeders etc.

Codes & Standards Knowledge

ASME Section I

ASME B31.4

TRD (Technical Rules for Boiler Design)

ASME Section. VIII Division I

ASME B31.8

AD Merk Blatter

ASME Section VIII Division II

API 620

EN Standards

PD5500, BS 2790

API 650

Pakistan Boiler Code

ASME B31.1, ASME B31.3

ASME Section II Part A & Part D

TEMA

Computer Knowledge

Micro Soft Word, Excel, Power Point etc.

Heat Exchanger Design Software’s

Pressure Vessel Design Software’s (PV Elite & Compress VI)

MS Project, Auto Cad and Auto view

Review and approval of Project Schedules in Primavera (P 6)

Piping Design Software (AUTO Pipe)

Trainings

CDM Regulations in MOUCHEL (UK)

Objectives and Goals Setting in FFL (PAK)

Hazard Analysis and Risk Assessment in MOUCHEL (UK)

ASME Sec. VIII Div. I and Div. II in DESCON (PAK)

Emotional Intelligence in FFL (PAK)

PTW in Oryx GTL (QATAR)

Leadership, Care and Growth in FFL (PAK)

JHA and Working at Height in Oryx GTL (QATAR)

Unleash the Power Within (PARCO - PAK)

Fire Fighting, first aid (QATAR and PAK)

ACADEMIC RECORD

Sr. No.

Degree/Certificate

Year of Passing

Grade

%age Achieved

1

M.Sc. Mech. Engg. (Production Group)

1994 - 1996

18 Months Post Graduate Diploma

Main Subjects: Production Engg, Planning & Control, Human Resource Management

2

B.Sc. Hons. Mech. Engg. (3rd Position in University)

1989 - 1993

A

78.04%

Main Subjects: Machine Design, Mechanical Engg. & Drawings, Industrial Materials, Power Plant, Heat Transfer, Thermodynamics, Quality Control, Hydraulics, Internal Combustion Engines, Refrigeration and Air-Conditioning, Engg. Mechanics, Applied Electricity, Strength of Materials, Numerical Analysis, Applied Mathematics.

3

F.Sc. (Pre-Engg.) (1st Position in College )

1986 - 1988

A

75.27%

Main Subjects: English, Mathematics, Physics, Chemistry

4

SSC (1st. Position in School)

1984 - 1986

A+

84.11%

Main Subjects: English, Mathematics, Physics, Chemistry, Biology



Contact this candidate