Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Conroe, TX
Posted:
February 23, 2018

Contact this candidate

Resume:

SUMMARY

Interested in working for a company who takes pride in achieving cultural diversity, inclusion, team and a safe friendly work environment where my diverse background and experience can be utilized. Over 15+ years of diverse experience in the oil and gas industry in the following areas: detail pipeline design engineering, pipeline integrity management, pipeline construction, pipeline control and operations, project management, chemical plant process operations, electrical power generation, pipeline regulations and compliances.

PROFESSIONAL SKILLS

Ability to work under pressure in a fast moving and changing environment.

Strong interpersonal, team leadership skills with ability to communicate internally & externally.

Ability to work independently and with minimal supervision.

Strong analytical and problem solving skills.

Able to manage multiple projects effectively.

Ability to develop and execute project execution plans and prepare project scope of work.

Ability to develop and review cost estimates and evaluate contractors bid submittal packages.

Strong leader with success directing and managing multiple projects and project initiatives.

Have excellent written, verbal communication, problem solving and decision making skills.

Ability to develop new business relationships.

PROFESSIONAL OIL / GAS PIPELINE DESIGN and ENGINEERING EXPERIENCE

Shafter, Kline and Warren

Sr. Project Manager

05/2013–02/2017

Babcock Eagleton / Universal Ensco

Sr. Pipeline Engineer

12/2005–05/2013

Directed the Design and Construction of the Following Projects

A 335 mile, 42” Natural Gas Pipeline. Budget $350M.

A 183 mile, 18” Natural Gas Pipeline. Budget $190M.

A 53 mile, 18” Hydrogen Gas Pipeline. Budget $15M.

A 9 mile, 3”, 4” and 8” CO2 Injection - Gathering Pipelines. Budget $15M

A 5 mile, 6” Oil Sales Pipeline Budget $1M.

A 5 mile 12” Emulsion Pipeline. Budget was $27M.

A 23 mile, 6” and 8” Chlorine Pipeline. Budget $18M.

A Make Pipeline Pig-gable Projects. Budget 700K.

A 18”, 24” and 30” Integrity Manage Pipeline Replacement (Segments). Budget $4M.

A 5 Mile, 6” Sulfuric Acid Pipeline. Budget $3M.

A Sale Meter Interconnect 4” and 8”. Budget $380K.

A 1,800’, 8” and 10” Directional Horizontal Drill. Budget 400K.

General Duties and Responsibilities: Directed the Design and Construction of Pipelines.

•Identified, selected & developed pipeline routing.

•Reviewed geographical feasibility of routes.

•Identified / mitigated environmental critical areas.

•Identified and mitigated cultural sensitive areas.

•Completed project estimates & feasibility studies.

•Directed civil and environmental survey teams.

•Designed crude oil, gas liquid and CO2 pipelines.

•Conducted Process Hazard Analysis (PHAs), Hazard and Operability (HZOP’s) Reviews.

•Coordinated, directed field construction activities.

•Directed company 3rd party engineering teams.

•Coordinated Federal Energy Regulatory Commission (FERC) (7c) report filings.

•Knowledgable of Code of Federal Regulations (49-CFR) 192, 195 and American Society of Mechanical Engineers (ASME) B31.4 and B31.8.

•Directed the design and construction of pipeline laterals and pipeline reconfigurations.

•Identified / developed project task registers.

•Created construction scope documents & bids.

•Directed material tracking and logistics.

•Directed field construction with multiple contractors.

•Designed meter stations and pipeline interconnects.

•Conducted procurement / logistics of material.

•Coordinated the developed of commissioning documents and job books.

•Operated, monitored and controlled oil/gas liquid pipelines utilizing Supervisory Control and Data Acquisition (SCADA) systems.

•Developed new business relationships.

•Secured master service agreement contracts.

•Developed / maintained project progress report

•Knowledgable of Pipeline and Hazardous Material Safety Administration (PHMSA).

•Identified work scope and developed job plans for pipeline compliance and integrity projects.

•Coordinated contractor field inspection and completion of integrity hydrostatic test.

•Directed the fabrication for skid packages.

PROFESSIONAL ENERGY EXPERIENCE CONTINUE

Teppco / Calpine

Pipeline Controller

04/2001–12/2005

Roy F. Weston / LAN

Construction Project Manager

05/1992–04/2001

Rohm & Hass Chemical

Process Technician

07/1986–05/1992

•Operated and controlled the transportation of oil/gas movement through transmission pipelines.

•Utilized the Supervisory Control and Data Acquisition (SCADA) system to monitor the operating parameters.

•Provided oversight project management for construction of a $265M incinerator processing facility.

•Ensured contractors design specifications, operating parameters and procedures were followed in accordance with regulations.

•Operated, and controlled the following facilities distillation, esterification, oxidation, waste water treatment, separation, tank terminal and rotating equipment.

•Utilized the Honeywell computer system to monitor the operating parameters.

EDUCATION & CERTIFICATES

Bachelor of Science, Petroleum Engineering Service, Nicholls State University, Thibodaux, Louisiana

Associates of Science, Petroleum Safety Technology, Nicholls State University, Thibodaux, Louisiana

Certification, Petrochemical Plant Process Operations, San Jacinto College, Pasadena, Texas

Certification, Transportation Workers Identification Card (TWIC)



Contact this candidate