EHTASHAM KHALID
*.**********@*****.***
Mobile # 055*******
OBJECTIVE
Seeking a challenging and rewarding position in a growth oriented organization, which offers divers job responsibilities using my skills in order to become a productive member of the organization.
SKILLS AND ABILITIES
Dependable can work without supervision. Relates well to others at all levels and in any environment
Self-motivated and people motivator with proven leadership skills. Ability to reach a targeted goal.
Work well independently and as part of team, complementing proven problem solving capabilities.
QUALIFICATION
Bachelor of Science B.B.A University. Muzaffarpur, India 1988
Electrical Engineering- Karnataka Technical Education
Board Bangalore. (INDIA) 1995
Diploma in Industrial Safety Management All India Institute -1999
Quality management System Lead Auditor, ISO9001-2015 IRCA Certified
Resource Inspection Canada Incorporated, Toronto – Canada
Quality Management System Seminar Attended
Employment History: Total 18 years
Name of organization
From
To
Position
For Saudi electric co.
Jan 2017
Sep2017
QCM assistant
Saudi Aramco Dow Chemical Co. (SADARA)
May 2013
Oct 2016
Quality Control Manager
Saudi electric co.
June 2009
March 2013
Inspection Engineer
A. A.Nayyan
March 2007
May 2009
QC Supervisor
A. A.Nayyan
December 1999
March 2004
QC Inspector
Al Bawardi
Aug 1997
To Nov1999
QC Inspector
Sandhi Private Ltd.
Mar 1995
June 1997
Project Management Team
COMPUTER SKILLS
Expertise in using Windows, Microsoft Word, Excel, Power Point, and other related applications. SAP Operating system, Proficient in Internet Browsing.
From Jan 2017 Onwards involve in Advanced metering infrastructure (AMI)
Saudi Electricity Company (SEC), Through Sendan international co.
AMI is an integrated system of smart meters, communications networks, and data management systems that enables two-way communication between utilities and customers. SEC –Project
Coordinate with AMI Suppliers to verify their compliances with the requirements of the customer.
Coordinate AMI system software and test benches with vendors.
Attending meeting with vendors to discuss the various technologies available for the implementation of the AMI system.
Involved in bidding process.
Prepared the related documents including quality objective, method of statement for the Smart meter installation, cost of poor quality, and inspection plan Involved in estimating the meter installation of different geographies.
Saudi Aramco Dow Chemical Co. (SADARA)
ISO Cyanates Plant Project (TDI/PMDI)
JubailDaelim Saudi Arabia Co.Ltd. Through Sendan International co.Ltd
May 2013 to Oct 2016
As QC Manager
Function/Responsibility
Responsible for all Quality activities Electrical, instrumentation, welding, Painting and Coating at site as per client’s and schedule Q requirements. Involved company’s audit and management review program as per quality management system.
Management and implementation of the Project Quality Management System and the Project Quality Control Plan.
Implement the detailed requirements of ISO 9001:2008 for Quality Management Systems (QMS).
To continuously monitor the application and performance of Project and Company procedures and work practices.
To develop a Discipline Audit program for all activities on the Project and conduct both internal and external Quality Assurance Audits.
Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project plan preparation.
Coordination with main contractor and Client quality department.
Attending weekly quality meeting with client and EPC Coordinate to closing NCR, Follow Preservation punches Involve during procurement phase of the project subject to quality concerns. Responsible for tracking of Nonconformance report and measuring and test equipment calibration record Responsible for the clearance of punches and all quality documents (Dossier) turnover to client
SAUDI ELECTRICITY COMPANY (SEC)
June 2009 to March 2013
Inspection Engineer, Project Management Team
Responsibilities:
Review and approval of contractors inspection and test plans procedures work instructions and vendors quality submittals
Inspection of SEC equipments Transformer, Distribution panel, Switch Gears on site maintaining the inspection report accordingly scheduling for shut down and preventive maintenance action
Inspection during shut down under maintenance equipment to make sure the assigned job completed without any error.
Inspection of preventive maintenance equipment as per SEC standard
Inspection of ongoing new substation and guide contractor
Ensure that aims, goals, and objectives are accomplished in accordance with outlined priorities, guidelines & time limitations.
Inspection of Preventive maintenance of substation Distribution Transformers & L.V.Panel from 150KVA to 2500 KVA Different Make
Follow up and supervise to maintain the proper records.
A.A. Nayyan Electric Corp.
Working as QC Supervisor
March 2007 -May 2009
Conduct preconstruction meetings with new and existing subcontractors and the superintendent at least two days prior to the start of each new phase of the work to discuss issues that affect quality. Document these meetings in the daily QC report and Preparatory Phase reports
Verify detailed records and reports for all inspection conducted at the site and maintain the quality control documentation involving regular quality control meetings with the contractor& correlate prepare and issue the weekly inspection notice to the contractor.
Responsible for coordinate advising and instructing &subcontractor staff on all matters relative to quality control aspects of Electrical
Developed Quality Documentation
Monitoring the installation and testing of various panels, such as synchronizing panels, generator control panel etc., as per the approved procedure
Conduct periodic follow-up audits to verify that work is proceeding with the contract documents and the approved submittals
Working as QC Inspector
December 1999 –March 2004
Ensure work complies with project standards and specifications which involve inspections.
Co-ordination and carrying out all Electrical activities for the project
Monitor the requirements for storage of materials
Ensure that tools and equipment are efficiently calibrated
Preparation of reports required by the QA/QC Department, project allocations.
Assist in the overall improvement of operating and quality systems
Coordinated with construction for punch lists for the contractor and develop a final punch to inspect the end user
Maintain the project "as-built" drawings on a daily basis
Taking preventive and predictive actions for the non conformities observed in site.
Responsible for monitoring of electrical items storage as per the contract requirements Responsible for over all quality control for instrumentation work of all the construction work of all the construction activities on site
Ensure that all inspections are executed efficiently and expeditiously in order to comply with the Engineering Standard
M/S AL BAWARDI
Aug 1997 To Nov1999
Working as QC Inspector
Establish uniform system for all construction to prepare and submit accurate and complete project test and inspection records to prepare QC Dossier for all disciplines for the construction installation activities.
Responsible for the over implementation of quality assurance and quality control related to electrical work in accordance with project specification
Field inspection in accordance to standard, Surveillance and corrective action report and upon completion closing
Preparing data and analysis for management decisions, effecting quality control operations
Reviews and interprets engineering drawings schematic diagrams
Evaluates data and prepares summaries to validate or show deviations from existing standards to achieve optimum quality and production within limits of equipment capability.
Attain meeting with vendors, customers, quality representatives
SANDHI PRIVATE LTD
Project Management Team
Mar 1995 June 1997
Construction projects power field starting activities from electrical installation up to final acceptance, writing and revising inspection test plans and implementing necessary corrective action .
Focus on to handle electrical projects from initiation till closeout & transfer of care custody and control stages. Beside this to provide the technical leadership to all assigned electrical projects as well multidiscipline projects to ensure the compliance to standard and specification responsible to conduct electrical studies along with detailed engineering role to ensure electrical system /equipment integrity and to complete assigned projects safely and successfully.
Developed and tested, installation of power distributions panel, variable speed drive its assembly wiring, commissioning, fault finding machineries and equipment’s applying knowledge of electrical engineering technology, under the direction of engineering staff.
Prepared specifications of device and test to ensure product quality
Personnel Details
Religion : Islam
Nationality : Indian
Marital Status : Married
Date of Birth : 05-Sept-1967
Driving license : Valid Saudi driving License