Reynaldo “Ray” Cantu
Mailing Address: Contact Information:
**** *. * **** ** Cell (US): +1-806-***-****
Mission, TX 78574 ac4dbp@r.postjobfree.com
OBJECTIVE: A Well Operations Engineer to design and add value through Field & Well Production Optimization, Workovers, Completion & Drilling Projects &/or as a Wellsite Field Engineer in a team environment.
EDUCATION: ROBERT GORDON UNIVERSITY 9/12 – December 2013
M.Sc. in Drilling and Well Engineering (Aberdeen, U.K.)
TEXAS TECH UNIVERSITY December 2005
B.Sc. in Mechanical Engineering
EXPERIENCE:
Alief High School – Teacher (Concepts of Eng, Eng. Design & Architecture Design) – Houston, TX 11/16-5/17
In-Transition: Laid-off due to company cut backs in lieu of oil crash; applying for opportunities 8/15-8/16
Hunt Oil – Drilling Engineer (Wellsite Drilling/Completions Field Engineer) Kurdistan - Iraq 6/14-5/15
Monitor Drilling Operational parameters: ROP, Trip and Connection Times, Trip Tanks, Flow Rates, Bottom Hole Pressure (BHP), Flowing Temperatures, Pump Pressures, Kicks, Mud Logging Returns
Assist Day Drilling Supervisor in Field Ops and coordinate planning, coordination of logistics & operations on well site, Daily Wellsite & Cost Reporting, Weekly Team Operations Reports, Lessons Learned, Supervision of Well Testing Operations for Rig Up, Data Gathering and Rig Down
Night Duties: Assist Night Supervisor with Operations, Fill-In & Perform Night Drilling Supervisor Duties
Drilling Eng Calculations: Cementing Volumes, Hydrostatic & Downhole Calculations, Liner & Csg w/ Cementing Procedures, SID’s (standing instructions to driller – short procedures)
AFE Cost Tracking & Forecasting, AFE Supplemental Justification, Verify Field Tickets & Contracts
Down & Trouble Time Cost Analysis, Failure Tool & Ops Investigations, Well & BOP Schematic Updates
Exploratory Drilling, HPHT Drilling & Completion Operations, Under-Reaming, Casing & Liner Installations, Cementing Operations, Open-Casing Hole Logging, Acid/N2 Stimulations, ESP/non-ESP Well Testing, TCP & E-line Perforating, Vertical Directional Drilling, Workovers, Completions, Casimg/Cementing Remedial Jobs, Fishing Operations, Coil Tubing Operations, Monitor LWD & MWD Operations & Reports
ConocoPhillips – Production Engineer (Artificial Lift–Workovers–Re-Completions-Ops) E. Texas 6/10-8/12
Manage: Field Production, Projects, Budgets & Operations for a gas field: 22.5 mmcfpd & 160 bopd
Design, Implement and Production Optimization of Projects by for $1.87 MM Capex, $355 M Opex Budget
Production Surveillance of wells, data evaluation, IPR well & well modeling, decline curve analysis
Projects: Re-Completions, Workovers, Coil Tbg, Casing Repair, Wireline & E-line Operations, Plunger Lift,
Gas Lift, Pumping Units, Velocity String, Capillary String, Plug & Abandonment Operations, Well Integrity
$1.9 MM SWD Drilling Project Management: Drilling Cost Estimate, Pad Site Planning, Casing & Cement Design Input, Regulatory & Lease Obligations, Dual Drilling & SWD Operations Planning, Completion Design
Coordinated Operations & Wrote Procedure, AFE Estimates & P&A of Haynesville Shale & DFIT &
P&A of Bossier Shale, Frac & Completion of Cotton Valley. Expected 1mmcpfd IP & 900mmcf EUR
Well Integrity Project: researched regulatory & testing procedures for annular gas pressure liabilities
2011 Results: 44 Projects Resulting: 4.1 mmcfpd 8.2 bopd in UpLift & Loss Avoidance
2010 Results: 28 Projects Resulting: 3.7 mmcfpd 7.4 bopd in UpLift & Loss Avoidance (half year)
ConocoPhillips – Production Engineer (Artificial Lift–Workovers–Re-Completions-Ops) E. Texas 3/08-5/10
Manage Field Gas Production, Operation Projects & Support for a gas field: 8.5 mmcfpd & 60 bopd
Design, Implement, and Optimize Gas Lift and Pumping Units Projects: $2MM Capex, $500M Opex
Production Surveillance of wells, data evaluation, IPR well & well modeling, decline curve analysis
2010 Asset Sale, projects suspended; 2009 Results: 21 Projects Resulting: 2.25 mmcfpd & 16 bopd
in UpLift & Loss Avoidance with stopped operations from 2009 Recession & low Gas prices.
2008 Results: 29 Projects Resulting: 1.4 mmcfpd & 16 bopd in UpLift & Loss Avoidance
Saved $2MM Capex funds for an Uneconomic, high risk and Liability of SWD Well or Pipeline Project
ConocoPhillips – Petroleum Developmental Projects Engineer
Reservoir Projects 12/07-2/08
Evaluate and Recommend a Fracture Stimulation Program. Identify and Reservoir Add Pay Zones.
Production & Completions Projects 9/07-11/07
P&A’s, Production Surveillance, Plungers, Workovers, Completion & Fracture Stimulation Design
Drilling Projects 5/07-8/07
LRP Planning on the Chittim Infield Drilling Project, Audit Historical Performance and Cost Evaluations.
15-20% Reduced LRP Drilling Cost Estimate by identifying & leveraging Drilling & Completion Processes.
Proposed Coil Tubing Drilling as Technology Step Change in Drilling process compared to a traditional Kelly drilling rig reducing drilling time from 6-7 days to 2-3 days.
Identified horizontal drilling & reservoir drainage opportunities by confirming other operators drilling trends
in the area. As Result Developmental Team decided to pilot test horizontal production wells in 2008.
Cost reductions & Coil Tbg Drilling resulted in ROR of 20% for infield development.
$450M Identified in Potential Savings from Fixed and Time Costs comparing OBO & COP drill operations
Facilities Projects 1/07-4/07
Facilities Upgraded Design & Equipment for Water Handling System, Water Injection Station & Tank Battery
100 BOPD from Gravity Separation, Operations Efficiency, Mitigated HSE Risk to Reportable Spills
Production Projects 6/06-11/06
Production Surveillance, Project Identification, Wrote Artificial Lift & Work-Overs AFE & Procedures.
Optimization Studies: Field Pump Failures & Completion Performance Reviews & Recommendations.
TOOLS & SKILLS:
Microsoft Office Applications; Economics Software: Schlumberger Merak Peep; Wellview; SAP
Wellsite Field Engineering for Drilling, Production, Workover & Recompletion Operations
Production Optimization, Gas Well Dewatering & Deliquification, Artificial Lift;
Well Modeling & Nodal Analysis Programs:
oIPM – Prosper – GAP – MBAL; Weatherford’s WellFlo Well Modeling & Design; SNAP Nodal Package
Sucker Rod/Pumping Unit Software: Theta XSPOC & RODSTAR; Lufkin SROD & Controller; QROD
Landmark: StressCheck, Casing Seat, WellCat (novice)
Echometer’s Total Well Management - Fluid Level Shot Analyzer of Oil & Gas Wells
INDUSTRY COURSES:
Petroleum Experts Prosper, MBAL, GAP: 1/11
PetroSkills: Basic Reservoir: 6/10
Smith International: Production & Completions Seminar: 2/10
Echometer Plunger Lift & Gas Well Analysis using Digital Echometer Analyzer: 10/09
ConocoPhillips: Gas Lift Technology Seminar: 8/09
PetroSkills: Performance Analysis, Prediction, Optimization with Nodal Analysis: 5/08
Weatherford: Gas Lift Analysis & Design Seminars: 3/08
Weatherford: Artificial Lift Training School: 1/08
Texas A&M Frac School: 10/07
Meyer & Associates: Hydraulic Fracturing: 10/07
PetroSkills: Oilfield Water Production, Handling, & Injection: 3/07
Midland College: Intro to Log, Petrophysics & Inj Intrepretation: 10/06
Petroskills: Completions & WorkOvers: 8/06
Rike Service Training: Downhole Completions & Workover Operations: 8/06
Colorado School of Mines: Petroleum SuperSchool: 7/06
CERTIFICATIONS:
IWCF Level 4 Drilling Well Control Programme- urface and Subsea BOP Stack 10/14 - 10/16
IADC WELLCAP Supervisor's Drilling/Completion/Workovers-Surface/Subsea BOP Stack Qualification 8/14 - 8/16
LANGUAGES:
English (Native) Spanish (Fluent, Advanced) Portuguese (Proficient, Intermediate)