ac4d8x@r.postjobfree.com 832-***-**** LINKEDIN.COM/IN/TROYCHURCH
TC
SUMMARY
Over 20 years of professional
experience, with primary
responsibilities including
development and implementation
of project controls processes and
systems for successful project
management and reporting.
Experienced in managing and
executing all phases of planning,
cost, scheduling, and progress
management across various
industries.
SKILLS
Scheduling, Estimating and Cost
Controls. Working with project team
to develop a manageable project to
meet objectives.
TROY L. CHURCH
MASTER SCHEDULER PROJECT CONTROLS
832-***-**** ac4d8x@r.postjobfree.com
EXPERIENCE
PRIMAVERA TRAINER • EXXONMOBIL Sept 2017 to Current
Provide Primavera P6 training support to EMRE’s Global Manufacturing
Training of scheduling fundamentals & P6 software essentials
Training of advanced scheduling techniques
LEAD TURNAROUND SCHEDULER • BRUNEI LNG Jan 2017 to Sept 2017
Identify equipment and special tools requirements
Identify safety and environmental constraints and requirements
Identify permitting requirements; input into schedule.
Develop BOM (materials requirements)
Develop detailed job plans (resource and duration loaded)
Review job plan packages with departments and contractors, as required
Develop job plan packages for approved field change orders
Utilize engineering drawings, as necessary, to get required estimating detail.
Evaluate job plan methodology, schedule impact and consider trade-offs or technique changes optimize cost and schedule.
Compare actual hours vs budget estimates, analyze trends; report daily
Monitor daily work progress during execution and forecasting completion
Input job plans into scheduling software
Package and make logic ties per scheduling strategy
Develop reports & test prior to execution of T/A to ensure reporting accuracies
Support team as required to deliver on time and under budget
Completed project on schedule and slightly under budget LEAD SCHEDULER/PLANNER • DOW CHEMICAL Jun 2005 to Dec 2016
Provided project controls supervision for 15 resources located in six engineering centers
Prepared FEED licensing packages
Executed strategy to include 200 outsourced engineering & 250 global client personnel
Led team to the completion of extremely aggressive timelines within budget
Developed/implemented scheduling, estimating, & cost mgmt. procedures
Provided program-level Subject Master Expert to Project Director, mentored and trained schedulers as required to meet the demands of the program TC TROY L. CHURCH
MASTER SCHEDULER PROJECT CONTROLS
832-***-**** ac4d8x@r.postjobfree.com
ac4d8x@r.postjobfree.com 832-***-**** LINKEDIN.COM/IN/TROYCHURCH 2
PROJECT CONTROL LEAD • DOW CHEMICAL
Supervised the scheduling, cost reporting and tracking tool to control the construction phase of a turnaround and debottlenecking to increase capacity by 60% on Dow’s ethylene cracker
Accountable for Project Controls from engineering to close-out of turnaround
Developed construction cost report for management to include all site contractor labor, materials and equipment by extracting data from the multiple contractors performing the turnaround
Supervised/approved/reported contractor timesheets, cost reports, invoices, and estimated potential costs and unknowns
Provided Finance with work-in-place for accruals; assisted Project Managers with forecast development for monthly financial reporting LEAD SCHEDULER • DOW CHEMICAL
Developed schedules and tracked schedule variances; made suggestions to ensure the project met the baseline plan
Developed project plan and met all established project deadlines
Communicated roles, expectations, and accountabilities to team members
Managed updates from EPC firm to ensure accurate reporting
Gathered data from all vendors on a weekly basis, including the EPC firm, and reviewed the schedule and progress reports with the project team
Tracked, analyzed and provided timely reports to allow the project teams to manage projects and evaluated weekly reports
PROJECT LEAD • DOW CHEMICAL
Supported the project control needs during the FEL to ensure all project control deliverables were timely and consistent
Ensured scheduling, estimating and cost aligned and reported consistently
Verified accuracy of all project control deliverables as well as timelines to support each phase of the project
ACCOMPLISHMENTS
Primavera P6 Certification
Computer Assisted Scheduling and Planning
Open Plan
Level II Welding Inspector (GTAW/Tig, Arc Welding SMAW, and GMAW/Mig)
Project Management Institute member
TC TROY L. CHURCH
MASTER SCHEDULER PROJECT CONTROLS
832-***-**** ac4d8x@r.postjobfree.com
ac4d8x@r.postjobfree.com 832-***-**** LINKEDIN.COM/IN/TROYCHURCH 3