IENCE
Professional Summary
Over ** years of experience in the construction industry specializing in highway and bridge construction, heavy civil design and engineering that include pre-stressed and reinforced concrete, post-tensioned structures, structural steel, roadway construction and marine pile driving. Highly qualified by virtue of experience, technical training and continuing education. Successful in management of construction personnel such as owners/clients, and subcontractors in order to achieve the best possible result, on time, and within budget. Managed diverse range of government and commercial projects. Have a thorough knowledge of the Construction Control Management and Quality Management System. Proficient in construction management, scheduling, quality assurance and government (customer) reporting and field documentation.
Waagner – Biro RUS Nov 2017 Present
High-rise building Construction
Position
Supervisor
Project:
MFB Lakhta center
Responsibilities
- Construction progress at assembling of steel structures and facade glass panels;
- Quality Control (survey control, measurements, welding, bolts tightening and etc.);
- HSE (scaffolds, crane operations, working permits and etc.);
- Materials delivery and storaging;
- Managing of subcontractors activities (over 70 workers and staff);
- Preparation of weekly plans and organization of meetings with subcontractors.
Astaldi - IC Ictas JV Nov 2016 Nov 2017
Highway Construction
Position
Lead Quality Engineer
Project:
Moscow-Saint-Petersburg M-11 Highway Project. Budget – 1.5 billion dollars. Connection to existing Ring Road around Saint-Petersburg under my direct supervision (5 bridges, 4 culverts, 6 retaining walls and over 9 km of 6 lane high speed highway).
Responsibilities
- Managing own and subcontractor’s teams – over 100 people under direct control;
- Overseeing construction site and subcontractors activities with the critical points at Quality Assurance, HSE principles, approval of working permissions and procedures, such as steel assembling works, concrete works etc.;
- Working with design team and solving design problems at construction site;
- Negotiating contract issues with subcontractors and client;
- Conduction inspections of the construction site with the Client and Technical Experts;
- Ensuring that all site activities were done in right standard, contract and working design;
- Conduction of quality audits;
- Organization of laboratory inspections and tests;
- Responsible for Non-Compliance forms closure;
- Reporting to the Project Managers and Client.
Achievements
I came to M-11 project at the beginning of November 2016. Since that time, I prepare and reorganize all construction site. Large scopes of misunderstanding between the Client, General contractor and Subcontractors were solved. About 35 Non-Conformance Reports (NCR) was closed and most critical milestones were completed with the minimal wastes of time. My part of the M-11 project become most progressive than the others.
Astaldi - IC Ictas JV Aug 2013 Nov 2016
Bridge Construction
Position
Lead Quality Engineer
Project:
Western High Speed Diameter (Central Sector). Budget – 2 billion euro.
Petrovsky Cable bridge added to my responsibility (60 + 110 + 220 + 110 + 60 meters spans, the height of the pylons is 125 meters, 2 single pylons) and 1500 meters length of the overpass on the approach to the bridge (6 lanes, 30 meters pier bodies height).
Responsibilities
- Managing own and subcontractor’s teams – over 150 people under direct control;
- External relation with Designer, Client and Consultant;
- Internal relation with Design, Project Control, Procurement and Financial department;
- Reporting to the Client, COWI (Technical Experts) and Project Managers;
- Quality assurance, HSE, and Design problems solving on site;
- Supervision of steel erection and concrete works;
- Supervision of stay-cables installation and pre-stressing, anchorage fixing, tensioning; protecting system preparation and installation;
- Supervision of main span segment lifting with the launching gantry cranes;
- Supervision of back span launching with the hydraulic jack and tensioned cables;
- Control of the concrete slabs (main deck) installation with cantilever gantry cranes;
- Management of subcontractors activities with the operational control of working process;
- Daily, commissioning of own works and subcontractors activities (BEFORE and together with COWI technical experts and Client);
- Organization of laboratory control (concrete strength, control of welding and frixion joints assembling);
- Being responsible for sliding formwork technology for the pylons (114meters);
- Marine activities (from the construction of temporary flyovers with temporary platforms to the segment lifting from the barge with 2 tugboats).
Achievements
Successful coordination of international team of professionals at so large-scale project. Organization of ongoing process with the top technologies in the construction sector. Getting experience at Cable stayed systems, Heavy-lifting, Sliding formwork, Steel and concrete superstructures from the worldwide leaders: VSL, GleitBau and etc.
Mostootryad 19 Jul 2009 Aug 2013
Bridge Construction
Position
Site Engineer / Site Chief
Projects
North Sector of Western High-Speed Diameter at Saint-Petersburg;
South Sector Of Western Hign-Speed Diameter at Saint-Petersburg;
Bolshoy Obuhovskiy Bridge (cable-stayed bridge) at Saint-Petersburg;
Baltiyskaya Zhemchuzhina Residential Compound infrastructure (bridges, embankments);
Zenith stadium at Saint-Petersburg.
Responsibilities
-Erection of steel structures;
-Reinforced and pre-stressed concrete bridge structures; post-tensioning operations;
-Managing of the construction gangs and direct responsibility for the employers;
-Commissioning of works;
-Launching of steel superstructures;
-Drilling of the bored piles with the method of vertical moving pipes technology;
-Marine activities (pile installations, dredging works);
-Heavy-lifting of bridge segments;
-Installation of bridge segments with the gantry cranes;
-Ensuring that all works are executing according to all regulatory and contractual HSE & QA/QC principles.
Achievements
I was grow up as a professional Heavy-Civil Engineer and fully understand all site activities and technologies at bridge construction sector. I was spending more then 12 hours per day at construction site and always studying something about the construction. I got an excellent practice at bridge construction works from zero to the end. By the way, Mostootryad 19 was one of the biggest construction companies of Russia.
Mostootryad 19 Jun 2005 Aug 2008 (summer monthes)
Bridge Construction
Position
Site Engineer intern
Responsibilities
-Assembling and erection of steel structures and Reinforced concrete structures;
-Ordering materials and ensure site progress;
-Managing of the construction teams and reporting to managers.
LLC Chicino Jun 2003 Jun 2005
DAM maintenance
Position
DAM Caretaker (intern)
Responsibilities
-Operational control of DAM condition (Water stopper shield repairing, mechanism lubricating and cleaning of contaminations);
-Monitoring and regulation of water level.
Qualifications
2017: Certification at AC "Prometheus". Inspector II level of the visual and measuring testing of steel bridge structures.
2015: Training course at MPA University Stuttgart, Germany: "Specialist of Bearing installation in bridge construction and structural engineering".
Education
Aug 2012 - Jul 2014
North-West Institute of Management
Magister course of Government and Municipal Management
Dissertation: “Problems of corruption barriers at construction industry”
Aug 2004 - Jul 2009
Saint-Petersburg University of Architecture and Civil Engineering
Master course of bridges and tunnels
Computer skills
PC advanced user: Windows, MS Office, Excel, PowerPoint, Autocad.
Languages
- English fluent;
- Turkish basic;
- Russian native.
Other
International driver license.