Post Job Free

Resume

Sign in

Electrical Engineer Project Manager

Location:
Cagayan de Oro, Northern Mindanao, Philippines
Posted:
December 12, 2017

Contact this candidate

Resume:

GEORGE D. GODENEZ

CELL # ****-977-***-****

Email add. ac3omi@r.postjobfree.com

POSITION DESIRED: QC/QA ENGINEER/ MAINTENANCE ENGR.

I. OBJECTIVES:

To obtain a position in the field of engineering that will suit my qualification and to render the best of my knowledge and skills to your company in the implementation of electrical, mechanical & civil works projects.

II. EDUCATIONAL ATTAINMENT:

1987 – 1993 Elementary Graduate Mambaya-an Elementary School

Mambaya-an Balingasag Misamis

Oriental

1993 – 1997 High School Graduate St. Rita College

Balingasag Misamis Oriental

1997 – 2002 College Graduate Mindanao Polytechnic State College

Cagayan De Oro City

Course: Bachelor of Science in Electrical Engineering

Saudi Council of Engineer: Electrical Engr. (ID license: 63102)

III. JOB DESCRIPTION SUMMARY:

1.Eight years (9) experience in handling QA/QC including Testing, Planning,

Contract documents, In Testing Plan (ITP’s), Initial Acceptance Inspection (IAI), Certificate of Initial Acceptance Inspection (COIA), Operation & Maintenance Manual (O&M), Supervision and implementing site works as per required standards specification

2.Five years (5) experience in equipment facilities maintenance in industrial company as engineer in-charge

3. One (1) year experience in engineering design and construction firm.

IV. EMPLOYMENT RECORD:

Electrical Engineer (QA/QC)

Meralco Industrial Engineering Services Corporation (MIESCOR)

Balingasag Misamis Oriental Project

February 2017 to November 2017

Project Contract: 3 x 55 MW Thermal Power Plant

GENERAL RESPONSIBILITY:

1.In-charge of QA/QC testing, inspection of electrical, instrumentation and I&C erection works for the following items:

a.Substation and Transmission

b.Transformer (oil filled)

c.LV auxiliary Transformer (dry type)

d.Segregated and non-segregated phase bus duct

e.MV Switchgear

f.LV Switchgear

g.Station Battery system

h.MV power cable

i.LV power cable

j.Cable clamp and Termination

k.Cable Tray and Conduit

l.DCS, Instrument cable, FO cable, Field instrument

m.Lighting system

Electrical Engineer ( QA / QC )

Al-Harbi Trading and Contracting Company

Yanbu and Jubail Project

Kingdom of Saudi Arabia

March 2008 to December 2016

Project Contract: Royal Commission Project

Construction – Infrastructure of Haii Al-Nakheel 2 & 6 and

Al-Oyoun 2 for Primary and Secondary Roads and Utilities

GENERAL RESPONSIBILITY:

1.Prepares necessary contracts documents as per requirement of royal commission project

Project Procedure Plan

QA / QA Plan

Fire Prevention and Protection Plan

Safety Manual Plan

Security Plan

First Aid Plan

Sanitation Plan

Traffic Plan

2.Duly authorized representatives of the royal commission and responsible for engineering supervision of works.

3.Authorized to take decision on all question regarding quality and acceptability of materials furnished and work performed.

4.Responsible to verify that the required sampling and testing is accomplished according to the standard procedures and that the materials used and the work done on the project, whether produced on the project or delivered to the project from outside source, comply with the project specifications.

5.Review and Prepares technical submittals of electrical, mechanical and civil materials for approval as per specification requirement standard of royal commission project.

6.Review and Prepare Shop & As-Built drawings in auto cad version for electrical and telecom plan key layout, profile elevation, details schedule for high voltage manholes and other related electrical, mechanical & civil works.

7.Review and Prepare Bill of Quantity (BOQ) or Table P2

8.Prepares document procedures in testing plan (ITP) and Operation & Maintenance Manual (O&M) for electrical, mechanical and civil works.

9.Prepares documents for Initial Acceptance inspection (IAI) and Certificate of Initial Acceptance Inspection (COIA) in field of designated utilities.

10.Checking deliverable materials as specified quality in accordance with approved materials standard.

11. Prepares request for inspection as per site accomplishment conducted during acceptance for electrical, mechanical and civil works.

12.Organize the works with close supervision and control to ensure that the work is properly done.

13.Maintain good quality and based on the approved specification.

SCOPE OF WORK:

1.Excavation works for utilities and other structures on required elevation based on the approved plan.

2.Installation of electrical & telecom duct bank, potable & irrigation pipe, RCP for storm drainage, manhole, hand hole, chamber including pouring concrete structures & road asphalt.

3.Construction of electrical manholes and foundation of transformer, pad mounted switchgear, street pole and pillars based on the approved drawing.

4.Installation & termination of high voltage and low voltage cable inside duct banks as per required load capacity demand schedule.

5.Construction of manhole for sanitary sewer and storm drainage line.

6.Construction of potable, fire & irrigation water distribution system.

7.Safety and housekeeping works

Electrical Engineer

Sanritsu Great International Corporation

Calamba Laguna Philippines

February 2006 to Febuary 2008

GENERAL RESPONSIBILITY:

1.Responsible for conduct maintenance of facilities equipment such as generator sets ( Denyo, Mitsubishi, Caterpillar ), air conditioning units ( National, Panasonic, Daiken Allen, Carrier ), air compressor ( Kobelco ), AHU system, computers and printers.

2.To help in the implementation and maintaining environmental and safety policies and procedures.

3.Responsible for building structures, electrical and mechanical works.

SCOPE OF WORKS

1.Conduct daily routine monitoring for inspection of equipment status.

2.Supervised wiring installation, trouble shooting, repair and maintenance of electrical system.

3.Conduct Monthly preventive schedule for generators sets, air conditioning units, air compressor and electrical machines.

Electrical Engineer

Unipace Corporation

Cagayan De Oro City

May 2005 to November 2005

GENERAL RESPONSIBILITY:

1.Assist civil and mechanical engineer to design and estimate construction plan for commercials, industrials and infrastructures works.

2.Responsible for electrical computation of load consumption and installation of wiring connections.

3.In charge for electrical substation of equipment and controls such as generator sets, transformer, switchgear and control units.

SCOPE OF WORKS

1.Conduct daily inspection for status of load phasing synchronization.

2.Supervised manpower regarding electrical, mechanical & civil works.

3.Handle electrical wiring installation and motor connection.

Electrical Maintenance Engineer

Red Ribbon Food Corporation

Cagayan De Oro City

January 2003 to April 2005

GENERAL RESPONSIBILITY:

1.Maintain good quality of equipment with good quantity of production.

2.Perform actual reprocess of system in cycle of air conditioning units.

3.Supervised manpower regarding electrical, mechanical & civil works.

Cadet Electrical Engineer

National Power Corporation

Iligan City, Philippines

June 2003 to December 2003

GENERAL RESPONSIBILTY:

1.Assist civil crew during construction and installation of transmission lightweight pole.

2.Arrange daily work schedule activities and utilization of equipment at site.

3.Assist electrical superintendent to initiate power economic load dispatch through transmitting and distributing of load system.

4.Conduct troubleshooting in substation control room area.

Sale Application Engineer

Speed drill Construction Company

Cagayan De Oro City, Philippines

June 2002 to April 2003

GENERAL RESPONSIBILTY:

1.In charge of deepwel drilling, water system, well and pump servicing, pump

repair & general engineering.

2.Dealer of all kind of pumps, motor control, valves, meter and all kind of air

conditioning units.

V. TRAINING / ADDITIONAL SKILLS DEVELOPMENT:

1.Safety and Control

Conducted by: Institute of Integrated Electrical

Engineers of the Philippines

Cagayan De Oro City

2.Programmable Logic Controller ( PLC )

Conducted by: Institute of Integrated Electronics

Communication Engineers of the

Philippines

Cagayan De Oro City

3.Power Transmission and Distribution line

Conducted By: National Power Corporation

Cagayan De Oro City

VI. PERSONAL DATA:

Birth date : January 05, 1980

Age : 37 years old

Religion : Roman Catholic

Citizenship : Naturally born Filipino

Sex : Male

Status : Married

Height : 5’4”

Weight : 165 lbs

REFERENCES:

Engr. Robert Bulan Project Manager

PHESCO INC.

Engr. Arturo Garcia Project Manager

Al-Harbi Construction Company

KSA

I hereby certify that all of the above information are true and correct to the best of my knowledge.

George D. Godenez

Applicant



Contact this candidate