Resume

Sign in

Electrical Design

Location:
Sugar Land, Texas, United States
Posted:
November 27, 2017

Contact this candidate

J I M R. R H A M E

RÉSUMÉ OF QUALIFICATIONS

**** ******** **** *****

Sugar Land, Texas 77479

(281) ***-**** res.

(713) ***-**** cell.

E-mail: ac3h43@r.postjobfree.com

Job Goal

To secure a position which utilizes my experience and abilities gained as a Facilities Manager/Coordinator, Asset Integrity Coordinator, Drafting-Design Coordinator and CAD Designer/Operator.

Professional Highlights

Twenty seven years of design/drafting experience. Including:

- design supervisor

- CAD design

- plant experience (safety)

- schematics & diagrams

- electrical/instrument layouts

- civil/structural layouts

- piping layouts

- P&ID's

- location plans

- PFD’s

- loops

- QA/QC

- DCS

- installation details

- topography/mapping

- offshore platform design

- field walkdowns

- safe charts

- skid packages

- I.T. support (CAD/hardware/software)

- BOM’s

- onshore/offshore supervision

- logic diagrams

- Solidworks

Experience in MicroStation through MicroStation V8. Including:

- drawing files conversion

- cell libraries

- menu creation

- customization

Experience in PDS. Including:

- equipment modeling

- data management

- PD_Draw (annotate/compose)

- Orthogen (2D management)

- EE Raceway design

- Piping Designer

- Design Review terminal

Experience in AutoCAD through Release 2015. Including:

- installation

- script files

- DXF files

- slide presentations

- symbol libraries

- menu creation

- AutoLISP programming

- isometrics

- 3D design and modeling

Experience in Auto-Trol Series 5000. Including:

- DXF files

- menu creation

Other related computer skills:

- Windows NT 2000

- Excel

- WordPerfect

- Access

- Rebis Autoplant

- CADworx Plant

- VAX

- CADworx P&ID

- CAD/Advantage ISO

- CAD/Advantage P&ID

- All Topo Maps V7 Pro

- Windows XP

- Word

- Norton Utilities

- ProWrite

- X-Tree Gold

- Harvard Graphics

- Hardware setup

- Aegis

- Dbase

- E-mail

- Quattro Pro

- Internet

- DOS

Career Summary

4/14 – Present Stantec – Design Supervisor/Senior Designer

Duties: Documented substations for emergency response conditions. Designed database for electrical equipment assessments (per client). Coordinated design projects. Led training classes for electrical design. Held product learning seminars with various vendors. Used 3D design for client reviews to identify problems and solutions. Responsible for client interfacing for projects regarding scheduling and performance. Reviewed co-worker performance for yearly reviews. Introduced new clients to the company for new project consideration. Created schedules for project completion. Performed field walkdowns to gather information and interface with construction crews.

2/03 – 4/12 Upstream Engineering – Mechanical/Electrical/Instrumentation/Process Designer

Duties: Develop 3D model of projects and present them in meetings. Responsible for engineering drawings for offshore and onshore facilities including P&IDs, Safety Equipment Plans, Piping Layouts, Area Classification Plans and various Details. Responsible for setting up software and configuring/customizing CAD systems. Helped create standard borders with Lisp routines for proper insertion and drawing setup. Other responsibilities include traveling offshore or to onshore facilities to document “as-built” situations for new work or asset documentation.

7/02 – 1/03 Shell Exploration & Production Co. – Regional Facilities Coordinator for the Rocky Mountains

Duties: Responsible for Asset Integrity for the Shell Rocky Mountains including walking down existing and new construction sites. Field work involved traveling to Wyoming (monthly) to sketch plot plans and P&ID's. Also, responsible for creating more work for in-house engineering. Office duties included creating drawings from field notes and designing electrical hook-ups for grounding and instrument junction boxes. Had to work in coordination with engineers at both the office and the field office in Wyoming and maintain job hours and budget control. BOMs and construction drawings sent to field for installation. Managed drawings and recordable numbers. Worked up new drawing numbering system with other coordinators to be implemented for all new work.

7/01 – 7/02 Alliance Engineering – Electrical/Instrumentation Design & CAD Support

Duties: Responsible for evaluating, learning, purchasing and training of third-party CAD software. Responding to CAD problems and hardware/software setups. Setting up new user profiles and developing applications for end-users. Working with management to solve issues related to support for project/client standards.

7/99 – 7/01 Petroleum Professionals International – Drafting/Design Supervisor

Duties: Responsible for evaluating, learning, purchasing and training of third-party CAD software. Implemented plans to create and use drawings more efficiently. Created platform drawings for all disciplines including Piping, Electrical, Structural, MMS, P&ID’s, PFD’s, Safe Charts and various Details. Developed marketing aides for sales. Developed in-house modeling procedures to check design integrity. Supervised site modifications while offshore for new and existing oil rigs. Relied upon to oversee work from outside contractors. Responsible for hiring and training new employees. Arranged outside contractor to rework existing web sites and modernize the appearance and structure. Organized projects for future use and created standardized drawings for P&ID’s, schematics, plan drawings and details. Integrated logical P&ID’s using Microsoft Access to generate reports for clients and to track construction materials and BOM’s. Maintained hardware and software for other company personnel. Supervised offshore projects for clients including surveys and installations.

8/95 – 2/99 Kværner Process - CAD Coordinator/Electrical Designer

Duties: Modeled in 3D using PDS while coordinating the group effort. Developed logic diagrams and streamlined symbology input. Created and revised installation details. Generated location plans diagrams. On site during plant turn-around and start-up. Updated database and reviewed new programs for CAD group. Handled training for AutoCAD, PDS and MicroStation ’95. Coordinated CAD group while receiving input from both clients and lead engineers. Worked with I.T. to solve hardware/software problems.

7/95 - 8/95 Bechtel – Electrical/Instrumentation CAD Designer

Duties: Assigned to field design team at Phillips/Sweeny. Updated location plans by means of field walk downs. Created diagrams and schedules. Estimated drawing hours and materials.

5/95 - 7/95 Jacobs Engineering – Electrical CAD Designer

Duties: Generated various layout plans. Helped with estimating drawings hours and materials.

5/89 - 5/95 Parsons S.I.P. Inc. - CAD Coordinator/Electrical Designer

Duties: Coordinated CAD group for Shell/Parsons Partnering Projects. Designed packages involving schematics, diagrams, location plans, detail sheets, and isometrics. Authored AutoLISP programs for design/drafting use which helped reduce hours spent in drawing creation. Worked with management to solve problems in the design group. Aided software and hardware related problems. Trained new employees for AutoCAD, MicroStation and Auto-Trol. Taught AutoLISP classes. Wrote for company newsletter. Created client drafting standards, symbols, layers, etc. for CAD purposes. Researched new software. Interfaced with plant personnel.

Plant experience, turn-around and design projects:

Valero – Houston Refinery (Houston, TX) AutoCAD 2015

Created Access database for electrical equipment assessments and various design projects

Covestro (Bayer) – Baytown Facilities (Baytown, TX) MicroStation V8

Documented all substations for emergency response and various design projects

El Paso – Onshore Facilities (South Texas) AutoCAD

As-built facilities packages including P&IDs, plot plans & line lists

Shell – Rocky Mountain Asset Integrity (Pinedale, WY) AutoCAD

Asset Integrity packages (plot plans, P&IDs, area classification, safe charts, relief systems)

Calpine – Clear Lake Cogen (Bayport, TX) AutoCAD

Chiller Expansion (plant shutdown, turn-around and as-builts)

Bayer - Baytown Facilities (Baytown, TX) MicroStation ’95, PDS, PD_Draw, Orthogen

Chlor-Alkali Chemical Process (coordianted PDS group)

Alcoa - Point Comfort Facilities (Point Comfort, TX) MicroStation ’95

#4 Rod Mill Gear Replacement

Quantum - LaPorte Complex (LaPorte, TX) AutoCAD

Syngas Feedstock Conversion (plant turn-around and as-builts)

Shell - Deer Park Manufacturing Complex (Pasadena, TX) AutoCAD

SMDS Wax

Shell - Norco Manufacturing Complex (Norco, LA) MicroStation 3.3, AutoCAD, Auto-Trol S5000

DU-4/ALKY phase I and phase II

Shell - Geismar Manufacturing Complex (Geismar, LA) AutoCAD

EO/EG-3R Offsites

ISK Biosciences (Houston, TX) AutoCAD

Magnetic Iron Oxide (coordinated CAD group, AutoLISP programming/Dbase IV)

Various work performed for clients with and without field work involved include:

- ARCO/Bayport

- Witco

- Alcoa/Jamaica

- Davis Oil Company

- Shell/Deer Park

- Pemex/Mexico

- Shell/Belpre

- Texas Alkylation/Deer Park

- Akzo Nobel/Houston

- Shell/Norco

- ISK Biosciences/Houston

- Sterling Chemicals/Texas City

- Solvay/Deer Park

- Quantum/LaPorte

- Shell/Geismar

- Phillips/Sweeny

- Hoechst Celanese/Bayport

- Alcoa/Point Comfort

- Bayer/Baytown

- Calpine/Clear Lake Cogen

- Hall-Houston Oil Co.

- Palace Operating Co.

- Yuma Exploration

- Gryphon Exploration Co.

- Calpine Natural Gas Co.

- Apex Oil and Gas

- Pierce Junction

- StatOil

Education

LaPorte High School Graduated: June 4, 1988

College preparatory curriculum with emphasis on engineering/drafting/English

San Jacinto College

Basic course studies with emphasis on engineering/drafting/English

References available upon request



Contact this candidate