Post Job Free

Resume

Sign in

Manager Safety Officer

Location:
Pretoria, GP, South Africa
Posted:
November 21, 2017

Contact this candidate

Resume:

CV

Curriculum Vitae

Jacobus Willem Hendrik Scholtz

Contact Details

Postal Address: Telephone (Cell): +278******** after hours +278********

Groenfontein E-Mail: ac3fnc@r.postjobfree.com

Bronkhorstspruit

1020

Web Address FB: http://www.facebook.com/home.php#!/PURPELRAIN

Employment Education

Highest Academic Qualification: NQF level 6

Employed at Kusile Power Station as Mechanical Supervisor Company Improvair /Enviroware Joint Venture: May 2016 and Still…

Manage projects on HVAC systems. Consisting Boiler-Maker’s, Pipe Fitters and Welder’s with required assistants, as well as Material Control and Safety Officer. Planning/ Expediting. I see to it that Risk Assessments is done and all safety aspects are in place before sub contractor start on a building. Do planning with the client and priorities.

Manage the Sub Contractors with fabrication of steel pipes and to do installations on to Chillers and AHU’S.

Consist of paint for corrosion protection, Lagging and Cladding on to steel pipes.

I Also Manage the Sub Contractors to do the installation of Ducting if required.

Buildings I’m involve with and still- South coal, North Coal, Ash Dam, Lime Stone, SSS, SSE, Lab, WWTP, Hydrogen, Radio Tower, FGD, FFP, Aux Bay, CPP, ACC and Admin Building.

Contact person: Nelia

Tel: 084-***-****

Employed at Swancore as Boilermaker: Sept 2015- April 2016

Repairing all earthmoving accupment-escavator, frontloaders, ect. Opperating and repair of washplant.

Fabricate steel structure and plate work as required, ect.Do CO2, gas and ARC welding as requiered.

Contact persone:Foreman

Fernando: 083-***-****

Reason for leaving: Retrenched, have copy of retrenchment letter.

Employed as Boilermaker at Gold Plats: June 2014 2015 September

Fabricate & install pipes, tanks, etc. for Cyanide Plant.

Demolishing of old Wash Plant. Fabricate & install new Wash plant.

Consisting with screen, conveyer & Chutes, etc.

Demolish of Plant at Crown Mines - DRD consisting of Structures with pressure vessels,

tanks, motors &Boilers etc.

Fabricate & install Ball Mill consisting with screen, conveyer & Chutes etc.

Recon of press filters –repaired press structure, bearings, alignment of motor with V-belts etc.

Contact person: Manager

Pedro:Cell: 083-***-****

Reason for leaving: Work on contract bases end of contract.

Employed as boilermaker at Blazecor: Employed: 28 July 2012 – 14 May 2014

Do all maintenance at Exxaro – consist of repairing of crushers, chutes and earth moving machinery. We also fabricate steel work at our work shop for other companies as required-

Contact person:

Leon: 073-***-****

Reason for leaving: Retrenched/have reference letter

Welding course done at Protech Training-Eseta Accreditation no: ES/ETQA/ 0110

Basic Arc, Mig and Tig ---Reg No: SP/583/0026

Has successfully completed a skills program in the following unit standards:

14683 – Apply work site practices, 5 Credits

243063 – Weld carbon steel work-pieces using the shielded metal arc welding

Process in the down-hand position, 15 Credits

243066 – Weld carbon steel work pieces using the gas metal arc welding process

in the down-hand position, 8 Credits

243068 – Weld carbon steel work-pieces using the gas tungsten arc welding process

in the down-hand position, 15 Credits

2013/05 Basic Rigging &Slinging course done5 Credits

Contact person: Foreman

Leon Chamberlain: Cell 073******* or 079*******

Reason for leaving; Retrenched-have copy of letter.

Employment as a Manager at Cosira Group: From September 2008 – July 2011

Appointed as Site-Manager (Consisting Rigger’s, Boiler-Maker’s, Welder’s with required Assistant’s as well as Material Control and Safety Officer). Planning/ Expediting- Erection of Steel, Plate Work and Fitting of liner’s & Assembling of structure’s. Advise on Revisions what must be done on any type of steel work .Attend meetings with group and clients. Work directly with Clients to monitor project’s on fabrication of steel at work shop and to site. Fly to international site locations to undergo inventory and erection errors, shortage and reported to top management. QC of steel work, see to it that plate work and structural steel is fabricated according to the clients drawings and check welds for neatness presentation and clean, check for undercuts and repair if required. Then send steel for corrosion protection and see to that the correct procedure was followed with cleaning of surface for preparation to be painted or galvanized. (NCR if any problems occur)Work out cost (QC) of delays and send NCR to relevant departments. (Fabrication error, Earth moving equipment, Work force & Equipment/Electrical tools)Dispatch & Receiving of Steel work and Bought Outs.See to it that Trucks (trailers) are loaded according to regulations (Maximum legal truck loadings and dimensions)

Contact: Cosira Group HR-Vanessa Waurika Email: ac3fnc@r.postjobfree.com +27-011-***-****

Ion Bennett Cell: 082-***-****

Email:ac3fnc@r.postjobfree.com

Reason for leaving – Department became redundant-Have copy of reference letter.

Co: MDM ENG/Cosira Group: Boiler-Maker [Repair Fabrication errors, Modifications & Erection of Plant’s Required by Client’s] March 2008-September2008

Build steel structures for conveyor belt at Ezulwini Gold &Uranium Plant and do the Detailing / Erection on Gold room and Fabrication. MDM was running the project. Then I’m also involved with other projects, modifying of containers for a DMS Plant. The client is Metco Namakwa. In the containers we build everything you need to run a diamond plant. From a chutes to a conveyor etc.

Contact: Ion Bennett

Cell: 082-***-****/076-***-****

Email:ac3fnc@r.postjobfree.com

Reason for leaving – Appointed as Manager to a new division.

Cosira Group. (Web address:http://www.cosiragroup.com/news-and-media/press-office/hencon-investments/)

I always get the job done in time.

Other Training & Experience:

Briteline SA 645 cc: Boiler-Maker [Structural of Fabrication (J.C. Jacobs [011] 864-4235)] October 2007-February 2008

Extra Course’s done:

Hazmat Course

Electrification and Switching Course

Fire Fighting Course

LION Alco meter & Model SD 400PA/P and LION Alco Blow 2004

Planner

Computer skills: Oracle Primavera P6 Project Management-2007

MS Office (advanced excel, word, power point, email, internet)

Microsoft Project-2007

PBS-Behavioral Observation (July 2011)

PBS-Feedback Process Implementation (July 2011)

Incident Analysis Training (July 2011)

ARC, Mig and Tig course 2012

Basic Rigging & Slinging 2013/05

. 12. Constructionn regulations

At Spoornet, Transnet Freight Rail:1989/12/18 2007/09 Duration: 18Years

Train assistant from 1989 till 1999

Train driver from 1999 till 2007

Studied in my own time and pass Train driver exam first attempt

NQF level 5

National Diploma: Train Driving(Mainline Operations) 30 August 2000 NQF Level 5

Locomotive 6E/6E1 & 5E

Train Working Rules

Vacuum Brake System

Practical Part 4

Act. Section Manager from 2005-2007

Complete Revision & Efficiency & Refresher Course(4)

Act. Section Manager:

Part 4 Training to Train Drivers (Including Part 1, 2 & 3) 2004-2007

Work as a Section Manager (Office) from April 2005-2007

Knowledge of ITP, Rostering, Planning, Management of Train Personnel

Planning of Train Crew’s

Management IOD’s

Contact: Manager- Fanie Cell: 083-***-****/078-***-****

Email: ac3fnc@r.postjobfree.com

Locomotives:

1. 5E/5E1 NQF Level 4 24 Credits (extra)

2. 6E/6E1/16E/34GM/GE/17E -30 August 2000 NQF Level 5 24 Credits

3. 10E/10E1 & 10E2 09 June 2001 NQF Level 5 24 Credits (extra)

4. 18E Locomotive NQF Level 5 24 Credits (extra)

Extra Credits: 72

Brake Systems:

Vacuum Brake 30 August 2000 NQF Level 5 12 Credits

Air Brake 15 May 2003 NQF Level 5 12 Credits (extra)

Extra Credits: 12

Total Credits: 324

Road Knowledge: NQF Level 6 (52 Credits) Heavy Hauler Cat C

Personal Information

Surname: Scholtz

Name: Jacobus Willem Hendrik

Identity Number: 730-***-**** 088

Passport: 474058310 expire Date-28/01/2018

Date of Birth: 1973-08-14

Sex: Male

Marital Status: Married (29 March 1996) (Wife: Edeleen)

Dependants: 2 -Patricia (19), Stephan (17)

Nationality: South Africa

Home Language: Afrikaans

Bilingualism: English

Driving License: Code 08

Criminal Transgressions: None

Health: Excellent

SPECIALITY IN GENERAL

Boiler making

ARC, Mig and Tig Welding

HVAC installation

Theoretical- & Practical Training of Employees;

Management of Employees;

Safety in different environments;

Expediting

Planning and Execution

Identify detail & fabrication errors and rectify

Client Satisfaction

Quality Control-AWS(Welding requirements), Liners & Painting

Incident Analysis & Training

Transport Controller

Computer skills: MS Office /MS Project & Oracle Primavera P6 Project Management

(E-mail, internet, word, advanced excel, power point)



Contact this candidate