Post Job Free

Resume

Sign in

Microsoft Office Electrical

Location:
WB, 713325, India
Salary:
6000 Riyal
Posted:
November 21, 2017

Contact this candidate

Resume:

*

MOHAMMAD JASIM AKHTAR

Residential Address :Room No 1 Anand Gharh

Adarsh society Near Hanuman Temp, Vikroli Park Site Mumbai 400079, Maharashtra

Email : ac3fgk@r.postjobfree.com

Cell No=009**-********

CELL NO, +91-890******* / 981-***-****

ELECTRICAL & INSTRUMENTATION FOREMAN

Decisive, result focused, Engineering Professional With Experience in Electro Mechanical Service Industry, My Experience is pertaining to quantity surveying installation of various building service, such as Air- Conditioning, Electrical,instrumentation, Protection Systems Etc, And Also I am always up to Date with the technological Advances in our field, possesses interpersonal and organizational skills, excellence in teamwork, well versed with international standard, Education & Technical,

S,S,C, Passed (Delhi board Of Secondary &higher secondary open Education ) I,T,I, Passed (West Bengal S,V, Technical Institute ) Passport Details,

Passport No, L-6649869

Date of Issue, 28.10.2014

Date of Expiry, 27.10.2024

Place of Issue, Doha Qatar,

Old Passport No. F-1833509

Other Qualification,

Will conversant in Microsoft office, Application ( word, Excel, Access And Power point) Conversant with internet And Email Applications,

Employer, : Q.D.V.C (Qatar)

Designation, : Electrical Foreman

Duration, : 22.04.2012 to Till Date

Location, : Lusail City Railway Transit

Employer, : C,C,T,C, (Abu Dhabi)

Designation, : E & I Foreman

Duration, : 05.09.2010 to 15.02.2011

Location, : Bab Gas Compression

Employer, : S,A,Kentz (Saudi Arabia)

Designation, : E & I Foreman

Duration, : 22.10.2007 To 14.06.2009

Location, : Sharq 3rd expansion (jubail)

Employer, : U.T.S. Kentz (Abu Dhabi)

Designation, : E & I Foreman

Duration, : 23.11.2005 To 17.04.2007

Location, : Das Island (Rowais)

Employer, : Multi Tech Engineering

Designation, : Supervisor

Duration, : 23.06.2009 To 04.09.2010

Location, : Mumbai Port Trust

Employer, : Elematic Engg Pvt Ltd,

Designation, : Electrical char hand

Duration, : 02.08.2004 To 20.09.2005

Location, : B,P,C,L, Mumbai

JOB PROFILE & RESPONSIBILTIES:

Handling Project Activities Involving Working Various Requirements Related To Instrumentation Work & Monitoring Over All Project Operation for Ensuring Timely Completion.

Executing Site Activities Including Planning Co – Ordination with Site Engineer.

Preparation & Review Of Progress Related Documentation & Formalities.

Supervision Of Erection Installation Of Instruments Process Control Instruments & Electrical Panel Wiring System, Cable Lying And Tray & Junction Box Erection, Junction Box Support Fabrication And Installation As Per Hook Up Drawing Air Line Pipe From Sub Header To Valves Points As Per Drawings And Site Observation And Co – Ordination With Client To Solve Construction Related Issues.

Involved In Function Check Loop Checking, Glanding Termination electrical & instrument Panel Termination Etc.

Pre- Commissioning And Commissioning Activities. Calibration & Adjustments Of Instruments, Commissioning Of Instruments Panel.

Review And Certification Of Field Instrument Test Reports.

Supervision Of Erection Installation Of Instruments Process Control Instruments Panel Wiring System, Cable Lying And Tray & Junction Box Erection, Junction Box Support Fabrication And Installation As Per Hook Up Drawing Air Line Pipe From Sub Header To Valves Points As Per Drawings And Site Observation And Co – Ordination With Client To Solve Construction Related Issues.

Supervision Of Erection Installation Of Instruments Cable Tray, Conduit Types Of Cable Pulling, Dressing, Glanding, Tagging & Termination Continuity And Meggering From Field To Substation.

Involve In All Types Of System Related Commissioning Activities Like Loop Checking Testing & Commissioning Of Instrument Panel.

Involve In Arranging Work Permit And Arranging In Withdrawal Of Materials Providing To Working Points, Arranging & Planning A Day Before The Works How Very Timely And Easily Completion Of Each Job With Safe And Sound.

Supervision And Monitoring Daily Instruments Installation And Testing Activities And Verifying That It Complies With The Project Specification.

Involve In Co– coordinating With The Commissioning And Construction Department For Mechanical Completion.

Review And Certification Of Field Instrument Test Reports.

Involved In Instrument Calibration Of Transmitters Control Valve, Switches Indicators Etc.

Involved In Handling Man Power And Project Activities Working Out Various Requirements Related to Instrumentation Work And Over All Project Specification.

Involved In Responsibilities For Conducting Supervision And Abstaining Job Inspection Duties For Work Defined Here In And Efficient Recording And Reporting Of The Result As Required.

Involved In Responsibilities To See That The Assignment Job Is Timely Is Completed As Per The Project Schedule.

Involved In Erection & Installation Of Cable Tray Support Of JB Tray And Instruments.

Involved In Glanding Termination And Internal & External Termination. TECHNICAL RESPONSIBILTIES

Supervision And Surveillance Of On Site Erection & Installation Of Instruments Control Systems (DCS / PLC

& SCADA) Panel Wiring System Cable Laying Cable Dressing Impulse & Air Piping Fabrication Erection Of Tray & Framing Junction Box As Per P & ID, Hook Up Diagrams Design Specification And Specific Project Requirements .

Loop Checking And Verification / Modification Of Logic/ Inter Lock.

Calibration & Adjustments Of Instruments, Commissioning Of Instruments Panel.

Review And Certification Of Field Instrument Test Reports. DECALARATION:

I Hereby Declare All The Details Furnished Above Are The Correct To The Best Of My Knowledge And Belief.

Yours Sincerely,

(Mohammad Jasim Akhtar)



Contact this candidate