Nader Rashidi’s CV
Address: No *, Second Floors, Farmehr Building, Farzad Alley, Zabeti St., Heravi Sq, Tehran, Iran
Mobile: +98-912*******
Email:**********@*****.***
Brief Personal Details: Education: B.Sc in Chemical Engineering Date & Place of Birth: September 15 1985-Tehran
Marital Status: Married
Military Service Status: Exempt
Spoken Language: Farsi (Persian), English
Qualification: B.Sc. in Chemical Engineering-Azad
University Tehran South Branch (2003-2007)
Technical Certificates: - IELTS from BRITISH Consulate (Fluent)
- Process Simulation Software (HYSYS)
-ASPEN PLUS Software
-Welding Course from TWI
- Internal Audit of Integrated Management System
(IMS) From TUV NORD (Iran-Germany)
- Basics, Structure & Documentation of
Integrated Management Systems (IMS) From
TUV NORD
-Exchanger Design
- Opercom Methodology Course
- PMBOK Course
- Valve Inspection
- BOSIET
- HUET
Professional Experience:
Experiences in Oil & Gas industry covering full cycles of Project (FEED, Basic Engineering, Detailed Engineering, Construction, Pre-commissioning & Commissioning, Start-up and Operation). High experience in preparation, implementation and execution, with multi-discipline, of Pre- commissioning & Commissioning and Start-up activities, in accordance with COMPANY and International Specifications, with key experience in ICAPS, Operational Test Procedures (OTP) writing, Vendor Interface, and equipment and manpower planning.
Providing “Best Practice” in Pre-commissioning & Commissioning with HSE compliance. Good and effective team working with strong leadership ability. Regularly performed / stand-in as key liaison between Engineering, Construction, Commissioning, Start-Up Team and Field Operations to ensure smooth project completion and handover. Education:
2
Core Strengths:
- Knowledge of Natural Gas Processing (Phase Behavior
& Flash Calculation, Gas Hydrate, Natural Gas
Treatment, Condensate Stabilization, Gas compression, Acid Gas treating
-Knowledge of Utility Units (Compressed Air, Nitrogen Generation, Steam Generation, Cooling Water,
Desalination.
- Familiar with Project Documents i.e. Basic/Detailed Engineering Documents
-Familiar & Issuing All Commissioning Documents i.e. Leak Test, OTP, Chemical Loading & Cleaning, General Commissioning Docs, Sub-system Generation...
-Familiar with TOTAL Opercom Methodology & ICAPS
Software
-Familiar with EPC contracts in Oil & Gas Industry 2016 Up To Now POEC
- South Pars Gas field development Phase 17&18
(Offshore Platforms)
Project Involve:
-Pre-Commissioning & Commissioning & Start-up of
Offshore Platforms 17B &18B
Position:
Deputy of Hook up & Commissioning Manager
Main Responsibilities:
-Ensure that the pre-commissioning and
commissioning activities are planned well in advance and are fully integrated with the project construction schedule.
-Prepare plans for transition of the project from
project management team to the operations
organization at appropriate stage of the project.
-Prepare commissioning plan at sub-system level
-Manage and ensure that offshore commissioning is
performed in accordance with all specified
requirements
-Establishing, instruction and performance of the
commissioning group.
-Prepare schedules for the test and commissioning
activities of total scope of supply.
Job Experiences:
3
-Ensure that commissioning activities are planned, arranged and executed in such a way that the
integrity of safety and the environment is maintained throughout the process.
2014 Up To 2016 Tesco Oil & Gas Company (Part Time)
- South Pars Gas field development Phase 22&24
Project Involve:
-Pre-Commissioning & Commissioning & Start-up of
Phase 22, 24
Position:
Commissioning Coordinator
Main Responsibilities:
-Review and checking Pre-Commissioning
procedures
-To assist construction departments by defining of Priority Systems according with overall construction and pre- Commissioning & commissioning planning
And schedule, Participate in constructability
analyses in order to meet project schedule.
-Preparation of pre-commissioning, commissioning
Execution plan
-Witness Pre commissioning activities
- Follow-up of technical modifications,
Documents Update and punch closure as
required
2012 Up To 2014 Tesco Oil & Gas Company
- South Pars Gas field development Phase 15&16
Project Involve:
-Pre-Commissioning & Commissioning & Start-up of
Phase 15, 16
Position:
-Engineering Manager
Main Responsibilities:
- Establish the Overall Execution Plan,
Organization And Schedule for the Engineering
Activities in Accordance with the Project
Policies
- Supervise the Preparation of the Project Procedures to Coordinate the Engineering Activities of the
Sub-contractor
- Supervise the Engineering Sub-contractor Activities 4
- Review the Engineering Progress Status and Report to The Project Control Manager
- Responsible for the Engineering Standards and
Specifications and for Resolution of Technical
Alternatives, deviations and concessions with
Contractor
- Coordinating Activities of VENDORS and any
Subcontractor Participating in the Work
- Convene PSSER (Pre-start up Safety &
Environmental Review) Meeting with Subcontractor
- Coordinating Procurement Section for Purchasing
Commissioning Chemical & Lubricant & Spare-part
2011 Up To 2012 Tesco Oil & Gas Company
-South Pars Gas field development Offshore 16 & Phase 13 & 22, 24
Project Involve:
-Pre-Commissioning & Commissioning & Start-up of
Phase13& 22, 24 and Offshore Phase16
Position:
-Process Engineer Head
Main Responsibilities:
-Issue Pre-commissioning & Commissioning Procedures
- Defining & Issuing Pre-commissioning & Commissioning Priorities
-Preparing Systems Sub-system Identification &
Mark-up
-Preparing & Issuing Early Start-up Scenario for Gas in
-Blind List Preparation
-Supporting ICAPS Software for Data Base Creation
-Cooperation with Engineering Department to
Update Detail Design Documents
- Confirming Piping Loops for Blowing & Flushing Stages
- Coordination with Procurement Section
- Attendance in FAT (factory acceptance test)
-PFD & P&ID review
-Estimation & Calculation of Chemical Consumption
-Estimation the Amount of Required Spare Parts
2008 Up to 2011 SEPANIR Oil & Gas Company
-South Pars Gas field development Phases 15&16
Project Involve:
Engineering
Position:
-Process Engineer
5
Main Responsibilities:
- Reviewed and Developed Process Documents
-Attendance in Technical Meeting
-Preparation of Reports
-Scope of Work Preparation
July 2007 Up to Feb 2008 Nargan Engineering (Part Time)
-South Pars Gas field development Phases 15&16
Project Involve:
Engineering
Position:
-Process Engineer
Main Responsibilities:
-Engineering Design Service (Feed Package)
-Procurement services
Computer Literacy: Technical:
- Aspen Pluse, Hysys, & Familiar with ProII & HTFS General:
- Microsoft Office (Word, Excel, PowerPoint)
Interest: Studying, Research, Mountain climbing, travelling Institutional Experience: A Member of IACHE (Iranian Association Chemical Eng.)