Post Job Free
Sign in

Construction Engineer

Location:
Egypt
Posted:
November 18, 2017

Contact this candidate

Resume:

https://www.linkedin.com/profile/public-

profile-settings?trk=prof-edit-edit-

public_profile

****.****.*.*****@*****.***

Cairo,Egypt

002***********

Emad Adel

Civil Construction Engineer

Education

Civil Engineering, Bachelor’s degree

Ain Shams University (2009 – 2014)

Structural engineering department, Steel structures graduation project. PMP Preparation course

35 PDUs / 35 contact hours by a PMI Registered Education Provider #4082 . Udemy ( https://www.udemy.com/courses/)

EXPERIENCE

Construction Engineer (February 2016 to present)

Orascom Construction Industries

Projects I Participated In :

1. Port said tunnels under Suez canal project: To link the western city of Port Said to the new industrial areas being developed in the east. The project consists of the execution of :

-twin-tube road tunnel (13.4 m Diameter,3.8 km length tunnels with a further 800 m of cut and cover tunnel) Areas of expertise with direct responsibilities:

1.Execution of four peanut type launching and receiving shafts: Four shafts with bracing Beams, counterfort columns and raft slabs. 2.Execution of 387 m cut and cover tunnel and open cut structure : Longitudinal D- walls, cross walls, struts and capping beams. 3. Execution of ground improvement works at the TBM starting zone

-Soil substitution block with 25% leg panels to the sand layer -Transition zone to ensure TBM stiffness jump. 4.Execution of cross passage

-Two Soil substitution blocks of plastic concrete as safe havens for both tunnels [68m] depth, Ground freezing works to construct cross passage between the two tunnels.

5. Execution of soil improvement works by micro piles : Execution of reinforced micro piles with 47 m depth, initial, final grouting to reach 30 ton working load per each pile. 6. Execution of piezometers and inclinometers:

A set of various depths piezometers and inclinometers to acquire the G.W.T level to ensure an early alarm of soil disturbance.

7. Gas Venting Along TBM Routes to reduce risks of TBM operations. Vents 25 m apart as a mesh along routes of the tunnels to release the pockets of combustible and poisonous gases. 8.Slurry treatment plant [TBM] :

Two plants for desanding slurry from a shield machine stabilized by pressurized slurry. 9.TBM grouting units :

Two grout plants for grouting between soil and the lining segments. 10.Precast lining segment production:

Rebar assembly, casting, curing, storage and transportation chain. 11.Dewatering by deep wells :

A set of 68 m depth wells is running constantly and connected to main pipe line to the Suez canal directly, to maintain the G.W.T before open excavation processes. https://www.linkedin.com/profile/public-

profile-settings?trk=prof-edit-edit-

public_profile

Structural Engineer (September 2014 to February 2016) PERI (http://www.peri.com/en/index.cfm)

•Performing static analyses of constructions methods and temporary Structures for various concrete structures, to ensure optimal design.

•Preparation of material lists and quotations.

• Preparing the Construction Methods Rotations.

Projects I Participated In :

1. Nile river barrage Assuit:

2. X-ray facility building in ABU SAMRA QATAR :

3. sidi abdel rahman resort community:

4.Police Academy Main Building

5.Almaza city center

Intern Site Engineer

(July 2012 to September 2012)

VINCI, Bouygues Construction

Projects I Participated In :

1. Cairo Metro Project Line 3 Phase 2:

Construction of 7.2 km section of tunnel and four underground stations., Areas of expertise:

- Participation in Checking all the drawings and method of construction.

- Ensuring projects run smoothly and structures are completed on time.

- Make sure that the site follows the safety procedures

- Participation in Job safety analysis for critical activities to avoid any risk.

-Foundation works (D-walls).

-Precast walls and stairs installation.

-Form works, Steel reinforcement, Concrete casting for (Columns, Slabs and Stairs).

-Prepare reports that describe the daily works in the site. HR Recruiting member

Arabesque (august 2013 to august 2014)

a student activity aims at helping students to increase their awareness, discover their talents Projects I Participated In :

1. Arabesque orchestra

2. Arabesque league

Intern Structural Engineer

Premises design (May 2011 to May 2012)

-Preparing Construction Drawings, and site supervision of a private villa in 6october city Intern Site Engineer

The Arab Contractors (July 2010 to September 2010) Projects I Participated In :

1. Panorama Residential buildings

9 Residential Building including 572 housing Apartments ranging from 120: 220 square meters at a cost of 255 million Egp. REVIT instructor

Freelance (JULY 2014 to Present)

I was responsible for responsible for train a new users of Revit to use it professionally Projects I Participated In :

1.EL-Hashimy Consulting Engineering Office

2. Arabian International Company



Contact this candidate