Post Job Free

Resume

Sign in

Engineer Design

Location:
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
Posted:
November 16, 2017

Contact this candidate

Resume:

CHANDRASEKARAN.D

Mobile: +**-**-**-**-**-**

E-Mail: ac3cpi@r.postjobfree.com; ac3cpi@r.postjobfree.com

Seeking senior level assignments in the field of Research &Development/ New Product Development with an organization of high repute

Professional Snapshot

•A competent and result oriented professional with over a decade experience in New Product Development, Research & Development.

•Currently Working in Altran Technologies pvt ltd. (formerly known as Vignani Technologies), Bangalore, India.

•Expertise in handling plastics, sheeting metal and metal casting and Well versed with CAD Tools & PDM/PLM Systems.

•Proven track-records in R&D, reverse-engineering and creating manufacturing prototypes.

•Hands-on experience in conversant with design & development process, engineering systems

Career Forte

ALTRAN Technologies, Coimbatore Advanced Engineer Since Jun’14

OTIS Elevator Company, Bangalore Sr.Executive (R&D) Nov’12 to May’14

HCL Technologies, Bangalore Lead Engineer Jul’06 to Nov’12

Atlantis Lab Private Ltd., Chennai Design Engineer Feb’04 to Jun’06

Keys and Responsibilities:

Altran Technologies:

•Working with FTB team to solve failures and Design improvements as per Customer standards (Using Solidworks-2016).

•Reducing number of assembly parts and providing cost effective solutions (DFA) using BOOTHROYD tool.

•Handling all EPDM for solid works admin activities to help customer easy launching new Server for new Location.

Client : BRUKER

Project : Design improvements for Special requirements and Failure handling

Duration : Till Date

Software : Solidworks-2015

OTIS (part of UTC Group):

•CAD-Administrator for OTIS India R&D (Handling Pro/E, Autocad & Windchill issues in Engineering & Cross functional teams)

•Creating MTL (Master technical Layouts) for new contracts.

•Taken Ownership of field installation tools & development activities (Belt Unwinding tool, T-Gauge & Tools Box new design)

•Field installation manual updates for new changes (G2Comfort, G2Nova &G2 Infinity Products)

•Created cost effective PRS (position Reference switch) concepts & development of all elevators and solved all FTB’s (simple magnet fixer plate design, New cam length calculation & involved with new PRS Switch changes activities)

•Created new enclosure design with fan to solve the Machine over heating issue for Gen2 Infinity.

•Trying to make limited Standard fasteners to use for field installation & reducing number of variables.

•Creation of Top level assembly (for Gen2 products).

•Knowledge about ACE Tools (RRCA, 5S, 3P, VSM, Mistake proof, etc..)

HCL Technologies:

Onsite Experience:

Onsite Coordinator from Jan 2011 – Dec 2011 for ITT GoldsPump project at California, USA.

Responsibilities:

•Supporting the day to day activities of the client apart from understanding the requirements and conveying the same to the off-shore team.

•Design and development of vertical pumps (CAD-Support)

•Developed programming control drawings.

•Issues and suggestions had to be conveyed to the off-shore team by means of power point presentations and tele-conferences.

•Tracking issues and design changes to closure through Team Track(change tracking application)

Projects Worked on:

Client : Augmentix

Project : Design and Development of DELL Rugged Laptops

Duration : June’2006 to Nov2009

Software : Pro/E Wildfire3.0 & Pro/Intralink 3.3, Autocad.

Responsibilities:

•Concept creation and design Development for Rugged Laptops DELL 630 XTG (A+NB, Cayenne,& El-Camino)

•Taken ownership of Palm rest assembly, Developed concepts & Build prototypes model to demonstrate the full functionality.

•Tolerances stack up analysis by using crystal ball Tool.

•Creating documents of BOM, DFMEA for entire product.

•Creating the components as per the Augmentix standards

•Interacting with clients and Project Coordination.

Projects undertaken in Atlantis lab Pvt Ltd:

Client : Atlas Copco Drilling solutions

Project : Design and Development of mining machines

Duration : 10 months

Software : Pro/E Wildfire 2.0 & Pro/Intralink 3.3,Autocad.

Responsibilities:

•Planning, Scheduling, Coordinating, Decision making and Motivating are the key responsibilities.

•Designing, Modeling, Assembly and new drawing creation of various components like Mounting brackets, Enclosures and Power pack base etc., for various Rotary drills like DML, DMM, PV-271, PV-275 etc..

•Guiding the entire team in Concept designs of various components and Hose routings for Light installation, Centromatic lube system by using Pro/Cabling.

•Conversant in handling Mfg Pro, ECN, ECR and PMS (Project Management system)

Client : GE – IBC

Project : Modeling, assembling and detailing of Electrical components.

Duration : 8 months

Software : Pro/Engineer 2001, PLM and PDM tools, Autocad.

Responsibilities:

•Product-development of Auxiliary-switch mechanism for circuit Breakers involving sheet metal and plastic components.

•Creating prototype-drawings for Aux-switch mechanism with GD&T.

•Creating the components as per the Burlington (GE’s Div.) standards.

•Changing the design of the components (or) Assemblies as per DCN written by product owner.

•Assigning all parameters and material to the model and revision is controlled by PDM (Pro/Intralink).

•Creating drawings for all Components and Assemblies.

Client : Tata Technologies ltd

Project : Modeling, assembly and detailing of Automobile Components.

Duration : 5 months

Software : CATIA, Solidworks, Autocad.

Responsibilities:

•Wheel assemblies, Hand break arrangement, Gearbox casing, Bellow for gear shifter & engine components.

•Making design changes in model as per requirements and submitting for approval.

•Detailing of parts & assemblies with required tolerances.

•QC checking for Parts and Assemblies.

•Large assembly Management, Design refinements and standardization of automobile components with reference from old drawings.

Academic Credentials

2002 B.E (Mechanical) from Madurai Kamaraj University, Bharath Niketan Engineering College, Theni

1998 Diploma (Mechanical) from Ratnavel subramaniam Polytechnic, Dindigul

1994 10th from Nadar Saraswathi Higher secondary school, Theni

IT Credentials

•Well versed with Creo-2.0, Solid works, CATIA and AutoCAD.

•PDM/PLM Tools: Windchill &EPDM

•AWARDS: Won Three-SPOT AWARDS from HCL-TECHNOLOGIES,

•I-Appreciate award from Otis for new Belt Unwinding Tool Design & development.

Personal Snippets

Date of Birth: 15th May 1979

Address: Block B-01-02, Palm court condominium,

Jalan berhala, Off Jalan tun sambathan,

50470 Kualalumpur, Malaysia.

Languages Known: English, Tamil, Malay and Telugu



Contact this candidate