Post Job Free

Resume

Sign in

Crane Operator Power Plant

Location:
Marikina, NCR, Philippines
Posted:
November 14, 2017

Contact this candidate

Resume:

REYNALDO B. PALACIOS

Lot * Blk * Hornet St. Greenbrier Village

Guinayang, San Mateo, Rizal, Philippines 1850

Mobile #: +639*********

Tel. #: 02-275-8568

Position desired: CRANE OPERATOR

Work Experiences:

I. Company: EEI CORPORATION

Address: 12 Manggahan st., Bagumbayan, Quezon City

Position: Crane Operator

Date: March 6, 2017 – Present

Project:

New Bohol International Airport Project

Panglao, Bohol, Philippines

Duties and Responsibilities:

Responsible for lifting, loading, and unloading bags of cement, rebars, and rough concrete pipes (R.C. pipes).

Responsible for erecting structural materials such as columns, girders, trashes, and purlins.

Responsible for lifting and erecting formworks, rebars, and concrete pouring for building the Control Tower, PTB Building, and Power Supply Building.

Responsible for erecting toner bags of fly ash and cement to refill silos of batching plant.

II. Company: NBC – National Building Company

Address: P.O. Box 30196, Al Khobar 31952, Kingdom of Saudi Arabia

Position: Crane Operator

Date: October 28, 2014 – November 23, 2016

1st Assignment:

NBC Workshop

Duties and Responsibilities:

Responsible for lifting pipes and inhibitor rack.

Responsible for lifting container van and I-beam.

2nd Assignment:

Aramco Replacement Admin Building

Subcontractor: Arnaout Contracting Establishment (ARCON Est.)

Duties and Responsibilities:

Responsible for lifting rebar, Concrete Pouring thru Bucket, and Concrete Foundation.

Responsible for lifting, erecting, and aligning precast wall panel.

3rd Assignment:

Aramco Gas oil Separation Plant (GOSP-1, GOSP-2, GOSP-3, and GOSP-4)

Subcontractor: Br. C.A.T. International Co. Ltd.

Duties and Responsibilities:

Responsible for lifting dragging anchor and foundation.

Responsible for the stringing of pipes from wellhead into the tie-in area.

Responsible for installing the gate of wellhead.

Responsible for lifting and erecting hot-tapping machine for hot-tapping purposes.

Responsible for lifting coupling machine which will be used for coupling pipes.

Responsible for lifting foundation which will be used to support the gate of the wellhead.

Responsible for lifting compressor, wielding machine, and some other materials which will be used for Hydrotesting.

III. Company: MICROVAN INC.

Address: 10-34 Couseway road Subic Fort Zone

Position: Rigger

Date: October 13, 2012 – July 31, 2014

Projects:

1.HI-CAT Metal Trading Company

Navotas Fish Port, Pier 4

May 19, 2014 – July 31, 2014

Duties and Responsibilities:

Responsible for lifting up metal parts and accessories from a ship that shrunk.

Responsible for the safely retrieval of the parts of a shrunk ship.

2.Masbate Gold Project

Jan. 19, 2014 – May 9, 2014

Duties and Responsibilities:

Responsible for lifting container van from barge to trailer.

Responsible for loading, unloading, and lifting load of cyanide, hydrogen peroxide of steel ball.

3.Thermal Coal Power Plant

Davao Power Plant

Jan. 3, 2013 – Jan. 9, 2014

Duties and Responsibilities:

Responsible for lifting and installing circulating water pipe (CWPIPE).

Responsible for the pile driving of sheet pile using vibro machine and power

pack.

Responsible for lifting PHC pile.

Responsible for erecting structural I-beam for assembled pipe rack.

4.Bataan Petron RMP2 (Gas Plant)

Limay, Bataan, Philippines

October 2012 – December 2012

Duties and Responsibilities:

Responsible for lifting and erecting heavy load vessels.

Responsible for lifting PHC pile and assisting Pile driving.

Responsible for lifting structural beams.

IV. Company: EEI CORPORATION

Address: 12 Manggahan st., Bagumbayan, Quezon City

Position: Rigger

Date: October 12, 2011 – October 12, 2012

Project:

JG SUMMIT Naptha Cracker (Petrochemical Plant Project)

Barangay Simlong, Batangas City, Philippines

Duties and Responsibilities:

Responsible for applying Tandemn-lift to the erected heavy vessels.

Responsible for lifting the assembled structural beam to serve as a support or foundation for the pipes that are needed to be erected.

Responsible for lifting or erecting pipes, vessels, valves, boiler, condenser, furnace, and heater.

Responsible for lifting different types of pipes to the pipe rack.

V. Company: JOHN HOLLAND PTY. LTD.

Address: The Emporium, 100 Ann Street Fortitude Valley Queensland 4006 Australia

Position: Erection base Rigger

Date: August 29, 2008 – December 6, 2008

Duties and Responsibilities:

Lay-out and pre-assembled angular bars using bolts, nuts and plates and determine the correct angular bars using the number codes.

Responsible in applying appropriate hand signals in manning the crane.

Erect concrete or steel poles using two cranes, slings, shackles, and bolts for applying Tandemn-lift Technique.

Responsible on assembling angular bars section by section, such as leg, extension leg, common body, superstructure, and earth peak.

Make sure that the bolts and nuts of each angular bars are properly tightened to the assembled tower.

VI. Company: DOTC – Metro Rail Transit (MRT 3)

Address: MRT III Depot, North Avenue Corner EDSA, North Triangle Area, Quezon City

Position: Train Driver

Date: November 1999 – August 2008

Duties and Responsibilities:

Operates the assigned revenue train as per timetable and instruction, strictly observing.

Conducts train preparation in accordance with approved procedures.

Reports to control center all abnormalities observed on the train and/or along the revenue line.

Performs the applicable intervention procedure during the train breakdown and when required, prepares and conduct train hauling according to approved procedure.

Complies with all orders, instructions and/or advice emanating from control center during revenue operation.

Prepares written reports on all abnormalities observed on th trains and along the line including the detailed actions done.

Announces safety reminders, station names, and other appropriate instruction to passenger aboard the train.

VII. Company: MEJABS Services Inc. (MERALCO Contractor)

Address: Room V 101, Vesco Bldg., Paseo De Escudero St. San Pablo City, Laguna, Philippines

Position: Operations Supervisor

Date: December 7, 1997 – August 9, 1999

Duties and Responsibilities:

Monitor the performance of the personnel.

Distribute the statement of account and D.N to the messenger route by route for delivery.

Ensure that customer s complaint was resolved immediately.

VIII. Company: Manila Electric Company (MERALCO) – Alabang Branch

Address: Ortigas Ave., Pasig, Metro Manila

Position: COLLECTOR

Date: April 4, 1994 – March 4, 1995

Duties and Responsibilities:

Collect Payments from clients of MERALCO and remit the same to the office.

Checking all documents according to sequence

Disconnect the power service of costumers as per instruction of my superior when unpaid bills cannot be settled by the customers on time.

SEMINARS / TRAINING ATTENDED:

Saudi Aramco Certification for TADANO TR 500EX, 300EX, 250EX

Certificate No: DH-B 06751

Expiration Date: March 2, 2018

Saudi Gov’t Driving License

License No: 237-***-****

Expiration Date: October 16, 2019

Certification Test for RT Mobile Crane – 70 Ton

Certification No: Test-ID-2015-016

Testing Equipment Specialist Team Co. (TEST)

January 18, 2015

Competency and Trade Test for Rigging NC I

Association of Carriers & Equipment Lessors, Inc.

September 8, 2013

CRANE AND RIGGING SAFETY

EEI Corporation

JG Summit Naptha Cracker Plant Project

October 5, 2011

Public Safety ( Firefighting and Emergency Operation )

Rescue Operation (Tower Rescue)

Vertical Horizonz Australia

October 27, 2008

PERFORM INTERMEDIATE RIGGING WORK

Foreward Skills Training

Training Accreditation Council

Western Australia

June 30, 2008

PERFORM BASIC RIGGING

Electricity Supply Industry – Generation Sector

Foreward Skills Training

Training Accreditation Council

Western Australia

June 21, 2008

PERFORM DOGGING

Nigel’ Service Centre

Training Accreditation Council

Western Australia

June 18, 2008

TEAMBUILDING WORKSHOP

Administrative Division, Metrostar Express

September 12, 2004

VEHICLE DRIVING DURING DYNAMIC TEST AND TRAINING

Sumitomo Corporation

EDSA MRT Project

November 11, 1999

SYSTRA Training Courses

oTotal System Operation and Orientation Course

oRolling Stock Operating Procedures Training Modules

oRules and Regulations Training Modules

oTrain Operation Training Module

Training Duration: September 2, 1999 – November 3, 1999

Educational Background:

Short Course: Nova Computer Institute

MS Excel and MS Word 1997

High School: E.T. Tirona High School

Kawit, Cavite

1992

Elementary: HABAY Elementary School

Kawit, Cavite

1982

PERSONAL DATA:

Birth Place: Bo. Rizal, Capalongga, Camarines Sur

Birth Date: January 2, 1969

Civil Status: Married

Age: 48 years old

Religion: Catholic

Weight: 165 lbs.

Height: 5’6’

Language: Tagalog and English

I HEREBY CERTIFY that the above information are true and correct to the best of my knowledge.

REYNALDO B. PALACIOS

Applicant



Contact this candidate