Post Job Free

Resume

Sign in

Project Manager

Location:
Houston, TX
Posted:
January 31, 2018

Contact this candidate

Resume:

BETTESUE WENIGER

ac391x@r.postjobfree.com

HOUSTON, TX CELL: 407-***-****

A project controls professional with proven expertise in driving revenues, developing complex integrated master schedules and maximizing profits in a variety of industries. A communicator sought after for the ability to manage relationships and effectively bridge the communications gap between customers and technical leads.

Project Management & Scheduling:

Primavera P6, MS Project, Project Controls, Document Control, MS Office Suite, SharePoint, SAP, Project Scheduling, Planning, Integrated Mast Schedule (IMS), Project Coordination, Procurement, Cost Control, Earned Value Management, Risk Analysis, Logistics, Safety Enhancements, Supervisory.

Career Highlights

CDM CONSTRUCTORS July 2017-January 2018

11490 Westheimer Rd., Suite 700, Houston, Texas 77077

Project Controls Specialist

Provide support in creating and updating Design Build construction schedule on the joint venture North East Water Purification Plant Expansion project.

TSG INDUSTRIES July 2016-Dec 2016

2626 South Loop West, Ste. 630 Houston, Texas 77054

Sr. Project Scheduler

Detailed analysis of the Design Builders’ EPC schedules from concept to final construction on a design-build Water Purification Treatment Plant expansion in NE Houston.

Created a change management and progress management systems for ongoing project.

DOCKWISE USA/BOSKALIS OFF SHORE June 2012-Feb 2016

16340 Park Ten Pl. Ste. 200 Houston TX 77084 713-***-****

Project Planner

Develop CPM schedules utilizing Primavera P6 for Stampede TLP 11MM transportation project. Working directly with Hess and their subcontractors to incorporate all changes. Generate monthly EV and S-curve exporting to project team.

Leading schedule for $300MM Wheatstone L&M project. Working in conjunction with Operations, subcontractors, and Bechtel to develop and review vessel schedules for potential clashes at either load-out or load-in sites. Generated weekly look ahead for project team.

Generate monthly reports, Key Performance Indicator (KPI’s), and earned value for review. Incorporated all contract and change orders issued to assure all targets were met.

Conducted quantitative risk analysis utilizing Pert Master software on assigned projects.

S&W ENERGY SOLUTIONS (CONTRACTOR) May 2010 – Jan 2013

1849 Kingwood Dr. Ste 103 Kingwood TX 77339 281-***-****

Project Controls Consultant

Client representative reviewing MS Project schedule for engineering, construction and commissioning of two barge mounted GE 7FA Turbines in Tacoa, Venezuela.

Tracked and distributed all documentation and drawings to assure that the contract requirements were met. Reviewed final documentation for auditing purposes and developed interactive CD for site use.

Create and update construction schedule on 200MM project to install a 4-turbine plant in Takoradi, Ghana. Worked with field team on execution of schedule providing weekly look ahead and updates to field personnel and management.

AKER SOLUTIONS (CONTRACT) Dec 2009 – Feb 2010

Production Control Planner/Scheduler (Short Term Assignment)

Prepare and monitor internal fabrications schedules utilizing P3 for derrick rig on multiple projects.

Updated IMS templates to provide enhanced usage for upper management, including level I, II, and III schedules.

MUSTANG ENGINEERING LP, Houston, TX. Dec 2008 – Sep 2009

PALMETTO MANAGEMENT & ENGINEERING (a Mustang Co) Aug 2007 – Dec 2008

CARLTECH, Houston, TX (CONTRACT) Feb 2007 – Aug 2007

17325 Park Row Houston 77084 281-***-****

Sr. Project Controls Coordinator

Responsibilities:

Developed budgets, create uniform reporting and forecasting, and provided monthly earned value and progress on all Invista development projects. Attending monthly client meetings to review current budget issues and scheduling impacts.

Developed change management process for EPC projects at Invista’s petrochemical plants.

Prepare EPC and turnaround schedules for projects at La Porte and Victoria plants.

Created and maintained schedule and budget for CO2 recapture plant FEED project.

SUPERIOR TECHNICAL RESOURCES (CONTRACT) Aug 2006-Oct 2006

Orlando, FL

Project Scheduler Walt Disney World, Buena Vista Construction Company

Responsibilities:

Facilitated weekly stakeholders’ meetings with project team and clients to review all ongoing projects.

Prepared project schedules for all phases of construction projects utilizing Primavera (P5).

Ensured local and contract resources are available to support project.

RITA TECHNOLOGY (CONTRACT) Jan 2006 – July 2006

Project Analyst Marriott Vacation Club International

Responsibilities:

Developed and maintained IR/IT project budgets in excess of $1.5M. Working in conjunction with procurement, IT teams and site teams to incorporate all costs and change orders.

Generate weekly and monthly reports against defined matrix to stakeholders and project managers.

Organized and facilitated stakeholders’ meetings as defined by project.

Prepared project schedules for all phases of project utilizing MS Project.

Ensured local and contract resources are available to support project.

WALT DISNEY WORLD RESORT. Nov 2000-Nov 2005

PO Box 10000, Lake Buena Vista FL 32830

Project Scheduler Technician Senior

Walt Disney World, Design and Engineering Organization

Responsible for Project Management/Coordination to include:

Prepare detail project proposal for stakeholders, outlining deliverables provided by Engineering Department.

Develop project budgets incorporating all weekly charges and changes. Generate weekly and monthly budget reports.

Provide support through all phases of project (to include scheduling, planning, budget, coordination, and procurement).

Create project schedules utilizing MS Project and/or Primavera software.

Prepare RFP and issue to vendors and contractors. Reviewed all responses and provide recommendations to PM.

Project manager for the Ride Access Control Project. Developed and revised ADA compliance checklist for resorts, parks, and attractions.

Review and document safety enhancements installed at attractions and resorts.

Education:

Bachelor of Business Administration Baker College, Michigan

Associates of Art Lake Superior State University, Michigan



Contact this candidate