Post Job Free
Sign in

Mechanical Engineer Power Plant

Location:
DL, India
Salary:
25000
Posted:
January 28, 2018

Contact this candidate

Resume:

AnkushKumarJaswal

S/O:-PawanKumarJaswal

***Freehold,

SanjayNagar,Ghaziabad-201002,

MobileNo.-+917*********

Email:-***************@*****.***

Objective

ByAcquiringKnowledge,ExpertiseandaFamiliaritywiththeOrganization’sCulture,IWantTo ContributeTowardsRealizingOrganization’sVisionandBecomeItsIntegralPart. ProfessionalQualification

B.TechinMechanicalEngineeringfrom UttarPradeshTechnicalUniversity(UPTU)with74.38% intheyear2014

AcademicQualification

HSCfrom Ram KishanInstitute(CBSE)with79.80% intheyear2008 SSCfrom KendriyaVidhalaya(CBSE)with73.20% intheyear2010 ComputerKnowledge

Auto–Cad2010

MS-Office2016

Internet

JobProfile

HavingExperienceinOperationandMaintenanceofAshHandlingPlantinThermalPower Station.

Inspection,Planning&ExecutionofMaintenanceactivitiesofvariousstationaryandrotating equipments.

CoordinationbetweenMaintenanceandOperationteam

HaveExperienceofmanagingshiftandManPower.

Maintenanceofequipments,monitoring,troubleshooting&repairingofequipments. Capableofplanningallminorandmajorshutdownjobs.

Carryingoutpreventive,predictiveandbreakdownmaintenance. Highlights

KnowledgeinDry/Wetflyashhandlingsystem e.g.Silo,Slurrydisposalsystem,Collecting Tank,Airwasher.

Knowledgeinbottom ashhandlingsystem e.g.Gatehousing,Clinkergrinderrollerassembly, Hydro-ejectorassembly,AirWaterConvertortank.

MaintenanceofGearbox,fluidcoupling,ESP/ECO/APHhoppersmaterialhandlingvalves Overhaulingofvariouspumpse.g.Ashwaterpump(VerticalTurbinepump),Centrifugalpump, Vacuum pumps,FluidizingAirBlowerPump

Rootcauseanalysis,documentation&maintainingEquipmenthistoryandprotocols. ProjectCompleted

InstallationofWarmanAshslurrypumpalongwithMotor105KW. InstallationofHighpressurepumpalongwithmotor6.6KV. ReplacementofBottom ashhoppergatehousing,hydro-ejectorassembly. Erectionof8”CastIron&10”CastBasaltPipelinesrelatedtoESP,Bottom AshHopperand Slurrydischargeline.

InstallationofrotaryfeederandDustextractionsystem ofSilo. ReplacementofSiloDumpgateandSilobagfiltersandsilobagfilterscage. ProfessionalExperience

Experienceof3year6monthsasOperationandMaintenanceEngineerinAshHandlingPlant ofThermalPowerStation.

Site:-WanakboriThermalPowerStation(GujaratStateElectricityCorporationLimited)Gujarat. TotalUnit-7Unit(7*210MW=1470MW)PowerGeneration.

CurrentlyworkingasMechanicalEngineerin“DESEINPRIVATELIMITED” Training

1.)Organization :NorthernRailway.

Duration :1.5Month

Title :CoachCareCenter,NewDelhi(Maintenance).

:WashingLine,SickLineandPlatformonDuty.

2.)Organization :BhushanSteelLimited.

Duration :1.5Month

Title :MechanicalDepartment(Production).

:PicklingLine,HRSlitter,RollingLine,AnnealingProcess,Galvanizing Line,UtilityProcess.

PersonalDetails

DateofBirth :27thAugust,1992

Nationality :Indian

Hobbies :News,Cricket,Music.

MaritalStatus :Married

Ipresentmyselfforthetrueandsincerehardworkinyouresteemedorganization&promise youthatIshallabidebytherulesandproceduresoftheorganization. Date:

(AnkushKumarJaswal)



Contact this candidate