NAME : ERNESTO D. CANAY, JR.
NATIONALITY : Filipino
POSITION : Mechanical Engineer
ADDRESS : Lot 7 BLK. 11 Ruby St. Meyland Village Lawa Meycauayan, Bulacan
P H I L I P P I N E S
EDUCATION : B. S. Mechanical Engineering
LANGUAGE PROFICIENCY : English, Tagalog
JOB OBJECTIVES : To join a company where my skills and aggregate experience will be utilized
to the fullest, leading to a greater contribution to the profit and growth of the
the company.
EMPLOYER : TEMPWELL CO.
Lot 1, Buckner St. Jade Heights,
Victoria Homes Tunasan, Muntilupa City, MM
Philippines
CLIENT : Transaire Development Holdings Corporation/San Miguel Corporation
PROJECT TITLE : Caticlan Airport Development Project Passenger Terminal Building
Caticlan, Nabas Aklan
POSITION HELD : Project Engineer/QC Engineer Aug. 7, 2017 to Present
DESCRIPTION OF DUTIES :
- Designing of Mechanical Systems, and Equipment for industrial facilities with respect to requirements and scope on small to large projects
- Preparing, scheduling, coordinating and monitoring the assigned engineering projects.
- Monitors work in progress and prepares weekly report of the status of each assignment.
- Coordinates with all projects related personnel on day-today progress of work activities, procurement and operations to ensure timely completion of the project.
- Make site visits to facilities and construction sites as required for client meetings, site measurements, and inspections
- Preparing Method of Statement and procedures for Mechanical work activities.
- Monitor and ensure that all Mechanical site activities are conducted in accordance with approved shop drawing, specification and installation procedure and material storage procedure is properly implemented.
- Perform material receiving for mechanical inspection prior to installation.
- An understanding of effective mechanical inspection processes, technical submittals
and drawing review.
- Review and check shop drawings prior for site implementation.
EMPLOYER : APTC Contracting Co. LTD.
P.O. Box 4802 Dammam 31412
Kingdom of Saudi Arabia
CLIENT : ROYAL COMMISSIONING
PROJECT TITLE : Auditorium and Training Center
JIC – Jubail
POSITION HELD : Site Mechanical Engineer Nov. 27, 2015 to Nov. 26, 2016
DESCRIPTION OF DUTIES :
- Ensures that all installed materials are in compliance with Royal Commission standards and contract drawings and documents.
- Ensures that the mechanical drawings are in line and coordinated with other discipline design drawings of the project prior proceeding with work and to highlight any discrepancies for necessary corrections.
- Review and check shop drawings prior for site implementation.
- Monitor and supervise the installation of HVAC Equipments, refrigerant piping systems and other required accessories to complete the systems.
- Monitor and supervise the fabrication, installation of ductworks systems, air devices, control device, insulation, hangers, and supports and other required accessories.
- Coordinate to Civil and Electrical and other discipline for the opening wall of Ducting and Piping.
- Monitor and ensure that all HVAC site activities are conducted in accordance with approved shop drawing, specification and installation procedure and material storage procedure is properly implemented.
- Inspection on ducting, lining, insulation of the air conditioning lines/system.
- Estimate and Review quantity take – off.
- Verify and check inspection request prior for QC inspection.
EMPLOYER : DAEWOO E&C Co., LTD
Al-Khobar Branch:
#1234, Hail Center, Al-Khobar, K.S.A.
CLIENT : SADARA (Saudi Aramco & DOW Chemical Co.)
PROJECT TITLE : SADARA Tank Farm (Jubail K.S.A.)
POSITION HELD : Site Mechanical Engineer Jul. 09, 2013 to Jul. 25, 2014
DESCRIPTION OF DUTIES :
- Verifies that materials, manufactured goods, machinery, equipment, etc supplied to the job site are in line with projects specification and granted approvals.
- Ensures that the mechanical drawings are in line and coordinated with other discipline design drawings of the project prior proceeding with work and to highlight to the project manager of any discrepancies for necessary corrections.
- Inspects site for mechanical work/installations and ensures that the carried out works are in compliance with contract drawings and documents. Advises the Project Manager on the progress any monitored discrepancies.
- Conducts site visits to advise Project Managers of any field issues and attends any co-ordination meetings required.
- An understanding of effective mechanical inspection processes, technical submittals and drawing review.
- Observes and witnesses all buried services and gives approval prior to concreting/filling.
- Arranges for samples of workmanship and establishes minimum acceptable standards.
- Assist and provides necessary data/information required by the project manager for the preparation of reports (includes labor and supervision, plant and equipment, status, site progress, amendments, delays, etc.) for submission to Client.
- Advises Project Manager on progress of mechanical work and suggests actions.
EMPLOYER : SKY ORYX JV (TAISEI-TAV Joint Venture)
New Doha International Airport Project - CP18
PO Box No. 55873 Doha Qatar
CLIENT : NDIA
PROJECT TITLE : New Doha International Airport Project - CP18
POSITION HELD : MEP Site Mechanical Engineer Feb. 29, 2012 to De30, 2012
DESCRIPTION OF DUTIES :
- Oversee and manage mechanical, electrical and plumbing works involving the
Design construction, maintenance, inspection, testing, certification and repair.
- Provide technical support on issues related to MEP building operations to the
Supervisor’s in other department.
- Implement shop drawing in the Mechanical and Plumbing System, Heating, Ventilating
and Air Conditioning (HVAC) System, Fire Protection System.
-Witness and inspect the preparation and rectification for Integration test of Fire Smoke
Damper and associated jobs such as: Issuing the list of FSD and drawings to the
Sub-con as well as Site Verification, to monitor the completion of cable termination and
readiness.
-Follow the schedule activity and arrange the necessary materials needed.
-Weekly meeting with the Structural Engineers and Architects for the ongoing project status
and development.
- Managing and scheduling the routines or work assignments of the foreman’s, lead man’s,
skilled technicians and laborers.
- Reporting to the project manager to discuss the improvement of the project for the
Ongoing works.
- Prepare Daily Task, Weekly and Monthly Project Accomplishment.
EMPLOYER : SUEDROHRBAU S.A. LTD (NACAP)
P.O. Box 13014 Dammam 31493
Kingdom of Saudi Arabia
CLIENT : Saudi Aramco
PROJECT TITLE : Refined Product Pipeline, SHY-1 PIPELINE EXPANSION LOOP &
Khurais Seawater Injection & Distribution Header
POSITION HELD : QA/QC MECHANICAL ENGINEER Feb.06 2008 to Apr. 14 2011
DESCRIPTION OF DUTIES :
- Perform material receiving for mechanical inspection from Saudi Aramco yard transporting it to the Site prior to installation.
- Checked calibration instruments (PZV and pressure gauges) for pressure testing of Valves like ball valves, gate valves, check valves, plug valves and other valves associated in a typical pipeline distribution line.
- Inspect and check on site the specification of materials like pipe, spools and other fabricated associated in pipeline construction as per pipeline alignment drawing, Isometric drawing and material take off.
- Witness Internal Pipeline cleaning and Gauging prior to fill treated water into the pipeline for performing the pipeline hydro test.
- Witness and inspect the Flange joint Inspection and Tightening report using the recommended Torque values of SAEP-351.
- Witness and performs hydro testing of valves, pipe spool and pipelines using standard
Instruments for Saudi Aramco Engineering Standard.
- Ensuring that the field construction personnel are properly following the valves and
Pipe installation and testing requirements on site in compliance with Saudi Aramco
Engineering Standard, Industry Standard and Safety Manuals.
- Knowledge in QMIS, RFI system
- Familiar with SATIP/SATR and Saudi Aramco Engineering Standards
- Documentation works.
EMPLOYER : Mansearch Manpower Resources and Management Consultancy (STYROTECH CORP.)
Rm 304 Dona Lolita Bldg.I 363 Rizal Ave.Extension
Grace Park, Caloocan City.
PHILIPPINES
POSITION HELD : Maintenance Personnel Jan.31 2005 – June 31, 2006
DESCRIPTION OF DUTIES :
- Record machine status of the plan for the preparation of maintenance activity.
- Check pipeline for water and air as per standard checklist.
- Assist activity of technician, Mold Setter/ Installer, Planner/Coordinator
and Technical Staff designer.
EMPLOYER : Al Qassim Health Water Nov.30 2001 – Nov. 30, 2004
Al Badayeh, Al Wosta
P.O. Box 41 K.S.A
POSITION HELD : Production Supervisor
DESCRIPTION OF DUTIES :
- Prepare and request RAW materials as well as consumable needed in the production line.
- Coordinate to Store keeper and warehouse for the availability of Raw Materials
prior to production.
- Coordinate to Quality Control regarding Production Hold and Raw Materials for testing.
- Coordinate to other supervisor for the schedule, and assigned manpower available
for the overtime needed in the next production.
- Monitoring machine from Krupp machine (Blow Molding) going to Filter, Rinser,
Labeler up to Packer and Palletizer for possible machine trouble and safety of the operator.
- Coordinate to Mechanical and Electrical Maintenance regarding machine trouble encountered.
- Reports production start, Downtime and no, of production produced.
EMPLOYER : KENT INDUSTRIAL CO. LTD Sept. 2, 1998 – Sept. 2, 2000
No. 1 Industry 5th RD.Yeong Guang Tsuen Ping
Chen Country, Tao Yuan Hsien.Taiwan R.O.C
POSITION HELD : Mechanical Technician
DESCRIPTION OF DUTIES :
- Leveling based (z-axis), column (y-axis) & table (x-axis) of the CNC Vertical Machine (lathe machine)
using Dial indicator.
- Installation:
- Based, column, table
- Motor and Mechanical accessories.
- Checking the level of table and coordinate to the scraper regarding Tolerance of the surface flatness.
EMPLOYER : SUN VALLEY MANUFACTURING & DEVELOPTMENT CORP. Jun. 17, 1997 – Apr. 21, 1998
Km 15 West Service RD. Corner Sun Valley
Drive South Superhighway, Paranaque, M.M.
PHILIPPINES
POSITION HELD : Engineering Assistant/Estimator
DESCRIPTION OF DUTIES :
- Estimate rough weight for quotation/pattern fabrication as per drawing.
- Inspection of Pattern/Core box, core set up and casing result.
- Product development
- Submit suggestion report for some possible adjustment on the pattern/core box
for the required dimension tolerance.
- Assist Production Planning Control for scheduling as well as reporting
production for delivery.
- Monitoring production line of foundry & machining line for the project handled.
EMPLOYER : TIGER MACHINERY & INDUSTRIAL CORP. Nov. 2, 1995 – Feb. 15, 1997
# 359 V. Reales St. Valenzuela City,
PHILIPPINES
POSITION HELD : Mechanical Engineer/Estimator
DESCRIPTION OF DUTIES :
- Estimate rough weight of metal, Fabricated Panel including Hardware Accessories, Machining
and Fabrication Labor Cost.
- Coordinate:
- To Sales Engineer regarding Casting and Fabrication plan,
- Purchaser regarding Hardware Accessories.
- Production Planning Control labor for previous quotation.
EMPLOYER : LAWIN ENGINEERING AND MANAGEMENT SERVICES. Mar. 1, 1995 – Aug. 31, 1995
# 967 Quezon Ave., Corner Roosevelt Ave., Quezon City,
PHILIPPINES 1104
PROJECT : Coca-Cola Bottling Corp. - Sta. Rosa, Laguna (conveyor installation)
POSITION HELD : Cadet Engineer/Estimator
DESCRIPTION OF DUTIES :
- Coordinate to the Project Engineer, Fabrication Supervisor & Design Engineer.
- Estimate Bill of Materials for Installation.
- Prepares plans and fabrication drawing needed for installation.
- Submit quotation for installation of conveyor usually in a beverage company.
EMPLOYER : COSMOS BOTTLING CORPORATION Apr. 4, 1994 – Sept. 18, 1994
# 241 Mac Arthur Highway Malabon, M.M
PHILIPPINES
POSITION HELD : Mechanical Draftsman
DESCRIPTION OF DUTIES :
- Prepares layout for Production Line and other Plan preparation involve in the
Maintenances department.
- Coordinate to the Fabrication Supervisor and Maintenance Supervisor for the
Machine Elements needed for reproduction and quotation.
- Assist Production Supervisor regarding production output to achieve higher
production by suggesting mechanical parts of production machine to be replace.
- Gathering reports from Production Supervisor and Mechanical Supervisor.
EMPLOYER : SOLID PARTS CORPORATION Jan. 3, 1993 – Mar. 15, 1994
Arty Subdivision Valenzuela City,
PHILIPPINES
POSITION HELD : Quality Assurance Analyst
DESCRIPTION OF DUTIES :
- Inspection of Metal Sheet Forming using caliper jigs and through Visual appearance.
- Submit deviation notice to the costumer.
- Coordinate to the Fabrication Supervisor and Maintenance Supervisor regarding
Production problem.
TRAINING/SPECIAL COURSES : NDIA Supervisor’s training Course
Mr. Bill Smith
March 26, 2012
New Doha International Airport
Qatar
People Base Safety training Course
Mr. Jacobus van Wyk
March 11, 2012
New Doha International Airport
Qatar
Basic Scaffolding training Course
Sky Oryx JV
Jan. 28, 2012 to Jan. 30, 2012
New Doha International Airport
Qatar
Computer-Aided Design of Heating, Ventilating
And Air-Conditioning (HVAC) System
Engr. Karun U. Yusop
Dec. 17, 2011 to Dec. 22, 2011
Crescent Technologies
PHILIPPINES
Computer-Aided Sprinkler System Design
Engr. Karun U. Yusop
Dec. 21, 2011
Crescent Technologies
PHILIPPINES
Filler Machine Operation
Mr. Gilbert A. Duran
Nov. 30, 2001to Dec. 30, 2001
Al Qassim Health Water
Qassim K.S.A.
Negotiating Successfully
Mr. Cesar Ordona
April 2-6, 2001
Sanlex Roof Master Center Co. Inc.
PHILIPPINES
Food Service Equipment Estimation
Gomeco Metal Corporation
Dec. 16, 2000 to March 10, 2001
Gomeco Metal Corporation
PHILIPPINES
Gas Engine Mechanic
Meralco Foundation
Aug.23, 1997 to Oct. 11, 1997
Meralco Foundation
PHILIPPINES
Computer Aided Design & Drafting (CADD)
ACCESS Computer School
April 16, 1994 to June 20, 1994
ACCESS Computer School
PHILIPPINES
Seminar Flue Gas Sampling Procedures
Philippine Society of Mechanical Engineers
Sept. 17, 1991
Philippine Society of Mechanical Engineers
PHILIPPINES
Boiler Operation and Steam Power System
Philippine Society of Mechanical Engineers
Jan. 26, 1991
Philippine Society of Mechanical Engineers
PHILIPPINES
PERSONAL DATA
Place of Birth : Caguimitan Tuao Cagayan, Philippines
Date of Birth : May 03, 1970
Citizenship : Filipino
Language Spoken : English, Filipino
HDMF No. : 000*********
TIN No. : 166-***-***-***
Contact No’s. : +632*******, +639********* and +639*********
EDUCATIONAL BACKGROUND
College Education : Bachelor of Science in Mechanical Engineering
University of East, Caloocan City
(1987-1992)
Secondary Education : Lyceum of Tuao
Tuao Cagayan
(1983-1987)
Primary education : Cagumitan Elementary school
Cagumitan Tuao Cagayan
(1977-1983)
College Affiliation : Philippines Society of Mechanical Engineers
Member
(1990-1991)
I hereby certify that the above information is true and correct to the best of my knowledge and belief. Also I am aware
that my false declaration and/or information stated herein may mean disqualification of this application and/or employment, if hired.
Very truly yours,
ERNESTO D. CANAY, JR.
Applicant