Post Job Free

Resume

Sign in

Mechanical Engineer Project Manager

Location:
Philippines
Posted:
January 25, 2018

Contact this candidate

Resume:

NAME : ERNESTO D. CANAY, JR.

NATIONALITY : Filipino

POSITION : Mechanical Engineer

ADDRESS : Lot 7 BLK. 11 Ruby St. Meyland Village Lawa Meycauayan, Bulacan

P H I L I P P I N E S

EDUCATION : B. S. Mechanical Engineering

LANGUAGE PROFICIENCY : English, Tagalog

JOB OBJECTIVES : To join a company where my skills and aggregate experience will be utilized

to the fullest, leading to a greater contribution to the profit and growth of the

the company.

EMPLOYER : TEMPWELL CO.

Lot 1, Buckner St. Jade Heights,

Victoria Homes Tunasan, Muntilupa City, MM

Philippines

CLIENT : Transaire Development Holdings Corporation/San Miguel Corporation

PROJECT TITLE : Caticlan Airport Development Project Passenger Terminal Building

Caticlan, Nabas Aklan

POSITION HELD : Project Engineer/QC Engineer Aug. 7, 2017 to Present

DESCRIPTION OF DUTIES :

- Designing of Mechanical Systems, and Equipment for industrial facilities with respect to requirements and scope on small to large projects

- Preparing, scheduling, coordinating and monitoring the assigned engineering projects.

- Monitors work in progress and prepares weekly report of the status of each assignment.

- Coordinates with all projects related personnel on day-today progress of work activities, procurement and operations to ensure timely completion of the project.

- Make site visits to facilities and construction sites as required for client meetings, site measurements, and inspections

- Preparing Method of Statement and procedures for Mechanical work activities.

- Monitor and ensure that all Mechanical site activities are conducted in accordance with approved shop drawing, specification and installation procedure and material storage procedure is properly implemented.

- Perform material receiving for mechanical inspection prior to installation.

- An understanding of effective mechanical inspection processes, technical submittals

and drawing review.

- Review and check shop drawings prior for site implementation.

EMPLOYER : APTC Contracting Co. LTD.

P.O. Box 4802 Dammam 31412

Kingdom of Saudi Arabia

CLIENT : ROYAL COMMISSIONING

PROJECT TITLE : Auditorium and Training Center

JIC – Jubail

POSITION HELD : Site Mechanical Engineer Nov. 27, 2015 to Nov. 26, 2016

DESCRIPTION OF DUTIES :

- Ensures that all installed materials are in compliance with Royal Commission standards and contract drawings and documents.

- Ensures that the mechanical drawings are in line and coordinated with other discipline design drawings of the project prior proceeding with work and to highlight any discrepancies for necessary corrections.

- Review and check shop drawings prior for site implementation.

- Monitor and supervise the installation of HVAC Equipments, refrigerant piping systems and other required accessories to complete the systems.

- Monitor and supervise the fabrication, installation of ductworks systems, air devices, control device, insulation, hangers, and supports and other required accessories.

- Coordinate to Civil and Electrical and other discipline for the opening wall of Ducting and Piping.

- Monitor and ensure that all HVAC site activities are conducted in accordance with approved shop drawing, specification and installation procedure and material storage procedure is properly implemented.

- Inspection on ducting, lining, insulation of the air conditioning lines/system.

- Estimate and Review quantity take – off.

- Verify and check inspection request prior for QC inspection.

EMPLOYER : DAEWOO E&C Co., LTD

Al-Khobar Branch:

#1234, Hail Center, Al-Khobar, K.S.A.

CLIENT : SADARA (Saudi Aramco & DOW Chemical Co.)

PROJECT TITLE : SADARA Tank Farm (Jubail K.S.A.)

POSITION HELD : Site Mechanical Engineer Jul. 09, 2013 to Jul. 25, 2014

DESCRIPTION OF DUTIES :

- Verifies that materials, manufactured goods, machinery, equipment, etc supplied to the job site are in line with projects specification and granted approvals.

- Ensures that the mechanical drawings are in line and coordinated with other discipline design drawings of the project prior proceeding with work and to highlight to the project manager of any discrepancies for necessary corrections.

- Inspects site for mechanical work/installations and ensures that the carried out works are in compliance with contract drawings and documents. Advises the Project Manager on the progress any monitored discrepancies.

- Conducts site visits to advise Project Managers of any field issues and attends any co-ordination meetings required.

- An understanding of effective mechanical inspection processes, technical submittals and drawing review.

- Observes and witnesses all buried services and gives approval prior to concreting/filling.

- Arranges for samples of workmanship and establishes minimum acceptable standards.

- Assist and provides necessary data/information required by the project manager for the preparation of reports (includes labor and supervision, plant and equipment, status, site progress, amendments, delays, etc.) for submission to Client.

- Advises Project Manager on progress of mechanical work and suggests actions.

EMPLOYER : SKY ORYX JV (TAISEI-TAV Joint Venture)

New Doha International Airport Project - CP18

PO Box No. 55873 Doha Qatar

CLIENT : NDIA

PROJECT TITLE : New Doha International Airport Project - CP18

POSITION HELD : MEP Site Mechanical Engineer Feb. 29, 2012 to De30, 2012

DESCRIPTION OF DUTIES :

- Oversee and manage mechanical, electrical and plumbing works involving the

Design construction, maintenance, inspection, testing, certification and repair.

- Provide technical support on issues related to MEP building operations to the

Supervisor’s in other department.

- Implement shop drawing in the Mechanical and Plumbing System, Heating, Ventilating

and Air Conditioning (HVAC) System, Fire Protection System.

-Witness and inspect the preparation and rectification for Integration test of Fire Smoke

Damper and associated jobs such as: Issuing the list of FSD and drawings to the

Sub-con as well as Site Verification, to monitor the completion of cable termination and

readiness.

-Follow the schedule activity and arrange the necessary materials needed.

-Weekly meeting with the Structural Engineers and Architects for the ongoing project status

and development.

- Managing and scheduling the routines or work assignments of the foreman’s, lead man’s,

skilled technicians and laborers.

- Reporting to the project manager to discuss the improvement of the project for the

Ongoing works.

- Prepare Daily Task, Weekly and Monthly Project Accomplishment.

EMPLOYER : SUEDROHRBAU S.A. LTD (NACAP)

P.O. Box 13014 Dammam 31493

Kingdom of Saudi Arabia

CLIENT : Saudi Aramco

PROJECT TITLE : Refined Product Pipeline, SHY-1 PIPELINE EXPANSION LOOP &

Khurais Seawater Injection & Distribution Header

POSITION HELD : QA/QC MECHANICAL ENGINEER Feb.06 2008 to Apr. 14 2011

DESCRIPTION OF DUTIES :

- Perform material receiving for mechanical inspection from Saudi Aramco yard transporting it to the Site prior to installation.

- Checked calibration instruments (PZV and pressure gauges) for pressure testing of Valves like ball valves, gate valves, check valves, plug valves and other valves associated in a typical pipeline distribution line.

- Inspect and check on site the specification of materials like pipe, spools and other fabricated associated in pipeline construction as per pipeline alignment drawing, Isometric drawing and material take off.

- Witness Internal Pipeline cleaning and Gauging prior to fill treated water into the pipeline for performing the pipeline hydro test.

- Witness and inspect the Flange joint Inspection and Tightening report using the recommended Torque values of SAEP-351.

- Witness and performs hydro testing of valves, pipe spool and pipelines using standard

Instruments for Saudi Aramco Engineering Standard.

- Ensuring that the field construction personnel are properly following the valves and

Pipe installation and testing requirements on site in compliance with Saudi Aramco

Engineering Standard, Industry Standard and Safety Manuals.

- Knowledge in QMIS, RFI system

- Familiar with SATIP/SATR and Saudi Aramco Engineering Standards

- Documentation works.

EMPLOYER : Mansearch Manpower Resources and Management Consultancy (STYROTECH CORP.)

Rm 304 Dona Lolita Bldg.I 363 Rizal Ave.Extension

Grace Park, Caloocan City.

PHILIPPINES

POSITION HELD : Maintenance Personnel Jan.31 2005 – June 31, 2006

DESCRIPTION OF DUTIES :

- Record machine status of the plan for the preparation of maintenance activity.

- Check pipeline for water and air as per standard checklist.

- Assist activity of technician, Mold Setter/ Installer, Planner/Coordinator

and Technical Staff designer.

EMPLOYER : Al Qassim Health Water Nov.30 2001 – Nov. 30, 2004

Al Badayeh, Al Wosta

P.O. Box 41 K.S.A

POSITION HELD : Production Supervisor

DESCRIPTION OF DUTIES :

- Prepare and request RAW materials as well as consumable needed in the production line.

- Coordinate to Store keeper and warehouse for the availability of Raw Materials

prior to production.

- Coordinate to Quality Control regarding Production Hold and Raw Materials for testing.

- Coordinate to other supervisor for the schedule, and assigned manpower available

for the overtime needed in the next production.

- Monitoring machine from Krupp machine (Blow Molding) going to Filter, Rinser,

Labeler up to Packer and Palletizer for possible machine trouble and safety of the operator.

- Coordinate to Mechanical and Electrical Maintenance regarding machine trouble encountered.

- Reports production start, Downtime and no, of production produced.

EMPLOYER : KENT INDUSTRIAL CO. LTD Sept. 2, 1998 – Sept. 2, 2000

No. 1 Industry 5th RD.Yeong Guang Tsuen Ping

Chen Country, Tao Yuan Hsien.Taiwan R.O.C

POSITION HELD : Mechanical Technician

DESCRIPTION OF DUTIES :

- Leveling based (z-axis), column (y-axis) & table (x-axis) of the CNC Vertical Machine (lathe machine)

using Dial indicator.

- Installation:

- Based, column, table

- Motor and Mechanical accessories.

- Checking the level of table and coordinate to the scraper regarding Tolerance of the surface flatness.

EMPLOYER : SUN VALLEY MANUFACTURING & DEVELOPTMENT CORP. Jun. 17, 1997 – Apr. 21, 1998

Km 15 West Service RD. Corner Sun Valley

Drive South Superhighway, Paranaque, M.M.

PHILIPPINES

POSITION HELD : Engineering Assistant/Estimator

DESCRIPTION OF DUTIES :

- Estimate rough weight for quotation/pattern fabrication as per drawing.

- Inspection of Pattern/Core box, core set up and casing result.

- Product development

- Submit suggestion report for some possible adjustment on the pattern/core box

for the required dimension tolerance.

- Assist Production Planning Control for scheduling as well as reporting

production for delivery.

- Monitoring production line of foundry & machining line for the project handled.

EMPLOYER : TIGER MACHINERY & INDUSTRIAL CORP. Nov. 2, 1995 – Feb. 15, 1997

# 359 V. Reales St. Valenzuela City,

PHILIPPINES

POSITION HELD : Mechanical Engineer/Estimator

DESCRIPTION OF DUTIES :

- Estimate rough weight of metal, Fabricated Panel including Hardware Accessories, Machining

and Fabrication Labor Cost.

- Coordinate:

- To Sales Engineer regarding Casting and Fabrication plan,

- Purchaser regarding Hardware Accessories.

- Production Planning Control labor for previous quotation.

EMPLOYER : LAWIN ENGINEERING AND MANAGEMENT SERVICES. Mar. 1, 1995 – Aug. 31, 1995

# 967 Quezon Ave., Corner Roosevelt Ave., Quezon City,

PHILIPPINES 1104

PROJECT : Coca-Cola Bottling Corp. - Sta. Rosa, Laguna (conveyor installation)

POSITION HELD : Cadet Engineer/Estimator

DESCRIPTION OF DUTIES :

- Coordinate to the Project Engineer, Fabrication Supervisor & Design Engineer.

- Estimate Bill of Materials for Installation.

- Prepares plans and fabrication drawing needed for installation.

- Submit quotation for installation of conveyor usually in a beverage company.

EMPLOYER : COSMOS BOTTLING CORPORATION Apr. 4, 1994 – Sept. 18, 1994

# 241 Mac Arthur Highway Malabon, M.M

PHILIPPINES

POSITION HELD : Mechanical Draftsman

DESCRIPTION OF DUTIES :

- Prepares layout for Production Line and other Plan preparation involve in the

Maintenances department.

- Coordinate to the Fabrication Supervisor and Maintenance Supervisor for the

Machine Elements needed for reproduction and quotation.

- Assist Production Supervisor regarding production output to achieve higher

production by suggesting mechanical parts of production machine to be replace.

- Gathering reports from Production Supervisor and Mechanical Supervisor.

EMPLOYER : SOLID PARTS CORPORATION Jan. 3, 1993 – Mar. 15, 1994

Arty Subdivision Valenzuela City,

PHILIPPINES

POSITION HELD : Quality Assurance Analyst

DESCRIPTION OF DUTIES :

- Inspection of Metal Sheet Forming using caliper jigs and through Visual appearance.

- Submit deviation notice to the costumer.

- Coordinate to the Fabrication Supervisor and Maintenance Supervisor regarding

Production problem.

TRAINING/SPECIAL COURSES : NDIA Supervisor’s training Course

Mr. Bill Smith

March 26, 2012

New Doha International Airport

Qatar

People Base Safety training Course

Mr. Jacobus van Wyk

March 11, 2012

New Doha International Airport

Qatar

Basic Scaffolding training Course

Sky Oryx JV

Jan. 28, 2012 to Jan. 30, 2012

New Doha International Airport

Qatar

Computer-Aided Design of Heating, Ventilating

And Air-Conditioning (HVAC) System

Engr. Karun U. Yusop

Dec. 17, 2011 to Dec. 22, 2011

Crescent Technologies

PHILIPPINES

Computer-Aided Sprinkler System Design

Engr. Karun U. Yusop

Dec. 21, 2011

Crescent Technologies

PHILIPPINES

Filler Machine Operation

Mr. Gilbert A. Duran

Nov. 30, 2001to Dec. 30, 2001

Al Qassim Health Water

Qassim K.S.A.

Negotiating Successfully

Mr. Cesar Ordona

April 2-6, 2001

Sanlex Roof Master Center Co. Inc.

PHILIPPINES

Food Service Equipment Estimation

Gomeco Metal Corporation

Dec. 16, 2000 to March 10, 2001

Gomeco Metal Corporation

PHILIPPINES

Gas Engine Mechanic

Meralco Foundation

Aug.23, 1997 to Oct. 11, 1997

Meralco Foundation

PHILIPPINES

Computer Aided Design & Drafting (CADD)

ACCESS Computer School

April 16, 1994 to June 20, 1994

ACCESS Computer School

PHILIPPINES

Seminar Flue Gas Sampling Procedures

Philippine Society of Mechanical Engineers

Sept. 17, 1991

Philippine Society of Mechanical Engineers

PHILIPPINES

Boiler Operation and Steam Power System

Philippine Society of Mechanical Engineers

Jan. 26, 1991

Philippine Society of Mechanical Engineers

PHILIPPINES

PERSONAL DATA

Place of Birth : Caguimitan Tuao Cagayan, Philippines

Date of Birth : May 03, 1970

Citizenship : Filipino

Language Spoken : English, Filipino

HDMF No. : 000*********

TIN No. : 166-***-***-***

Contact No’s. : +632*******, +639********* and +639*********

EDUCATIONAL BACKGROUND

College Education : Bachelor of Science in Mechanical Engineering

University of East, Caloocan City

(1987-1992)

Secondary Education : Lyceum of Tuao

Tuao Cagayan

(1983-1987)

Primary education : Cagumitan Elementary school

Cagumitan Tuao Cagayan

(1977-1983)

College Affiliation : Philippines Society of Mechanical Engineers

Member

(1990-1991)

I hereby certify that the above information is true and correct to the best of my knowledge and belief. Also I am aware

that my false declaration and/or information stated herein may mean disqualification of this application and/or employment, if hired.

Very truly yours,

ERNESTO D. CANAY, JR.

Applicant



Contact this candidate