Objective: A career position in a dynamic electrical engineering firm with an emphasis on quality design in medical facilities, schools, and other Institutional facilities. The position would be as a Project Manager and draw upon my past experience in the preparation of construction documents and field supervision during the project erect phase. Personal: An aggressive self-starter with approximately eighteen years experience as an Electrical Designer and Project Manager with REVIT MEP and CADD experience. Possess good verbal and written communication skills, and in the last twelve years have specialized in hospital, medical facility and school electrical design.
Design experience includes the following: Illumination engineering and lighting systems; power generation and distribution systems; security, communication, signal and fire alarm systems; audiovisual, television and telephone distribution system; electrical systems modernization; UPS systems; substation and power plant designs; construction administration and coordination; energy calculations and projected power usage for utility companies; overseeing the development of time schedules, job reports and work order review; produced engineering cost estimates and construction estimates, and building commissioning.
I also have ten years of experience in Californiaworking with the hospital plan review agency Office of State Hospital Planning Department
(OSHPD).
Project Managers experience includes but not limited to interface between the owner and the Consulting office. Orchestrates and organizes projects meetings, schedules and materials such as agendas, timelines, reports, and presentations to discuss project status. Experience also includes interfacing between the in-house design team, the owner and the contractor.
Charles G. Wilkerson Page 2
Education:
1970-1973 Los Angeles High School
4650 West Olympic Boulevard
Los Angeles, CA. 90019
Degree: High School Diploma
1973-1973 Los Angeles Trade Technical College
400 West Washington Blvd.
Los Angeles, CA. 90015
1974-1979 West Coast University
440 Shatto Place
Los Angeles, CA. 90020
Degree: B.S. Electrical Engineering
2001-2001 Building Commissioning Association
Seattle, Washington 98155
Degree: Commissioning Certificate
2011-2012 WestTec College School of Technology
3491 E. Concours Ave
Ontario, CA. 91764
Degree: REVIT MEP Certificate of Completion
Employment History:
2016 Current BURO HAPPOLD
*Electrical Engineer
Designed, coordinate, and project manage various commercial projects on ACAD and REVIT MEP
2013- 2015 BERGMANN AND ASSOCIATES
*Electrical Engineer
Designed and project manage various commercial projects on ACAD and REVIT MEP
2011-2013 ME ENGINEERS
*Electrical Engineer
Designed and project manage various Hospitals on Auto CADD. 2006-2011 SYSKA HENNESSY
*Project Manager/ Electrical Design Engineer
Designed, project managedand construction managed various Hospital on Auto CADD.
Charles G. Wilkerson Page 3
1998-2006 MAZZETTI AND ASSOCIATES
*Project Manager. Electrical Design Engineer
Designed, project managed and CA’edvarious MOB's and hospital labs electrical systems on Auto CADD.
1986-1998SAMPSON, RANDALL & PRESS, LOS ANGELES, CA
*Project Manager/Electrical Design Engineer
Responsible as project Engineer included maintaining project schedules, acting as liaison between Sampson, Randall &, Press, and clients, and disseminating information to project team. I was also responsible for projects from the schematic design phase up to and including construction services.
Selected Projects:
Medical Facilities
Project name: Santa Barbara Hospital
Various hospital tenant improvement projects
Date: (2011-2012)
Position: Lead Electrical Design Engineer,
Project Manager, construction administration
Coordinator. Interacted with in house
electrical, mechanical and plumbing design
teams Interacted with architects and
construction team
Project name: Fort BenningGeorgia
40,000 square foot dental suite
Date: (2010)
Position: Lead Electrical Design Engineer,
Project Manager, construction administration
Coordinator. Interacted with in house
electrical, mechanical and plumbing design
teamsInteracted with architects and
construction teams
Estimated Budget: $1.1 million
Project Included: Field Survey, engineered lighting, power, and special systems, and electrical service
upgrade for dental suites.
Provided power to mechanical and plumbing
equipment.
Project name: Fort Hood Texas
45,000 square foot dental suite
Date: (2010)
Charles G. Wilkerson Page 4
Position: Lead Electrical Design Engineer, Project Manager, construction administration
Coordinator. Interacted with in house
electrical, mechanical and plumbing design
teams. Interacted with client and
construction team
Estimated Budget: $1.2 million
Project Included: Field Survey, engineered lighting, power, and special systems, and electrical service
upgrade for dental suites.
Provided power to mechanical and plumbing
equipment.
Project Name: Las Vegas Veteran Administration Hospital Las Vegas, NV
Date: (2008-2010)
Position: Lead Electrical Design Engineer, Project Manager, construction administration
coordinator
Interacted with in house electrical,
mechanical and plumbing design teams.
Interacted witharchitects, client, owner,
independent design review teams, utility
companies, andconstruction teams
Estimated Budget: $900 million
Project Included: Engineered site lighting plans, central plant, filed project status reports, and observed
generator start up.
Schools, Universities & Colleges.
Project: Carnegie Mellon University
Construction Administration
Date (2016- Current)
Position: Lead Electrical Design Engineer,
Interacted with mechanical and plumbing
teams
Charles G. Wilkerson Page 5
Project: Rosemead School District
Various projects for the Savanna Elementary
School, Janson Middle School, Encinitas
Elementary School, and Shuey Elementary
School including Administration Building
Upgrades and Main Service Upgrades.
Developed Master Plans for the District
Date (2004-2006)
Position: Lead Electrical Design Engineer,
Interacted with mechanical and plumbing
teams
Interacted with utility companies, owners
architects,and DSA
Project Included: Field Survey, engineered lighting, power, and special systems. Provided power to
mechanical and plumbing equipment.
Project: Los Angeles High School Mechanical
System Upgrade (2006)
Provided electrical power for new cooling
towers and mechanical units.
Date: (2006)
Position: Lead Electrical Design Engineer,
Interacted with mechanical and plumbing
teams
Interacted with utility companies, architects,
and DSA
Project Included: Field Survey, provided power to
mechanical and plumbing equipment.
Commissioning Project:
Project: San Francisco Aviation Museum
San Francisco, CA.
11,500 Sq. Ft. Museum
Contractor: LEM Construction, INC
Date: (1999)
Position: Project Coordinator, Commissioner
Interacted with project design consultants,
project contractors, fire alarm inspector, and
City Inspectors
Project Included: Monitoring the project progress, schedule, construction administration, coordinated
system pre-testing, change orders.
Charles G. Wilkerson Page 6
References:
MattEbejer Mich Grubbs
Western Regional Health Care Manager Electrical Engineer
Shield Anderson Jon Inman
Team Leader- Budlong and Associates Team Leader-Mazzetti Associate
Ernie Brown
Engineer
Person Engineer
8825 N. 23rd Ave.
Phoenix, Az. 85012