Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Bacoor, CALABARZON, Philippines
Posted:
January 16, 2018

Contact this candidate

Resume:

EDSEL P. HAYAG

Blk-**. L-**, Viva Homes Subd.

Salawag, Dasmarinas City, Cavite

email add : ac3198@r.postjobfree.com

PASSPORT : EC6500968

Mobile # :+639*********

+639*********

CAREER OBJECTIVE:

To pursue a challenging and rewarding career with the aid of my knowledge and skills for the benefits of the company and for further enhancement and advancement for greater responsibility.

PROFESSIONAL EXPERIENCE:

QROi Network Services Inc.

Senior BTS Engineer

16th Floor Pet Plans Tower

444 E. Delos Santos Avenue

Guadalupe Viejo, Makati City

Metro Manila Philippines

Key Responsibility:

Responsible for Commissioning and Integration of Nokia FMR Radio such as 2G- G900, G1800, / 3G- U900 and U2100./ 4G LTE – L700, L850, L1800, L2100.

Indoor and Outdoor Installation of Nokia FMR ( REFARM)

Responsible for G1800 downgrade

Responsible for Filter and Diplexer Combiner Installation .

RET Installation and Calibration.

CMC COMMUNICATION Phil. Inc.

Project Engineer

June 20, 2016 – February 23, 2017

Unit 3D 3rd Floor Country Space 1 Bldg.

Sen. Gil Puyat Ave. Makati City

Key Responsibility:

Supervise the Installation of Indoor and Outdoor antenna, BTS, Microwave and CME.

Responsible in Commissioning and Integration of Transmission and Huawie BTS 2G, 3G, LTE.

Coordinate Sub-Contractors and Clients for Site Updates.

COMMSEC INC.

March 16, 2016 – May 15, 2016

PROJECT MANAGER

Key Responsibility:

Coordinate and attend meeting with the client regarding the status of the project.

Deployment of Engineers for their assigned Project.

Prepare Timeline for every project and Scope of works.

Prepare BOQ for every Project.

Masharef Al-AsimahCompany for Telecom & IT

CAPITAL HILLS COMPANY

1st Floor, Al Hiyyas Bldg.,

Dabab St., Olaya Area

P.O. Box 16100

Riyadh 11464 K.S.A.

June 16, 2013 – October 30, 2015

Key Responsibility:

PROJECT HANDLED:

(STC) SAUDI TELECOM COMPANY:

Supervise the Installation of Microwave Antenna, BTS Antenna, Testing, Panning,

Responsible in Installation and Commissioning and Integration of Ericsson Mini – Link TN 2P, 6P, 20P and RBS 6000 and Troubleshooting.

Mini-Link TN 2P, 6P, 20P, RRU and TMA Installation and Upgrade System

Supervise the Installation of Microwave Antenna, BTS Antenna, LTE 4G Huawei RBS 3900 Transmission, Optical Fiber Installation, Testing, Commissioning and Integration of Huawei RBS 3900 and RTN 950 – 910 and Troubleshooting.

Change out Ericsson cabinet from 2106, 2207, 2107, 2206 to RBS 6000 and 3000.

Installation of W900 TMA and RET Unit for Ericsson.

Doing Pre-PAT and Site Inspection before coming the PAT. Using Site Master

Responsible in Nokia Siemens Networks - Installation of Outdoor and Indoor Flexi BTS equipment include NHA and RET unit. Commissioning of LTE 4G, 3G, 2G, 1800, 2300.

General Intelligence and Directorate (GID):

Installation of MW, Omni Antenna, Quaxial Cable LDF 5.

Alignment of MW from Far end and Near end.

Responsible in Commissioning or Configure the Harris/ Stratex Radio. Using IP to access.

MOBILY COMPANY:

Responsible in Installation of NSN RNC 114, 116,117 Laying of Fiber cable, Cat5/Cat 6 cables from RNC toODF, from ODF to MPLS, from ODF to JUNIPER Router. Laying of Power cable and groundings.

Responsible in Testing of Fiber cable using Power Meter and Trouble shooting.

ZAIN TELECOM COMPANY:

Indoor and Outdoor Quality Site Audit at Zain Telecom Company.

AL-HASHEMIYAH Co.

HATCO TELECOMMUNICATION Co.

P.O. Box 10510 Riyadh 11443

Kingdom of Saudi Arabia

October 2011 – June 2013

Key Responsibility:

PROJECT HANDLED:

(STC) SAUDI TELECOM COMPANY:

Supervice the Installation of Microwave Antenna, BTS Antenna, Testing,Panning, Commissioning and Integration of Ericsson Mini – Link TN 2P, 6P, 20P and RBS 6000. RRU and TMA Installation for W900 upgrade and configuration and Integration.

Responsible in Installation of Mini-Link TN 2P, 6P, 20P and Configuration.

Supervice the Installation of Microwave Antenna, BTS Antenna, Huawei RBS 3900 Transmission, Optical Fiber Installation, Testing, Commissioning and Integration of Huawei RBS 3900 and RTN 950 – 910.

Responsible in Change out cabinet from 2106, 2207, 2107, 2206 to RBS 6000.

Doing Pre-PAT and Site Inspection before coming the PAT. Using Site Master.

Responsible in Technical Site Survey, LOS and Documentation.

MOBILY COMPANY:

Responsible in Installation of RNC 114, 116/2600, Laying of Fiber cable, Cat5/Cat 6 cables from RNC to ODF, from ODF to MPLS, from ODF to JUNIPER Router. Laying of Power cable and groundings.

Responsible in Testing of Fiber cable using Power Meter and Trouble shooting.

GENERAL INTELEGENCE DETECTION (GID):

Installation of MW, Omni Antenna, Quaxial Cable LDF 5.

Alignment of MW from Far end and Near end.

Responsible in Commissioning or Configure the Harris/ Stratex Radio. Using IP to access.

Global Light Communication Solution

March 15, 2011 – July 30, 2011

129 LVL Bldg 2/F 10th Ave. Cubao,

Quezon City, Philippines

Key Responsibility:

Installer, Rigger ( Tower Climber), Commissioning and Integration, and Troubleshooting on 2G and 3G Nokia Siemens Network and Ericsson RBS, Technical Site Survey, Documentation on Site Folder, and Testing.

Responsible to Install and Commissioning Module Upgrade on NSN Ultra site and Intra Talk Family and Change-out.

Responsible in Installation and Commissioning of Flexi MR, VSWR Testing.

ETSI Technologies Inc.

Sept. 2009 to Feb 15, 2011

Network Implementation Engineer

Mercedes Business Park

Mercedes Ave., Cainta, Rizal

Key Responsibility:

Responsible in Installation and Commissioning, Intagration, and Troubleshooting of Ericsson RBS 2106, 2116, 2206, 2202, 2207, 2216. Include site upgrade, change- out.

Responsible in Installation and Commissioning and Integration Including Troubleshooting and Testing of Nokia Siemens Network Ultra Site Cabinet And Intra Talk Family. And Module Upgrade and Change-out Cabitnet for Intra Talk Family to Ultra site and WCDMA Flexi BTS.

Intex Telecom System

July 01, 2008 Telecom Engineer (Team Leader)

Intex Telecoms Systems

Intex House 221 N. Garcia St., Bel-Air II, Makati City,

Philippines

Key Responsibilities:

Responsible in Installation commissioning, integration and troubleshooting of 3rd Generation Flexi BTS (Nokia Siemens Networks).

Coordinate with NSN Personnel for Upgrading of Sites.

Responsible in Installation integration, Commissioning and troubleshooting of 3rd Generation Flexi BTS (Nokia Siemens Networks SMART Communications Project).Commissioning.

Wireless Technology Solutions

Dec. 05, 2005 June 30, 2008 Telecom Field Engineer

3rd floor ITC Building

337 Sen. G. Puyat Ave. Makati City

Philippines

Key Responsibilities:

Responsible in Installation, Commissioning, Intagration, and Troubleshooting of RBS 2106, 2107, 2206.

Coordinates with sub-contractors, project engineers, building administrators and/or engineers and general managers to discuss the proposed project and to ensure a systematic and progressive work before, during and after construction/ installation of cell sites.

Handles sub-contractors that specialize in site installation of various cell sites especially for Globe projects.

Performs Commissioning, Provisionary Acceptance Testing, troubleshooting, supervision of antenna mounting, cable fabrication, BER testing .

COMPETENCIES

TECHNICAL:

Strong knowledge and hands-on experience with the installation, commissioning, integration and troubleshooting of Nokia Talk Family, Ultrasite BTS equipments, especially in Supreme Indoor Base Transceiver Station (BTS).

Strong knowledge in WCDMA 3G Nokia flexi BTS Installation, Commissioning, Integration and Troubleshooting.

Strong knowledge in Commissioning, Integration and Troubleshooting in Node B Siemens.

Strong Strong knowledge in Installation Standard of BTS Antenna, Mirowave, RBS Ericsson Cabinet, Commissioning and Integration, Troubleshooting and Testing using Site Master.

Strong knowledge in Commissioning and Integration in Siemens SRAL Radio, NEC NEO, NERA Radio and Alcatel Transmission Radio, Mini-Link TN, Huawei RTN 910/950 and Huawei LTE.

Knowledge and Experienced with the installation and commissioning of Mini Link TN/E.

Knowledge and experience in Technical site survey and Documentation.

Strong Knowledge and experience in Pre-PAT Site Inspection before coming PAT.

Strong knowledge for installation and commissioning IBS equipment.

EDUCATION:

BS in Electrical Engineering

Rizal Memorial College

Davao City Philippine

SEMINARS / TRAININGS ATTENDED:

Safety Training on Working at Hieghts

ETSI TECHNOLOGIES Inc

March 16, 2010

COMBA Tower Mounting Amplifier System

Wireless Technology Solutions Boardroom

3/F ITC Bldg.,Gil Puyat Avenue, Makati City, Philippines

August 31, 2007

Nokia Siemens Networks 3rd Generation Networks FlexiBTS Commissioning and Integration

Software and Data Engineering Boardroom

1/F ITC Bldg., Gil Puyat Avenue, Makati City, Philippines

May 02, 2007

COMBA RD- 2122: WCDMA Channel Selective Repeater

Wireless Technology Solutions Boardroom

3/F ITC Bldg.,Gil Puyat Avenue, Makati City, Philippines

February 13, 2007

PERSONAL INFORMATION:

Marital Status : Single

Birthdate : June 22, 1973

Place of Birth : Kumalarang Zamboanga del Sur

Religion : Roman Catholic

Fathers Name : Eufemio L. Hayag

Mothers Name : Ermelinda Perocho

Languages Spoken : English, Filipino and Cebuano

Philippine Driver’s License :L06 -97 – 051721

PASSPORT : EC6500968

CHARACTER REFERENCES:

Arnel Surisantos

Senior Supervisor

Network Delivery Group (Smart Build)

Smart Communication Inc.

094********

Michael Mapano

Project Manager

QROi Network Services Inc.

16th Floor Pet Plans Tower

444 E. Delos Santos Avenue

Guadalupe Viejo, Makati City

+63-949-***-****

Jason Mangaliag

Site Engineer

Huawei Philippines Inc.

094********

I HEREBY DECLARE THAT THE ABOVE INFORMATION IS TRUE AND ACCURATE TO MY BEST OF KNOWLEDGE AND BELIEF.

EDSEL P. HAYAG

Mobile: +639*********



Contact this candidate