Dan Caballero

*** *********

San Antonio, TX ****3

210-***-****

*************@*****.***

Objective

To be an exceptional employee. Adhere to all company standards, policies and procedures. Encourage teamwork within one another. Dependable, Dedicated, Personable. Work Experience

Texas Utility Engineering - Outside Plant Engineering Nov. 2017 - Dec. 2017 San Antonio, Texas / Comal County

● Make Ready work - Spectrum Communications

● Create and add data to new pole contact attachment information.

● Field work - White Line and capture and locate data. United Development Corporation (UNDC) Jan. 2017 - Mar. 2017 Outside Plant Manager / San Antonio area - AT&T Fiber Upgrade Project (“Light GIG”)

● Manage and oversee four walkout crews.

● Obtain data from make ready field crews.

● Spot check field data to insure that upgrading for “Light GIG” project would suffice and minimize service disruption to existing plant.

● Insure that crews were always busy and produce spreadsheet that would create the following weeks work.

● insure that all permitting was submitted and detailed oriented thus reducing approval time for process.

● All work orders were checked for correct information to submit for “make ready process.”

Golden Field Services (GFS) / Outside Plant Engineering Aug. 2016 - Mar. 2017

GFS - San Antonio, Austin / Tulsa, Oklahoma Main Office

● Maintain outside telecommunications plant for MCI/Verizon in the San Antonio, Austin, Texas area.

● Create field notes from walkouts and pre-engineering plans where the fiber plant is affected by new or changed street plans.

● Coordinate with City and State officials with a scheduling of construction crews.

● In sure that all permitting issues are addressed and issued in a timely manner so that all due dates are completed in a timely manner.

● Insure that all proposed facilities are to be placed within the right of way and do not hinder private property. This includes all overhead and underground design. NEIL Engineering / Outside Plant Engineering April 2016 - August 2016 NEIL - San Marcos, Texas / AT&T San Antonio and Austin Area

● Provide Engineering walkouts and create engineering field notes for AT&T in the San Antonio / Austin area.

● Work with AT&T Engineers and determine where and when certain cables need to be moved or eliminated.

● Insure that all engineering is noted correctly so that drafting can update construction and as-built drawings.

● Coordinate with the telecommunications planners issue work is dircted to appropriate planners.

● Coordinate with contract Engineers, insure that all details are field verified and current as-builts are correct.

● Acquire field data to insure that the plans are correct for new “Opti- Design”. List all make ready notes where cables have to be adjusted according to standards. American Electric Power (AEP) / Telecom Outside Construction Feb.-2015-2016 AEP - Texas / Telecom Corpus Christi, TX.

● Outside Plant Engineering - Plant infrastructure, site survey, fiber design, bid review and construction followed by inspections.

● Fiber Deployment Drawings – Small World, Visio, Transmission Line interface. Make ready issues addressed, permitting to include TXDOT,UPRR standards.

● GIS Platform – Revise database to reflect as-built plant modifications.

● Engineering Consultants – Provide comments and recommendations to drawings in order to minimize potential conflicts to AEP’s Fiber Network Infrastructure.

● Fiber Network Design – Determine location of termination node in the line control house in the Substation Environment.

● Deployment of Fiber Plant that AEP owns within the Texas North Communications and the Texas Central Communications partners that integrate with AEP.

● Coordinate and award telecom projects to awarded contractors. Provide all needed tools and documentation.

● Meet weekly with Project Management on all new and retrofitted substation designs to include fiber intigration.

● Safety training on a monthly basis to include various certifications.

● Insure that all proposed facilities are to be placed within the right of way and no encroaching onto private property. Aerial and underground proposed design. Telecommunications Planner/ OSP Engineering Feb.-2001-2015 CPS Energy/Communications, San Antonio, TX

● Outside Plant Engineering - Plant infrastructure, site survey, fiber design, bid review and construction followed by inspections and as-builts. (turnkey)

● Fiber Deployment Drawings – GIS/Microstation. Make ready issues addressed, permitting to include TXDOT, COSA and UPRR standards.

● GIS Platform – Revise database to reflect as-built plant modifications. Produce bill of materials and online order process automation.

● Civic Improvement Projects – COSA, TXDOT, Bexar County. Review, comment and provide construction drawings to relocate communication cables.

● Engineering Consultants – Provide comments and recommendations to drawings in order to minimize potential conflicts to CPS’s Fiber Network Infrastructure.

● Fiber Network Design – Determine location of termination node in the communication shelter. Substation Environment.

● Communication Cable Infrastructure – Responsible for 950 miles of fiber and copper network facilities. Support to include transmission and distribution structures.

● COSA Facilities – Coordinate and co-locate fiber interface facilities with City of San Antonio IT Infrastructure.

● Member and Chairman – San Antonio Area Utility Coordination Council.

● COSA Interface – Weekly project review with Traffic Division, Public Works, CIMS and Drainage Operations.

● Permit Process – Submit Engineering drawings along with necessary documentation to build aerial and/or underground communication facilities impacted via right of way of TXDOT, COSA – streets and drainage, UPRR/SPRR – Railroad.

● Insure that all design for new plant placement is in the designated right of way and will not hinder private property.

Microstation Technician Jan. 2000- Feb. 2001

FBS Communications (Black Box), San Antonio, TX

● Microstation – Provide plan and profile drawings. AT&T underground plant adjustments.

● Outside Plant Survey – Locate and determine depth and conflict of underground plant.

● Manhole and Vault – Survey and identify fiber and copper cables, splice designation.

● As Built Documentation – Revise plan and profile addendum sheets.

● Overhead Engineering – Field survey copper cable designation, make ready process. As Built / Civic Improvement Coordinator May 1981- Dec. 1999 Time Warner Cable, San Antonio, TX

● Provide construction/design drawings for construction purposes.

● As built Coordinator – Insure proper updates to 2200 Microstation system maps.

● Civic Improvement Coordinator – Represent Time Warner Cable as a utility in projects produced by COSA, TXDOT, Bexar County and various outside agencies. Certifications

Digital Techniques – Time Warner Cable Training Center

● Knowledge of Digital and Analog networks

International Right of Way Association

● Legal Aspects of Easements

Engineering Utility Plans – Texas A&M Extension Service

● Public Works Training Division

BICSI – Member, Advanced Information Technology Systems

● Data Center Design / Network Technology Systems Design Drawing/Design Formats

Microstation/Bentley, Version 8

AutoCAD, Release 12&14

PLS CADD, Transmission Plan & Profile

GIS Database, Arc/FM Schnieder Electric

Lode Data Design Assistant, Cable TV design program References

Larry Stalcup, Golden Field Services 918-***-**** Mike Fraley, American Electric Power 614-***-**** Abe Ramirez, City of San Antonio 210-***-**** Anibal Gutierrez, Neil Engineering 512-***-**** Debbie Reed, American Electric Power...918-***-**** 918-***-****

Doug Kougal, MCI/Verizon 512-***-**** 214-***-****

Jay Pickard, American Electric Power 918-***-**** Jeff Burg, CPS Energy - San Antonio, Tx...210-***-**** Javier Palomino, T&D Solutions 210-***-**** Tom Saenz, American Electric Power 361-***-****



Contact this candidate