Post Job Free

Resume

Sign in

Power Plant Electrical

Location:
Bhubaneswar, OD, India
Salary:
Rs.33000 per month
Posted:
October 22, 2017

Contact this candidate

Resume:

RESUME

HIRANMAYA KUMAR NAYAK

Mobile Nos.:094********

E-Mail:ac2vys@r.postjobfree.com

JOB OBJECTIVE

To perform as a professional in the power sector where I can utilize my skills for the betterment of the industry and improvise on my educational expertise to broaden my horizons.

PROFILE SUMMARY

A result oriented professional with 5.7yearsof experience in Maintenance,Testing &Project execution.

Planning,scheduling and execution of project activities on daily & monthly basis.

Planning & implementing preventive, predictive & breakdown maintenance schedules for improving overall reliability and safety of plant equipment & machinery.

Sound knowledge in Electrical protection systems of Transformer,Motors,Feedersetc.

Exposure in handling maintenance of Electrical equipment including Panels, Motors, Transformers, Switchgear etc.

CORE COMPETENCIES

Looking into project management & execution activities starting from engineering to delivery of equipment

Carrying out fault diagnosis and resolving routine problems in the plant

Handling the process of erection, commissioning and maintenance of electrical equipment.

ORGANIZATIONAL EXPERIENCE

Feb’13 to Present Date OCL Iron & Steel Ltd.,Rajgangpur Executive Engineer (E & I)

Assignment Handled:

Site: OCL Iron and Steel Ltd., Rajgangpur

Capacity: 70MW(2*35 MW) TDPS make Generator & Siemens Turbine

Boiler: 306 TPH CFBC Boilers

Responsibilities:

Operation &Maintenance:

Served as a shift Engineer and looked after all electrical activities like regular monitoring, check-up, readings and documentation.

Preventive Maintenance of HT(6.6 KV) & LT motors(415 v) and its testing (meggering) and smooth running.

Preventive maintenance of LTtransformers, oil condition, checking oil in bushing, WTI/OTI monitoring etc.

Time to time monitoring of Neutral earthling of Power transformer (45 MVA).

Handling tripping and black-out condition of TG.

Scheduled maintenance with testing of Vacuum breaker, LT breaker, sensing and protective relays.

Knowledge of VFD and Soft starter operation and its maintenance.

LT/HT panel and busbar maintenance and testing.

Knowledge of protection of Transformer, Generator, and LT/HT motors.

Knowledge about operation and maintenance of DG set.

In all maintenance schedule importance given to CGT.(Cleaning, Greasing and Tightness).

Handled troubleshooting.

Documentation about daily, weekly and monthly maintenance schedule of various equipments.

Maintain daily report from operation to maintenance on excel sheet.

Project and Testing Activities:

132/11 KV PSS equipmenttesting.

Power Transformer testing done at site like BDV, polarity, turn ratio, insulation, winding resistance etc.

Inspection of HT motor (11 KV, 590KW) done successfully.

Responsible with HT & LT Motor Testing & Commissioning,Auxiliary Transformer Testing, performing erection, testing & commissioning ofEOT Crane(50/5)ton.

Erection & Testing of 1.6MVA & 2 MVA (11/.433KV) power transformer.

Erection,testing of BOP LT motors(415V) with different capacity.

Testing & maintenance of MCB,VCB,manual relays.

Commissioning & testing of LT panels of TG & BOP.

Managing project power distribution and maintenance of equipment.

Handling maintenance and monitoring of EOT Crane

Supervising tray erection,cable scheduling & laying to panel.

Successfully handled TG &BOP cable scheduling,testing & laying to panels.

Battery charger panel& UPS erection and testing.

Highlights:

Unique initiatives taken:

-Rearranged the HT panels and relocated by taking care of all Electrical issues to accommodate more panels making discussion with contractor and panel supplier.

-Changed the route of HT Bus bar (because of mechanical fouling), taking care all dimensions and make order for designing with consult to Bus bar supplier.

Aug’11 to Feb’13 Thermax Limited, Kharagpur Control& Instrumentation Engineer (O & M)

Assignments Handled:

Site: Bengal Energy Limited, Kharagpur, West Bengal

Capacity: 80 MW (2x40 MW) and 40 MW (running condition) and 40 MW (under project)

Boiler: 4x50 TPH (make CBL) @ 72 Kg/ cm

Period: Aug’11 to Feb’13

Responsibilities:

Served as Electrical Shift Engineer and handled electrical operations of the plant.

Experienced in electrical protection of HT(6.6KV),LT (415V)motors and LT transformers and their remedies.

Experience inhandlingelectrical protection of Generator, Transformer, Motors, and Switchgear etc.

Supervising preventive, predictive & breakdown maintenance of allelectrical Equipmentas per schedule.

Investigated and monitored the performance of Electrical and instrument equipment of all power plant

Protection and maintained LT Motors, auxiliaryTransformers, VFD, Panels, Relays, CT, PT &Breaker and other Electrical Equipment.

Routine check-up and monitoring various electrical and instrument equipment in the shift.

Handled generator tripping and blackout conditions

Hands-on experience in troubleshooting functions

Managed spare part related activities for ensuring a balance between projected and actual requirements

Controlledvalves and other process related instruments in the plant

Site: Sona Alloys Pvt. Ltd.,Lonand

Responsibilities:

Analyse and oversee the performance of electrical and instrument equipment of all power plant

Undertake protection and maintenance measures for LT Motors, Transformer, VFD, Soft Starter, Panels, Relays, CT, PT & Breaker and other Electrical Equipment

Controlled valves and other process related instruments in the plant

TRAINING/ COURSE

One year power plant operation and maintenance training from Jindal Power Limited(JPL)of 4x250 MWat Tamnar(C.G) from Aug 2010-Jul 2011.

3 Months Certified Automation Engineering Courses on PLC, SCADA, DCS, Instrumentation and Panel Designing from Prolific System and Pvt. Technologies Ltd., Bhubaneswar

SUMMER TRAINING

Underwent:

One Month Summer Training Course at Captive Power Plant (10x120) MW, National Aluminium Company Limited(NALCO),Angul in 2007.

One Month Summer Training Course at SAIL, Rourkela in 2008

ACADEMIC PROJECTS

Project Title: Automatic Temperature Control of Fan

Period: Nov’08 to May’09

Description: The fan automatically runs as the temperature rises above the setting point

Project Title: Automatic Street Light Control

Period: Feb’05 to Jul’05

Description: This involved an automatic glow during dawn or as per illumination decrease, resulting in nil manual operation requirements

EDUCATION

B.Tech. in Electrical & Electronics from Silicon Institute of Technology, Biju Pattnaik University of Technology,Odisha with CGPA 6.41/ 10 in 2009

Diploma in Electrical Engineering from U.G.I.E (Utkalmani Gopabandhu Institute of Engineering), Rourkela, S.C.T.E & V.T,Odisha in 2005 with 73.17%

10th from Chhend Housing Colony High School, Rourkela, B.S.E (Board of Secondary Education) in 1999 with 80.9%

EXTRAMURAL ENGAGEMEN

Secured 1st Position in Electrical Workshop Programme, conducted by Silicon Institute of Engineering, Bhubaneswar in 2008

PERSONAL DETAILS

Date of Birth: 27th July 1984

Languages Known: English, Hindi,Odia

Notice period: One month

Address: QR no-L/06, Chhend colony, Rourkela. Dist- Sundargarh (Odisha), Pin-769015

Marital Status: Unmarried



Contact this candidate