PROPOSED POSITION : SENIOR ENGINEER

PROFESSION : Civil Engineering

E-MAIL ID : ac2voy@r.postjobfree.com

TOTAL EXPERIENCE : 18 years (11 years in OMAN & 7 years in INDIA )

CONTACT MOBILE NO : +968-********, 95586979 & +91-957*******

SUMMARY OF WORK EXPERIENCE:

Having Eighteen Years Experience In Construction Sector, More than Seven and Half Years In Engineering Consultant and Ten and Half Years In Engineering Construction Company.

Working As a Site Inspector In Consultant In Sewerage Network Project and Worked As a Construction Engineer In Various Project Like Water Pipeline Networks, Railway Bridges,Culverts and Other Infrastructure Projects.

PROFESSIONAL AFFILIATIONS:

B.E- Civil Engineering – Vinayaka Missions University, Salem, Tamilnadu, India in 2008

Diploma in Civil Engineering, - Department of Technical Education, Tamilnadu, India in 1999

COMPUTER SOFTWARE SKILLS:

Microsoft Office

PROFESSIONAL EXPERIENCE:

M/s NJS CONSULTANTS ( OMAN ) LLC,

SITE INSPECTOR - AL AMERAT - MUSCAT ( OMAN ) JUNE 2016 to TILL DATE

Site Inspector in M/s NJS Consultants ( Oman ) llc For Al Amerat Waste Water Network Project. This Project is a Component part of the Muscat Wastewater Master Plan. Population growth in parts of Al Amerat and Al Hajir has been considerable over the past 10 years. As of December 2008 there were approximately 6800 developed properties out of a potential of more than 67000 proposed within the Al Amerat and Al Hajir Areas.

The Construction Works are Being Implemented through Four Contracts. Construction of Part of Al Amerat Northern Waste Water Network Project (A3). This Project Includes Construction of Main Trunk and Lateral Sewers 250 to 750 mm dia -56 km, 44.5 km Rider and House Connection Sewers, 1467 Number of Manholes, 1570 Number of Rider Chambers, 233.5 km of FO ducts, 1938 Number of FO Chambers, 13.3 km of TE lines and 2803 Number of Property Chambers. Project Cost : 12 million OMR.

Client: HAYA Water (Oman Wastewater Services Company S.A.O.C)

Contractor : Consolidated Contractors Co. Oman LLC (CCC)

M/s PARSONS INTERNATIONAL & COMPANY LLC, JANUARY 2010 to MAY 2016 ( 6 years )

SITE INSPECTOR - SALALAH ( OMAN ) FEBRUARY 2014 to MAY 2016

Site Inspector in M/s Parsons International & Company llc For GARZIZ waste water system Project at Salalah . This project involves providing a wastewater gravity networks with a lift station to connect the recently planned Garziz farm area to the existing collection and conveyance system of Salalah wastewater system.

The gravity sewers comprising the networks range in diameter from 200 to 500mm with approximate total length of 24 km of uPVC/HDPE pipes. There are about 440 gravity manholes constructed. The lift station has to operate in auto mode by using the existing SCADA system

Client : Salalah Sanitary Drainage Services Co. ( SSDC )

Contractor : Awfait Trading & Contracting Est. ( ATC )

M/s PARSONS INTERNATIONAL & COMPANY LLC,

SITE INSPECTOR - SOHAR ( OMAN ) DECEMBER 2012 to JANUARY 2014

Site Inspector in M/s Parsons International & Company llc For Construction of Collection Network and storage Facilities for Treated Industrial Effluent Project at Sohar port . This project Includes 12 km HDPE pipeline from 160 mm to 560 mm diameter Including Fibre optic cable duct, Storage steel tanks 2 nos of 1500 cu.m capacity and construction of valve chambers.

Client : Majis Industrial Services Co. SAOC ( MISC )

Contractor : Towell Infrastructures & Projects Company LLC ( TIPCO )

M/s PARSONS INTERNATIONAL & COMPANY LLC,

SITE INSPECTOR - MUSCAT ( OMAN ) JANUARY 2010 to NOVEMBER 2012

Site Inspector in M/s Parsons International & Company llc For Al Seeb Waste Water Project. The A’Seeb Project is a Major Element of the Muscat Wastewater Master Plan .This Project Covers Approximately 490 sq.km. One of the Main Reasons For the Scheme is to Engineer an Environmental Sustainable Solution to a Present day Problem Whereby Hundreds of Tankers are Used Daily Around the Area, To Empty the Septic Tanks and Holding Tanks that Presently Serve the Existing Communities .

The Construction Works are Being Implemented through Six Contracts. Construction of Part of Al khoudh Gravity Sewerage Networks plus Treated Effluent Transmission and Distribution Pipeline Systems. This Project Includes Construction of Main Sewers 200 to 800 mm dia, 137 km Main Sewers, 328 km Rider Connection Sewers, 2964 Number of Manholes, 14305 Number of Chambers, 164 km of FO ducts, 687 Number of FO Chambers, 27 km of TE lines and 7000 Number of Property Chambers. Project Cost : 64 million OMR.

Client: HAYA Water (Oman Wastewater Services Company S.A.O.C)

Contractor : Consolidated Contractors Co. Oman LLC (CCC)

MAIN RESPONSIBILITIES

Responsible For Monitoring Defined Construction Activities To Ensure Compliance With the Appropriate Specification.

Inspects Site Conditions To Ensure Suitability of the Designed Permanent Works, Provides All Necessary on-site Direction and Issues Site Instructions.

Review Design and Shop Drawings And Prepares Comments on the Submitted Drawings.

Maintain a Detailed Diary of the day’s work Activities, Issues and work approvals or rejection.

Acts Positively and Participates in All Health and Safety Issues at Site, As Required by the Resident Engineer and HSE engineer.

Monitor / Witness Concreting Works To Ensure that Concrete is Placed in Accordance with Concreting Procedure.

Report to the ARE / RE any Failure of the Contractor to Conform to Plans, Specifications, Workmanship and HSE Requirements.

Monitor / Witness Field Tests Such as hydro test, Leak Test, Mirror Test, Flow Test and Final Inspection of Site Clearance .

Issued NCR in the Event of the Non Conforming Work Done by Contractor, Reviewed and Recommend Approval of Corrective Action, and Monitor Site Implementation.

Interface with Client and Contractor QC Group for all on Site Inspections and /or Testing Requirements.

Monitor / Witness Laboratory Tests Such as Soil Compaction, Moisture Content, Graduation, Concrete Slump, Compressive Strength, Sieve Analysis Asphalt Coring.

Coordination with and Advice to Construction and other Internal Departments To Ensure QA/QC Requirements are Achieved.

M/s GALFAR ENGINEERING & CONTRACTING SAOG, NOVEMBER 2008 to OCTOBER 2009,

CONSTRUCTION ENGINEER – HARWEEL ( OMAN )

Construction Engineer in M/s Galfar Engineering & Contracting SAOG for Harweel Cluster Phase II Facilities Development Project. This EPC Project is being Executed as a Joint Venture with PETROFAC. The Project Involves Detailed Engineering, Procurement and Construction for a New Oil and Gas Processing Station and Associated Facilities Including Well Head Works, Oil and Gas Pipelines, Electrical Transmission lines etc.for a Capacity of 10,000 cu.m / day of Oil Production. Consultant: PETROFAC E & C INTERNATIONAL LTD, Client: PETROLEUM DEVELOPMENT OF OMAN ( PDO ), Project Cost: 256 million OMR .

M/s Nagarjuna Construction company Ltd. & partners LLC, SEPTEMBER 2006 to JULY 2008,

CIVIL ENGINEER – SOHAR ( OMAN )

Civil Engineer in M/s Nagarjuna Construction company Ltd.& partners LLC for Sohar water Network project (Phase I ) in Sultanate of Oman : Supply & Installation of 45 kms Asbestos Cement Pipeline with a dia. Ranging from 400 mm to 900 mm,295 kms of Secondary water distribution pipeline with a dia. Ranging from 100 mm to 300 mm, 281 kms of HDPE Pipeline with a dia. Ranging from 100 mm to 200 mm, Construction of Tanker Filling Stations, Valve Chambers, Building for Laboratory, Workshop, Office, Stores etc . Consultant: NJS & AL ABRAJ Consultants, Client – SOHAR DEVELOPMENT OFFICE, Diwan Royal Court, Sultanate of Oman. Project Cost: OMR 9.8 Million.

MAIN RESPONSIBILITIES

Supervising and Executing Four Groups of People Headed by the Supervisors and Foreman’s.

Supervise Site Preparation and Set All Requirements on Manpower, Materials, Tools and Equipments Needed on Operation for Earth work, Setting-out, Setting of Reinforcement Bars, Placing of Form Works, Inspection Based on Approved Plans and Specification, Concrete Pouring and Curing.

Prepare Monthly Outlooks of Manpower and Material Requirements.

Supervise Construction Proceeding as per Approved Plans, Drawings and Specifications.

Review Daily Work Schedule, Equipment and Manpower Requirements with Supervisor.

Review Construction Drawing and Resolve and Discrepancies with Engineer and/or the Consultant.

Monitor Safety Performance of all Personal on Site and Recommend Improvements of Safety Procedures.

Attend all Consultants' Inspections and Undertake Necessary Follow up.

M/s IVRCL Infrastructures and Projects Ltd, AUGUST 1999 to AUGUST 2006: (7 Years)

SITE ENGINEER / ASST. ENGINEER / JR. ENGINEER / TR. ENGINEER ( INDIA )

January 2005 to August 2006

Site Engineer in IVRCL Infrastructures and Projects Ltd. for the project of Broad Gauge Conversion from Trichy – Manamadurai, the projects includes PSC Box girder Bridges with Pile Foundation (Length 260m) 3 nos across the Vaigai, Sarugani and Manimuthar Rives, Precost box culverts (casting, launching and erection) 30 nos. (2m x 3m) and 100nos (1.2m x 1.2m), Client : Southern Railway (Construction) Project Cost: INR 19.60 Crores.

May 2004 to December 2004

Asst. Engineer in IVRCL Infrastructures and Projects Ltd. For the Highway Bridges Projects in Tiruvarur (Dist). The project includes 10 nos. Bridges in various locations at Tiruvarur (Dist), Length of Bridges 40m to 180m with Pile Foundation and open Foundation. Consultants: M/s STUP Consultants, Client: State Highways Dept. Project Cost: INR 11.00 Crores.

January 2003 to April 2004

Asst. Engineer in IVRCL Infrastructures and Projects Ltd. For the CHENNAI WATER SUPPLY AUGMENTATION PROJECT (NEW VEERANAM), Total Length of MS pipe 115 Km (1925 mm 85km and 1675 mm 30 Km), the project includes Pipe carrying Bridges 5 nos. (2 nos. of 300m length with well sinking foundation across at Killiyar River and Porur and 3 nos. of 60m length with open foundation) and 1 no. Laboratory Building, Consultants: M/s MECON Consultants, Client: CHENNAI METRO WATER SUPPLY AND SEWAGE BOARD. Project Cost: INR 335.0 Crores.

This project successfully completed within stipulated time

July 2001 to December 2002

Jr. Engineer in IVRCL Infrastructures and Projects Ltd. For the COMBINED WATER SUPPLY SCHEME PROJECT-VEDARANYAM, Total Length 110 km PSC pipes (Dia. 1100,900,800,600,300mm) 30 km Ac pipes (400,300,250,200mm), and 800 km PVC pipes (140,110,90,63mm), the project includes 1no. 20 L/L Multi structure ESR in Tiruvarur Town, 2 nos. 15 L/L ESR, 3 nos. 11 L/L Sump, 1 nos 5 L/L ESR, 100 nos. of ESR(10000,30000,60000,1L/L capacity) and Pipe carrying Bridges 60 nos. in the length of 30m to 150m, Client: TWAD BOARD. Project Cost: INR 105.00 Crores.

This project combined water supply in 3 Districts (Tanjore, Tiruvarur and Nagapatinam).

December 2000 to June 2001

Jr. Engineer in IVRCL Infrastructures and Projects Ltd. For the Combined Water supply scheme Project – tuticorin (Dist), the project includes 3 nos. of elevated service reservoir ( 1 no. of 20L/L and 2 nos. of 15 L/L capacity ), and 1 no. of 1 L/L sump. Client: TWAD BOARD, Project cost: INR 4 crores.

August 1999 to November 2000

Tr. Engineer in IVRCL Infrastructures and Projects Ltd. For the Rehabilitation of Irrigation Canal Project – Kanyakumari (Dist), the project includes a construction of 1 no Anaicut (Dam) 80m length, repairing of 5 nos. Anaicut, Bed lining in canals 30km, Retaining wall with R/R masonry 40000 cu.m, de-silting work. Client: Public works Department, Nagarcoil. Project Cost: INR 22.0 Crores.

MAIN RESPONSIBILITIES

Prepare Detailed Work program and establish material procurement schedule.

Handle and manipulate survey instruments like theodolite & auto level.

Prepare monthly outlooks of manpower and material requirements.

Supervise construction proceeding as per approved plans, drawings and specifications.

Review bar bending schedule.

Proposed Bridges pile and pile cap location, pier footing locations, pillar location marking in accuracy using Theodolite and Leveling instrument.

RA Bills follow up with concern Department Staff.

Benchmarks fixing and transferring in accuracy using Automatic Leveling Instrument.

Prepare the labour bill.

Review daily work schedule, Equipment and manpower requirements with Supervisor.

Co-ordination meetings with the Local Govt. Units / Department..

L-Section and Cross Section-wise, initial levels taking using Leveling Instrument.

PERSONNEL INFORMATION:

GENDER : Male

DATE OF BIRTH : 27th may 1981

MARITAL STATUS : Married

NATIONALITY : Indian

LANGUAGES KNOWN : English, Tamil, Hindi and Malayalam

DRIVING LICENSE : INDIA ( Light Vehicle )

OMAN ( Light Vehicle )

PERMANENT ADDRESS : # 38A, Ottai street, Vadasery, Nagarcoil, Kanyakumari (Dist), Tamilnadu, INDIA,

DECLARATION

I hereby that the particulars furnished above are true and correct to the best of my knowledge and belief.

A. KAVIKUMAR



Contact this candidate