ANNAPURNA NAND TIWARI
S/O- Shri Raj Niwas Tiwari,
B-1 Natraj homes HB Road,
Near indus town bhopal,402046
Email ID- *******@*****.**.**
Mobile No. 098********,096********
Job Objective:
Achievement of responsible positions with a professionally managed and progressive organization, along with the opportunity for growth in future.
To develop my skill and abilities though better experience and learning for the best.
Educational Qualification:
S.No.
Examination
Center
Board
Session
Result
1.
M.Tech(VLSI)
Trinity Inst.Of Tech. & Research Bhopal
R.G.P.V. Bhopal
2016
7.96 CGPA
2.
B.E. in Instrumentation & Control Engineering
Bansal College of Engg. Bhopal (M.P.)
R.G.P.V.Bhopal
2006
66.34
3.
H.Sec.S. Examination(10+2)
M.H.S.S. Rewa
M.P.
Bhopal
2002
73.60
4
H.S. Examination
M.H.S.S. Rewa
M.P. Bhopal
2000
64.30
Present Employment:
Working as an Asst.Manager (Electrical & Instrument) from june.2017 to Till Date in GLOBAL SPRITS LTD (Haryana organics) Samalkha Panipat Haryana.
TURBINE - 5 MW
MAKE - Triveni
BOILER - 25 & 14 TPH (Slope & gas & coal based)
MAKE - Seema boiler
SCADA - Siemens & allen bradely.
.
Company Profile
Haryana organics a unit of Globus sprits ltd . Globus sprits ltd is a major Alcohol producer in India. The Group has was set up in 1985 and since then,the Group has expanded manifold and is today,perhaps,the largest Alcohol conglomerate in India.The Group recorded a Turnover of around Rs. 2500 Crores in Year 2016-17.
Job Profile
. Work progress monitoring of Instrumentation activities for Commissioning of 135TPH AFBC
Boiler(ENMAS Make) & 30MW Steam Turbine(SHIN NIPPON Make).
. Hands on erection & commissioning of Instruments And DCS System(HONEYWELL) of
30 MW Power Plant In M/S VARDHMAN YARNS SATLAPUR MANDIDEEP(MP).
. Knowledge of Honeywell DCS System (Architecture, Study of logics, Updating of logics &
Graphics, Forcing of analog & Digital signals.)
. Planning and handling of modification work & spares.
. Instrumentation activities accomplished for Commissioning of Ash Handling, Coal Handling, HSD System, Raw Water/Feed Water System, DM Plant .
Installation of Field Instruments – Pressure, Flow, & Level Transmitters, Control Valves, Pressure & Level Switches etc.
Calibration & maintance of Instruments.like-RTD,Thermocouples,control valves,transmitter,pressure & level switch,Temp. Controller.
1) Installation of cable trays & JBs.
2)Cable laying, glanding & termination of multicore & branch cables.
3)Loop checking from field to DCS.
4) Signal & Power cable Interconnection.
5) Knowledge of interlocks and process used in power plant. Also hands on
Crosschecking of interlocks.
. Handled the problems related to Maintenance of instruments used in SCADA / PLC & DCS controlled automation plant like Control valves, On /off valves, mortised valve, pressure Transmitter, diff. pr. Transmitter, flow transmitter, level transmitter, temperature transmitters, temp indicating transmitter/ controller, ESV of TG,I/H converter, thermocouples, Rtds, Rf probes / controllers,level probes, Vibration probes, table top /on line pH- meters Pressure / vacuum transmitters, pressure/vacuum switch, etc.
. Correction of Cable & Interconnection schedules as per requirement & Implementation of same schedules.
>.Knowledge of Electrical distribution system & Protection system,UPS, HT & LT Power
System & related installation like:PCC&MCC,11KV & 33KV Switchyard,
Analog & Digital drive controlling,DC motor maintance,breakdown maintance,Transformer maintance.
Installation, testing & commissioning of sub-station
Operation & maintenance of sub-station, PCC, MCC, HT/LT 3-phase motors & to attend troubleshooting of mill & plant
Testing of 11kv H.T. cables, relays, H.T. switch gear, B.D.V & transformer oil, monitoring of DGA in transformer oil.
Operation & maintenance of LT/HT switch gear sub-station, H.T. overhead lines.
To attend trouble shooting in LT/HT electrical system.
To make planning for electrical project work or up gradation of Electrical LT/HT system as per management needs.
Co-ordination with MPSEB personnel for Board power resuming. As our factory is having 33kv, sub-station.
Installation, testing & commissioning of VFD.
Past Employment:
Worked as an Manager (Electrical & Instrument) power plant 5MW & Distillary from Aug.2016 to June. 2017 in Som group of company Bhopal.
Worked as an Asst.Executive Engineer(Instrument) in Power Plant 30MW.from Oct. 2010 to Aug. 2016 in VARDHMAN YARNS MANDIDEEP Bhopal.
WorKed as an Engineer(Instrument)Jaypee Balaji Cement Project Vijaywada(A.P)
A Unit Of (Jaypee GROUP) from Apr. 2010 to Sept. 2010. Project of 2*35 mw CFBC boiler which have 165 tph each capacity (Thysn krupp
Worked as an Engineer(Instrument) in Power Plant 30MW.from Apr. 2008 to March 2010.in VARDHMAN YARNS MANDIDEEP Bhopal.
Worked as an Assistant Engineer(Instrument) in Power Plant from Jan. 2007 to Apr. 2008 in GODAWARI POWER & ISPAT LTD. SILTARA Raipur.1X30MW, 10X3MW,25X1MW.
Personal Information:
Father’s Name : Shri Raj Niwas Tiwari
Date of Birth : 02/07/1985
Marital Status : Married
Nationality : Indian
Category : General
Languages known : English, Hindi,
Declaration:
I hereby declare that the above information are totally authentic and to the best of my knowledge.
Date : (Annapurna Nand Tiwari)