Post Job Free
Sign in

Construction Manager

Location:
Mint Hill, NC
Posted:
October 11, 2017

Contact this candidate

Resume:

TODD J. BARNES

***********@*******.***

Mobile: 704-***-****

EDUCATION

Wentworth Institute of Technology, Boston, MA: Bachelor of Science in Engineering Technology with a major in Building Construction, with highest honors, 1984.

Dean Junior College, Franklin, MA: Associates Degree in Applied Science Building Construction. Phi Theta Kappa, Dean’s List, with honors, 1981.

LICENSES and CERTIFICATES

OSHA 10, 30 Certified Training Program

Red Cross First Aid, CPR, and AED Certified

Arizona State Mine Inspector

Georgia Erosion

North Carolina Erosion

Tennessee Erosion

LEED Training

Arial Lift Operator

Ramset Operator’s License

SCDL Class A CDL Truck License

EXPERIENCE

2012 -2016 SITE MANAGER/CONSTRUCTION SUPERINTENDENT/LINE INSPECTOR

AECOM/URS Corporation

Inspects foundation, structural, stringing, and sagging activities to ensure compliance with engineering plans and specifications.

Oversees daily field activities and ensure that construction is safely accomplished in accordance with project guidelines, specifications, environmental requirements, permitting, etc. and industry best practices.

Proactively mitigates day-to-day issues as they arise throughout line construction, and assure safety, construction, and permitting are in compliance with client’s specifications.

Works with the client’s project engineering team for field and engineering support on technical issues during project construction.

Maintains daily and weekly progress reporting for all field activities and work with contractors to maintain overall schedule requirements:

Daily completion reports

Concrete reports review

Daily inspection of drilling, concrete placement, structure install, wire pulling, and install

Daily observation and recording contractors activities

Daily safety observation of contractors

NRO requests from client's dispatcher

Throughout the project, works closely with the Project Manager and various contractor teams to assure materials acquisition does not limit construction progress.

PROJECTS

2015-2017

Illinois Rivers Project

Meredosia to Ipava River crossing (MIX) - $30M

Meredosia to Herleman River crossing (MHX) - $30M

Kansas West Substation - $33M

Austin to Meredosia T-Line

Meredosia to Ipava T-Line

Client: Ameren Illinois

2013-2015

Arizona Public Service (APS) Hang 2 (Hassayampa to North Gila)

Phoenix to Yuma, AZ - $200M

Client: Arizona Public Service

2012-2013

Electric Transmission Texas (ETT) Competitive Renewable Energy Zone

(CREZ) joint venture with AEP

Edith Clarke-Cottonwood T-Line Installation

Edith Clarke-Riley Line T-Line Installation

Tesla-Edith Clarke T-Line Installation

Crowell, Texas - $1.4B Program

Client: American Electric Power

2007 to 2011 FIELD GENERAL SUPERINTENDANT

Southside Constructors, Inc

Charlotte, NC

• Met construction management operational standards by contributing to strategic plans and forward thinking

• Created value to the customer by developing strong working relationships; proactive thinking and actions; implementing production, productivity, quality, and customer-service standards; problem solving and identifying continual improvements

• Assisted with the creation of construction procedures to guide project management staff in meeting project goals and milestones; monitored and evaluated schedules; identified variances; tracked and followed up, and implemented corrective actions

• Assisted in preparation of construction monthly progress reports for presentations at team and executive session meetings by collecting, analyzing, and summarizing construction data and trends

• Worked with the client, client representatives, staff and management in a collaborative manner within a context of good human relations

• Assisted in the coordination of the design review process and assisted the Project Manager during the Design and Pre-construction phases as needed and maintained the current Design Review Comment log

• Assured all comments were addressed/resolved, including: Design Reviews and Constructability Reviews

• Managed the RFI and submittal review process. Screened RFIs for errors and inconsistencies

• Maintained project control logs including: Submittal, RFIs, PCOs, COs, Client Requested Changes, Payments, Deficiency Notices, etc. on a weekly basis

• Maintained current contract plans and specifications. Ensured RFIs were posted and current for the Inspectors’ use

• Maintained record drawings and as-builts

• Assisted in coordinating field activities with Government Inspectors, including: coordinating field activities, observed work in the field and assisted the Inspectors as necessary, and prepare and managed Deficiency Notices

• Developed Client estimates for potential changes and provided evaluation of Contractor proposals when requested

• Reviewed and provided comments on Contractor’s monthly schedule updates

• Managed site access and traffic management

• Managed Punch-list coordination and Client activities

• Assisted in the coordination of start-up and contract closeout activities

PROJECTS

2009-2011

Alamance-Burlington Career Tech Center-Alamance School System

Burlington, NC. - $9M

2009

Highfalls Elementary School - Moore County School System

Highfalls, NC - $2M

2007-2009

New Birth Missionary Baptist Church

Huntersville, NC - $21M

2007 COMMERICIAL SUPERINTENDANT

Catamount Constructors, Inc

Atlanta, GA

PROJECTS

2007

Melaver Residence - Restoration of 150 year old townhome to LEED standards

Savannah, GA - $1.9M

EODT - 2 Story Office Building

Knoxville, TN - $15M

2001 to 2006 COMMERCIAL SUPERINTENDANT

Centex Construction Company

Charlotte, NC

PROJECTS

2006

BB&T

Kendall Town Center

Jacksonville, FL - $1.7M

Beach Blvd

Jacksonville, FL - $1.5M

2005

Lake Point Corporate Office Building

Charlotte, NC - $9M

Duke Energy

Power Building

Charlotte, NC - $.5M

Energy Center

Charlotte, NC - $.5M

South Tryon Tower

Charlotte, NC - $1.5M

Wachovia, Bell South Tower 14th Floor

Charlotte, NC- $.9M

2003-2004

Bank of America

Eastfield Village

Charlotte, NC - $2M

Center City

Charlotte, NC - $1.9M

Knightdale, NC - $1.6M

Eldridge Lake

Houston, TX - $1.4M

2001-2003

Alexander County Correctional Facility

Taylorsville, NC - $85M

1999 to 2001 DESIGNER/CUSTOM INSTALLER

Great Kitchens and Bath

Winston Salem/Greensboro, NC

1992 to 1999 SUPERVISOR/PROJECT ENGINEER

Thomas Harris Building & Design

Winston Salem, NC

1989 to 2003 GENERAL CONTRACTOR

Todd Barnes Construction

Winston Salem, NC

1985 to 1990 PROJECT ENGINEER

Vertec Corporation

Brockton, MA

Reviewed project plans and proposals, then worked with management to develop project objectives. Identified project responsibilities by determining the phases and elements of the project. Calculated time frames and sequenced the stages of the project.

Prepared and distributed a description and timeline of the project.

Studied product design, customer requirements performance standards, then determined project specifications. Presented cost estimates and performance standards. Conducted tests assuring safe and satisfactory product performance.

Reviewed contractor bids; interviewed and assigned personnel to specific phases and elements of the project. Through project coordination meetings and other forms of communication, oversaw and coordinated the technical aspects of the project.

Prepared status reports and regularly monitored budgets, contractors and schedules. Allocated project resources appropriately; approved expenditures; employee contractor contracts. Kept an accurate record and electronic data base of all elements of the projects.

Presented procedures, rules and regulations to those involved in the project; maintained a safe, clean and productive environment through enforcing procedures. Maintained project integrity and reputation through compliance with state and federal regulations.

PROJECTS

1990

Vertec Corporation Corporate Offices

Brockton, MA - $3.5M

1989

The Old Hyde Shoe Factory

Cambridge, MA - $2.2M

1988

Boston University

Boston, MA - $3M

Nabisco Candy Mfg

Cambridge, MA - $1.2M

1987

Massachusetts Institute of Technology (MIT)

Cambridge, MA - $1.5M

1986

Green Bay Development - Corporate Offices

Boston, MA - $5M

Green Bay Development Corporation - Fields Corner Historical District - $1.9M

AWARDS

2004 ABC MERIT AWARD - ZERO PUNCH LIST

First NC recipient awarded

Bank of America, Center City

Charlotte, NC

SKILLS

Estimating

Scheduling

Engineering

Total Station

Software

Microsoft Office: Word, Excel, Outlook, Project

Aconex Project Management

Lotus: Notes, Email

Timberline

Construction Manager

Equipment

Heavy Equipment Operator

Forklift

Lull

Excavator

Backhoe

Front end loader

Community

Salvation Army – Soup Kitchen

Goodwill – Donation Sorter

Habitat for Humanity - New home construction

UMC Building Missions - Hurricane Disaster Reconstructions in Florida and NC



Contact this candidate