Sukadi
Phone: 081*********
Email: *********@*****.***
Birthdate/Place: Kebumen, July 16, 1991
Domicile : Jl Raya Kopo Gg Lapang 1
Kec Bojongloa kaler Kota Bandung 40232
EDUCATION
Politeknik Negeri Bandung, Indonesia
Instrument & Control - Electronic Engineering
Cumulative GPA : 2.93 / 4.0
Final Thesis : Design And Implementation Of Measuring Eyes Defects Myopia And Hipermetropi Using Two Lens Method Based On ATMEGA 328P With HMI Display
Senior High School : Teknik Elektronika Audio Video - SMK Negeri 2 Kota Bogor Periode : 2006 – 2009
INTERNSHIP EXPERIENCE
PT SCADA PRIMA CIPTA{July 16, 2012. – August 18, 2012} Configure & Simulate Flow Computer Bristol Babcock for Gas Flow in pipes using Aga3 Standard.
LEADER EXPERIENCE
Himpunan MahasiswaElektronika : Chairman of the Departement Internal HME (2010
– 2011)
Unit Kegiatan Mahasiswa Taekwondo : Chairman of The UKM Taekwondo (2010 – 2011)
Taekwondo Polban Kyorugi Championship : Chairman of the Division dana Usaha PKC Polban (2013)
SKILL AND TRAINING
Politeknik Negeri Bandung : Participant in seminar Nasional “Ketahanan Lingkungan Hidup Dengan Penggunaan Energi Alternatif” (2009)
Himpunan Mahasiswa jurusan Elektro : Participant in seminar “ Moving Forward with SCADA” (2011)
Maranatha Cristian University : Participan in Seminar “Arduino Hacking”(2013)
PT Advantech International: Participan in Workshop “Advantech Automation Device And Scada Software Web Access solutions Workshop” (2015)
Indosafe Pratama : Participan in Training “Sea Survival” (2016)
PT Caleb Technology : Assistance in Training DCS Experion LX (2016)
Honeywell : Assistance in Training DCS Experion PKS “Husky Cnooc Project”
(2017)
PHE WMO : Participan in Training “Permite To Work” (2016)
Honeywell : Participan in Seminar & Workshop “Control Edge PLC” (2017)
Honeywell : Particioan in Seminar “Industrial Security and Fire” (2017) ACHIEVEMENT AND AWARDS
Ketua Divisi Sumber Daya Manusia Himpunan Mahasiswa Elektro Jurusan Teknik Elektro
OTHER QUALIFICATION
Familiar With Auto Cad
Familiar With Oil & Gas Activities
Having Good Ability In Computer Literacy
Familiar With Program PLC (Honeywell, Rockwell)
Familiar With HMI Programing (Kinco, Rockwell, Honeywell) Familiar Created Project Calculation Sheet
Familiar with Design Grafis
EMPLOYEMENT RECORD
EMPLOYER : PT LG INNOTEK INDONESIA
Periode : Sept 25, 2013 – Sept 16, 2014.
Position Held : Supervisor RF LAB
Project : Tuner Area Brazil & Indonesia
a) Design Circuit & Layout PCB
b) Make sample tuner for area Brazil & Indonesia
c) Measuring analyse tuner for compare reliability d) Responsible for planning, coordination for test run. e) Monitoring Test Run in line production
f) Presentation After Final Project
EMPLYOER : PT CALEB TECHNOLOGY
Priode : March 10, 2014 – Present
Position Held : Project Engineer
1. Project : F&G Dulang Angsi - Petronas Carigali/ Dwisolar Sdn Bhd Priode : (March 2015)
Responsibility & Experience:
a. Kick of meeting with Dwisolar Sdn Bhd at Malaysia b. Preparation document Vendor list
c. Making engineering document
d. Making document drawing GA, Architecture, IO Termination, Power Consumption, etc)
e. Making document FAT procedure & report after internal test. f. Reporting & documentation
g. Support FAT at Selangor Malaysia
h. Compilation report
2. Project : F&G Tapis – Petronas Carigali/Dwisolar Sdn Bhd Priode : March 2015
Responsibility & Experience:
a. Kick of meeting with Dwisolar Sdn Bhd at Malaysia b. Preparation Document Vendor list
c. Making engineering document
d. Making document drawing GA, Architecture, IO Termination, Power Consumption, etc)
e. Making document FAT procedure & report after internal test. f. Reporting & documentation
g. Support FAT at Selangor Malaysia
h. Compilation report
3. Project : Retrofit F&G PHE WMO – Wifgasindo Dinamika /PHE WMO Priode : July 2016
Responsibility & Experience:
a. Preparation Document drawing ( GA, architecture, Etc). b. Compare IO list before input to FT View.
c. Make layout area as per document General drawing. d. Internal Test “interconnection between FT Veiw and PLC”. e. FAT HMI display “FT View” in Wifgas.
f. Clear punch list.
g. Writing report & Documentation.
4. Project : ESD Top Side Jangkrik Complex – Honeywell/Eni Saipem. Priode : August, 2014 – Okt, 2015
Responsibility & experience:
a. Make Document IO List
b. Comparison between IO list and Cable block diagram c. Make logic as per document IO list, Cause & effect and Alaram List. d. Make logic for Loop Test
e. FAT ESD By logic
f. FAT ESD By Cause & Effect
g. Clear punch list
5. Project : Coal handling System – Adhi karya/ PLN Persero Priode : Sept 10, 2016 – Des 22, 2016
Responsibility & Experience:
a. Program Mimic Panel for monitoring on panel system b. Clearing Puchlist as per FAT
Responsibility & Experience:
a. Asist Startup WHP
b. Troubleshooting & Modified Logic & Backup
6. Project : Huscy Cnooc Limited Project
Priode : May 1, 2017 – May 7, 2017
Responsibility & Experience:
a. Asist Calibration Fire & Gas ( Gas detector, Flame Detector & Smoke Detector)
b. Making Procedure Calibration
c. Making Progress Complation Report
8. Project : Training DCS Experion LX C300
Priode : July 2016
Status : 1’st Launching by PT Caleb Technology (Free for Public) Responsibility & Experience
a. Prepare schedule training
b. Making PCS training
c. Publish Brochure
d. Prepare handbook training & module practice
e. Prepare Tools & Module Training
e. Setup Laptop & Software Training
f. Evaluation
9. Project : Training Safety Manager Honeywell system Priode : August 2016
Status : Trainer PT Caleb Tehcnlogy for ( Internal Member Caleb) Responsibility & Experince
a. Prepare schedule SM training
b. Prepare handbook training & module practice
c. Setup laptop & software training
d. Evaluation
10. Project : Kalibration Alat Meter – PHE WMO
Priode : June 2017
Responsibility & Experience:
a. Pickup on ORF Pertamina
b. Asist Calibration Turbin Meter on Direktorat Metrologi Bandung. c. Deliverd to the metter already calibration
c. Reporting
I Declarae the detail stated to be true and complete Bandung, June 2017
Yours Faithfully,
Sukadi
7. Project : Fire & Gas Instalation – PHE WMO CPP-5 Priode : Nov 25, 2016 – May 24, 2017