Post Job Free

Resume

Sign in

Pre-Construction Manager, Cheif Estimator, Senior Estimator

Location:
Grand Rapids, MI
Posted:
September 21, 2017

Contact this candidate

Resume:

Timothy J. Thome

**** **** **. **, *****, MI 616-***-**** ac2ez7@r.postjobfree.com

Timothy J. Thome

**** **** **. **, ****, MI 49302 616-***-**** ac2ez7@r.postjobfree.com Objective To use and share my extensive knowledge of the commercial construction industry, especially the estimating process, in the Construction Management, Design-Build and Hard Bid delivery methods with a firm committed to excellence in the marketplace and to the professional growth and development of its employees. Experience Project Planning Leader

February 2016 – March 2017: The Christman Company, Grand Rapids, MI 49504

I was responsible for the Pre-Construction Phase of projects assigned to me: Assigned tasks to other members of the Project Planning Group; Provided Conceptual, Schematic Design and Design Development Budgets; Analyzed different Building Systems during the design phase; Provided Value Engineering Options; and Provided On-Screen Take-Off, Unit Pricing and Project Cost Summaries. Projects consisted of Health Care, K-12, Higher Education, Office, Municipal and Mixed-Use Facilities ($2.5M to $150M projects). Chief Estimator

September 2011 – January 2016: KircoManix Construction, Troy, MI 48084

I was responsible for all estimating for the company: Develop Feasibility/Conceptual, Schematic Design and Design Development Budgets; Manage Design Process from Schematic Design through Permitting/ Construction Documents throughout the Design/Build Process; Provide Budget Control throughout the Design/Build Process; Solicit and Evaluate Bids; Provide Quantity Surveys; Prepare Bid Analysis for Client Review; and Prepare Proposals and Bid Forms. The Department’s annual construction volume has increased from $15M to $45M during my tenure. Projects consisted of Office, Technical, Retail, Manufacturing, Industrial, Distribution and Financial facilities

($100K to $30M projects).

Pre-Construction Manager/Chief Estimator

October 2007 – February 2011: Bouma Construction, Grand Rapids, MI 49508

As Pre-Construction Manager, I was responsible for Project Development of Design-Build Projects:

Developed Feasibility/Conceptual Budgets; Solicited/Awarded Consultant Contracts; Managed Design Process from Schematic Design to Design Development to Permitting/Construction Documents; Provided Pre-Construction Reporting to Clients; Provided Budget Control throughout the Design Process; Directed Subcontractor Pre-Qualification Process; Completed Quantity Surveys; Solicited Bids; Awarded Subcontractor Contracts and Supplier Purchase Orders; and Prepared Guaranteed Maximum Price Proposals. Projects consisted of Educational, Retail, Health Care and Hotel facilities ($1M to $30M projects).

As Chief Estimator, I was responsible for Managing the Pre-Construction Department and was a member of the Management Team: Directed Department’s Standardization Process; Met Weekly with Pre- Construction Manager’s; Held Bi-Weekly Department Meetings; Assigned Projects; Reviewed Estimates; Scheduled and Attended Guaranteed Maximum Price Proposal Meetings; and Assisted with Business Development. Timothy J. Thome

7980 96th St. SE, 49302, MI 616-***-**** ac2ez7@r.postjobfree.com Timothy J. Thome

7980 96th St. SE, Alto, MI 49302 616-***-**** ac2ez7@r.postjobfree.com Experience

(Continued) Vice President - Estimating

2001 - 2007: Campbell/Manix Inc., Southfield, MI

I was responsible for Estimating, Managing the Estimating Department, and was a member of the Executive and ISO Steering Committees: Held Weekly Department Meetings; Assigned Projects; Reviewed Estimates; Assisted with Business Planning; Participated in Sales Presentations; Developed Conceptual Budgets; Managed Design Process from Schematic Design to Design Development to Permitting/Construction Documents; Provided Budget Control throughout the Design/Build Process; Solicited Bids and Awarded Sub- contractor Contracts and Supplier Purchase Orders; Qualified Subcontractors and Suppliers; and Prepared Proposals and Bid Forms. Projects consisted of Office, Technical, Industrial, Distribution, Auto Dealership, Financial Institution, Municipal, Recreational, Church, Hotel and Residential facilities. Major Projects: Delphi World Headquarters ($32M), LDM Corporate Headquarters ($20M), Skylofts of Royal Oak ($17M) and Liberty Lofts ($12M). Chief Estimator

1998 - 2001: Campbell/Manix Inc., Southfield, MI

I was responsible for Estimating, Managing the Estimating Department, and was a member of the Executive Committee (Duties were the same as indicated above). Estimator

1993 - 1998: Campbell/Manix Inc., Southfield, MI

I was responsible for Estimating (Duties were the same as indicated above except for the 1st four items listed).

Estimator

1986 - 1993: R.E. Dailey Company (Perini Corporation), Southfield, MI

I was responsible for assisting the Senior Estimators and for estimating projects assigned to me. I was also involved in the Training Program: Completed Quantity Surveys; Solicited and Analyzed Bids; Awarded Subcontractor Contracts and Supplier Purchase Orders; Worked in Project Management Department as a Project Engineer (expedited, reviewed and processed shop drawings and submittals; reviewed claims; and ran subcontractor meetings at the jobsite); and Worked in the Operations Department as a Field Engineer on a High-Rise Office Building. Projects consisted of Office, Retail, Educational, Correctional, Hospital, and Hotel facilities

($100k to $215M projects).

Estimator

April 1985 – August 1986: Southern Building Group, Dallas, TX Estimator

April 1983 - April 1985: J.N. Kent Construction Company, Dallas, TX Education College of Engineering, University of Michigan, Ann Arbor

BSCE - Construction Option (Graduated May 1982)



Contact this candidate