Mr. AYAZ MAHMOOD KHAN
ELECTRICAL & INSTRUMENT ENGINEER
+966-**-*******, +92-333*******
Email : ac2d10@r.postjobfree.com
OBJECTIVE:
To join the organization where my skills get invested in an innovative & flexible way so I can strengthen the company
Goals and objectives, along with my personal growth and development.
CAREER PROFILE:
12 Years of diversified experience in Inspections, Instrumentation, Maintenance, Troubleshooting, Inspection of Instruments
And Gauges. Calibration, Testing of Instruments and Gauges in Process Industries and Large Scale Power Plants.
Assistance in calibration, inspection & commissioning of oil & gas field, petrochemical industry and cement plant.
During 12 years of experience, acquire thorough knowledge of process control Instrumentation maintenance/installation /
Inspection/Calibration, and troubleshooting that operating on different control Systems (PLC & DCS, ESD, MMS and Relay Logic,
System Earthing, CCTV, Fire and Gas Instruments.
Having good knowledge and experience for installation of E&I power distribution board panels, DCS, ESD and F&G panels,
Plant Earthing System, instrumentation and control and Fire and Gas cabling system.
Project execution, pre-commissioning & commissioning activities.
Developed cohesive project execution/ management teams, planned and safely executed projects ahead of schedules.
Leading approach and understanding of P&ID’s, ILD’s, Hookup Drawings, GA Drawings, Cable Schedule, I/O List,
Logic Diagrams, Alarm Schedule, Cable Block Diagram, & Loop Philosophies.
Experienced in preparation of Method Statement and Procedures under the guidelines of applicable codes and standards as per
Project scope of work.
Having good knowledge and operating skills of different computer programs like Internet explorer and MS Office
(MS Excel, MS Words, MS Outlook, & Paint Shop,).
SPECIALIST ENGINEER: Working in SADARA CHEMICAL PLANT JUBAIL KSA from 16-02-2016
To till data
JOB RESPONSIBILTIES: Walk down, Mcpn, Loop check and punch closing activities and pre-sis validation
And final sis validation.
LIFE CRITICAL TRAINING
1.SAFE WORK PERMIT &CRITICAL SAFETY TAG
2.EQUIPMENT OPENING &LINE BREAKING
3.LOCK OUT /TAG OUT (LOTO)
4.HOT WORKS
5.HIGH PRESSURE CLEANING
6.WORKING AT HEIGHTS
ELECTRICAL & INSTRUMENT ENGINEER
Worked in Seder Group Saudi Arabia from 20-11-2014 to 19-11-2015
Installation, erection, testing, commissioning and maintenance of all equipments of BMS (Building Management system)
SUPERVISOR E & I:
Turbine, water treatment plant, waste water, Heat Recovery Steam Generator (HRSG), Boilers.
Worked at Waste Heat Recovery Power Plant 18 MW (KAWASAKI) Maple Leaf Company
From 05-02-2010 to 12-06-2014
a.Worked at DCS system Yokogawa Centum CS 3000.
b.Improvising of international QA/QC standards at the work site
c.Installation, Inspection and loop Testing of instrument
d.Worked on Nanjing steam turbine and all affiliated systems.
e.Troubleshooting at AVR, DEH, GCP panels.
f.Inspection, Installation of Embedded PVC Conduit for Telecom system
g.Installation,Inspection of cable Tray as per NEMA Std
h.Inspection, Installation and calibration of instrument and gauges
i.Installation, Inspection of Telecom system
j.Installation, Inspection and Functional Test of Fire alarm system
Installation, Calibration, Loop testing, commissioning & Pre-commissioning and start up activity of Steam
INSTRUMENT TECHNICIAN
Worked in Dubai Electricity & Water Authority in Dubai
From 13-04-2009 to 05-01-2010.
Worked at Alstom turbine system (250 MW) and auxiliary boiler of capacity 480 ton.
Worked at DCS system o
Implementation of Layout Drawings.
Implementation Piping & Instrument, process Hook-up and electrical hook up drawings
Meggering and testing of instrument cables.
Solving of troubleshooting problems at JBs and Panel connections.
E & I ENGINEER:
Worked in National Cement Company Yemen with KHD
From 10-07-2008 to 10-01-2009
Installation, Inspection, Calibration and Loop testing
Commissioning & Pre-commissioning and start up activity of crasher, reclaimer, stacker, raw mill, kiln,
Cooler and cement mill
Cement mill of Cement plant (3400 TPD).
Worked on weigh feeders (Shank, Dosax, Dosimax and Haslar)
Worked on PLCs system Siemen S7-200.
INSTRUMENT SUPERVISOR:
Worked in Maple Leaf Cement Factory Ltd. (FLsMidth)
From 19th May 2005 to 10th May 2008
Installation, Calibration, Loop testing, commissioning & Pre-commissioning and start up activity of
Cement plant (500 TPD). Also worked on MODICON Tele-mechanic 24VDC system.
INSTRUMENT TECHNICIAN:
Worked in NFC Institute of Engineering Tech Multan
From 2003 to 2004
Installation, Calibration, Loop testing, Commissioning and trouble shooting of all types of Pressure, Level, Temperature,
Flow and PH conductivity (ORP) at PAK- Arab Fertilizer (NFC Multan).
INSTRUMENT TECHNICIAN:
Worked in Siemens PVT Ltd
From 15/03/2001 to 18/11/2003
Installation, Calibration, Loop Testing, Pre- Commissioning at Qadir pur Oil Field.
Assistance in Commissioning of Instruments and Actuators.
Assistance in Commissioning of Control Panels.
Implementation Piping & Instrument, process Hook-up and electrical hook up drawings
Implementation of Layout Drawings.
Worked on DCS of YOKOGAWA.
Installation of DCS system and marshalling cabinets.
Cold Loop testing, hot loop testing of Instruments.
Finding out the locations for instrument installation from Piping General Arrangement drawings.
Meggering and testing of instrument cables.
Solving of troubleshooting problems at JB and Panel connections.
Finding out the stanchion locations and installation of cable routing for instruments.
Supervision of cable laying and cable termination.
Supervision of instrument installation.
Calculation of Installation material for instruments from typical installation drawings.
Implementation of typical installation drawings.
Implementation of termination drawings.
To prepare “As built” drawings for cable trays.
Managing documents such as Technical Reports, Daily Progress, Monthly invoices, QC protocols etc.
INSTRUMENT LIST:
CONTROL VALVES:
Moore, Maxon, Kanetrol, Hytork, ABB
Transducer & Transmitter:
CONTROLLER:
Fisher, Yokogawa, Honeywell.
CONVERTER:
More Industries, Foxboro, ABB.
POSITIONERS:
Fisher, Automax, ITT, Hitork, Moor.
PLC & DCS
Ladder logic of PROSAFE YOKOGAWA, Honeywell & Siemens
Yokogawa Centum CS3000, SIEMENS (S7 & S5), MODICON
Calibration of Instruments:
HHT Yokogawa, ABB, Rosemount 375.
Pressure Calibrator Druck Model DPI 160, DPI 104, Beamex Mc2-11558
Processor Calibrator Yokogawa Model CA 100
Multifunction Calibrator Fluke 925
Temperature Calibrator Fluke9141
QUALIFICATION:
Major
Institution
Tenure
B-Tech (Honors) Electronics
Preston University Kohat Pakistan
2012
B-Tech(Pass) Electronics
Preston University Kohat Pakistan
2007
Diploma of Associate Engineer in Electronics Technology
Govt Poly Technical Institute Sargodha Pakistan. (PBTE)
1996 to 1999
SSC Science
Physics, Math, Chemistry English
Govt Higher Secondary School Daud khel Mianwali Pakistan
1996
PERSONAL DATA:
Father’s Name Abdul Sattar Khan
Date of Birth 30-12-1980
Nationality Pakistani
CNIC# 38302-1152107-9
Passport# WL4101072
Origen Address Mohallah Lamay Khel Village & P/O Daud Khel
District Mianwali Punjab, Pakistan