Resume

Sign in

Power Plant Safety

Location:
Birmingham, Alabama, United States
Posted:
November 12, 2017

Contact this candidate

Professional Summary

Skills

Work History

RONALD KING

**** **** ****** ******, **********, Alabama 35218 (H) (205) ***.**** (C) (205) ***.**** ac292j@r.postjobfree.com

Construction Safety - observing construction site activities, verifying required safety documents and checking for potential safety issues. Remaining well-versed in safety standards. Diligent when it comes to enforcing regulations and responding to reported construction site safety concerns expressed by either the general public or on-site workers. MS Office proficiency

Eye for detail

Independent worker

Assertive communicator

Pipefitter 01/2008 to 01/2017

Local Union 91 Plumbers and Pipefitters - Birmingham Alabama – Birmingham, Alabama I have worked in construction for the last 9 years and have traveled to many different jobs throughout the USA. Building Trades Journeyman Pipefitter 01/2008 to 01/2010 Miller Steam Plant Scrubber Project - Southern Company – Quinton, Alabama Assembled a large scrubber which removed, or scrubbed emissions from the exhaust of coal-fired power plant. Cutting, Grinding, welding, pipefitting, blueprint reading. Experienced in lock out tag out, Confined Space, fall arrest systems and PPE. Continuous on the job training in working safe and being my Brother\'s keeper. Worked with certified pipe welders by providing accurate pipe preparation and fitting. Pipefitter Foreman 01/2010 to 01/2011

University of Alabama Women\'s and Infant\'s Center Hospital – Birmingham, Alabama Interpreted blueprints to determine locations, quantities and sizes of materials required. Trained and supervised incoming employees.

Read blueprints to determine appropriate materials and procedures for each project. Performed regular job site observations to provide direction for all general contractor personnel. Conducted routine quality audits to ensure that work was progressing per the specifications and initiated corrective actions.

Building Trades Journeyman Pipefitter 02/2011 to 08/2012 Southern Company/Alabama Power Gorgas Steam Power Plant – Parrish, Alabama Continuous on the job training in working safe and being my Brother\'s keeper. Installed valves, hangers, supports and flanges inside piping systems. Assembled and installed a variety of valves and fittings. Read blueprints to determine appropriate materials and procedures for each project. Education

Independently worked on projects, while offering process coordination and cooperation with other teams. Building Trades Journeyman Pipefitter 10/2013 to 12/2013 United States Steel Mill Project (US STEEL) – Fairfield, Alabama Selected the type and size of piping required for each project. Repaired steam, drainage and sewer lines.

Offered guidance and training to junior team members. Eliminated risks by correctly identifying potential safety hazards. Read blueprints to determine appropriate materials and procedures for each project. Safety Team/Pipefitter Foreman 07/2014 to 12/2015

Kemper County Mississippi Energy Facility – Kemper County, Mississippi Addressed all personnel issues promptly and professionally. Drove daily safe work activities with effective communication and leadership. Completed required safety training programs for OSHA 30. Recommended and executed safety improvements for safe work practices on job site. Verified that all workers correctly wore the required PPE to perform job tasks. CVIS/Craft Voice in Safety/Pipefitter 12/2015 to 08/2016 Kiewit Construction Co – Paradise, Kentucky

.

Performed initial safety assessment, reported back to supervisor to begin research process. Monitor and coach mentees on a daily basis while performing regularly scheduled work. Worked directly with managersto achieve positive results in craft safety. Managed job site hazards by accurately locating biohazards, low-grade radiation and chemicals. Obtained precise results by performing accurate hydrotesting. Offered guidance and training to junior team members. Repaired steam, drainage and sewer lines.

Safety Team/Pipefitter 08/2016 to Current

Plant Vogtle Nuclear Power Plant - Bechtel- Southern Company – Waynesboro, Georgia Collaborated with engineers at the new product introduction phase to develop and verify design changes. Completed projects by effectively applying engineering, technical and maintenance procedures. Followed up on nuclear packages and resolved outstanding problems with design, Loaded and unloaded building materials used for construction. Consistently assumed additional responsibilities and worked extended hours to meet project deadlines. Conducted hydrostatic water testing.

Conducted weekly safety walk downs on site with site personnel and craft. Reported to management and site safety officers in meetings, which facilitated stronger communication and the ability to resolve critical safety issues. Safely operated standard and aerial lift vehicles. Installed pipe systems and plumbing.

Associate of Science: Occupational Safety and Health October 26th, 2018 Columbia Southern University - Orange Beach, Alabama Technical 5 Year Pipefitting Certification: 2013

Plumbers & Pipefitters - Birmingham, Alabama

Blueprint reading

Credentials

OSHA 10

Confined Space training

Aerial Lifts

Lockout tag out

Welding

Plumbing

Safe work practices

PPE

OSHA 10

OSHA 30

TWIC Card

Journeyman Pipefitter Certification



Contact this candidate