PETER B. MACALUA

**** ****** ***** ** **** ***

Port Arthur, Texas 77642

432-***-**** (C)

Email: ac28wg@r.postjobfree.com

ELECTRICAL ● MECHANICAL ● INSTRUMENTATION

Summary : RELIABILITY ENGINEER

Expertise in three disciplines – Electrical, Mechanical and Instrumentation:

15+ years experience as Senior Manager, Plant Inspection and Maintenance Engineering Department, PHILIPPINE PHOSPHATE FERTILIZER CORP, Isabel Leyte, Philippines, covering

RCFA, troubleshooting, life cycle studies and equipment life prolongation and/or replacement technology processes. Mechanical pumps and heat exchangers anti-corrosion and metallurgy best practices cost benefit analysis.

I was responsible for supervising (10) Maintenance Engineers with emphasis on predictive and preventive maintenance to reduce downtime and increase plant service factors,CMMS, Turnaround Team Lead Role in Turnaround Planning, Implementation and Post Turnaround assessment role.

Special training in Predictive Maintenance on Machine Condition Diagnostic Techniques (MCDT),Ultrasonic and Infrared techniques and analysis, under Japan Industry Cooperation

Agency(JICA) scholarship at Mitsui Toatsu Chemicals Plant,Osaka, Japan.

Plant training in TQM, Kaizen, Quality Circles and Plant Improvement at Kawasaki Steel,

Tokyo Japan.

AREAS OF EXPERTISE

MAXIMO

MERIDIUM

MACHINE CONDITION DIAGNOSTIC TECHNIQUES & VIBRATION ANALYSIS

TROUBLESHOOTING ROTATING AND NON-ROTATING EQUIPMENT PROBLEMS

AIR COMPRESSOR AND PLANT UTILITY SYSTEMS

MOTOR CONTROL CENTERS

FIELD INSTRUMENTATION

MOV TROUBLESHOOTING

CONTROL VALVES TROUBLESHOOTING

RCM, CBM, RCFA, FMEA

HIGH/LOW VOLTAGE MOTORS

I/E TURNAROUND PLANNING & EXECUTION

13.8KV CO-GENERATION, IN-HOUSE POWER GENERATION USING WASTE HEAT STEAM

138KV,13.KV,4.16KV 460V SUBSTATION & APPURTENANCES, PROTECTIVE RELAYING

PREDICTIVE MAINTENANCE AND PREVENTIVE MAINTENANCE

Work History

Temporary jobs while seeking career employment 06/22/17 - Present

Becht Engineering, assigned to BP Alaska North Slope 05/17/17- 6/21/17

As BP North Slope Flow Station 2&3 TA Planner/Coord

(Note: assignment was shortened due to TA deferment to

2018-2019)

Temporary jobs while seeking career employment 02/01/16 – 05/16/17

Randstad Engineering, Assigned Talent to ThyssenKrupp Technology Solutions,

USA, Atlanta Georgia as Electrical Power System Engineer 10/26/15-01/29/16

Make accurate and applicable specs following NEC standards.

Provide basic single line diagram’, motor load and feeder/conductor sizing calculation. Motor Protection and Short circuit ratings.

Review vendor quotes for industrial plant utility tie substations, MV switchgear, medium voltage starters, distribution transformers, low voltage substations and motor control centers, medium voltage wound rotor motors, low/medium voltage squirrel cage induction motors, medium voltage variable frequency drives. Electrical switchgear and one line electrical drawings for contracts and/or bid proposals. Use ETAP software to perform industrial electrical power system studies.

13.8KV 2000A Feeder/Switchgear/UG/AG/ 500MCM and lower, Upgrades/Modernization in cement plants California, North Dakota, Oklahoma, Texas; Low Voltage/Medium Voltage/High Voltage motors. VFD Drives, Liquid Rheostats

For crushers, agitators and materials handling belt conveyors HP sizing, and bid specifications/estimating.

Flint Hills Resources Port Arthur Chemicals 12/2011-7/21/15

I/E Reliability Planner - Reliability & Maintenance Dept

Port Arthur, Texas 77640

As an I/E Reliability Planner at Flint Hills Resources Port Arthur Chemicals, Port Arthur, Texas, I am responsible for reducing the E/I Priority 2 work order BACKLOG by 60%.

I am responsible for the daily I/E tasking and job stepping using MAXIMO CMMS Meridium, INTOOLS, work packaging including Job Safety Analysis, High Risk Form preparation,

MOC (Management of Change) &, Turnaround.

NFPA and OSHA standards compliance, NEC Code, HAZOP, Area Classification,

MOV troubleshooting, Vibration Analysis, and RCFA Group participation.

Experience in documenting instrument checkouts and turnover practices, including

Extensive understanding of turnaround execution processes .and critical path methodology in work planning and scheduling.

Working knowledge of API pumps troubleshooting, alignment / foundation repair.

Saulsbury Electric Co Ltd 11/2010 – 9/2011

Lead Estimator - Electrical/Instrumentation Dept

Odessa, Texas 79766

Responsible for Electrical/Instrument estimating for the following client’s projects:

Oxy Permian Salt Creek CO2 Compressor and PLC controls upgrades, Snyder, Texas

Oxy Permian Cedar Lake Water Injection Electrical Upgrade, Cedar Lake, Welch Texas

Kinder Morgan Compressor motors MCC Upgrade, Snyder, Texas

Atmos Energy Rodessa and Bacon Wells and Withdrawals Enhancements, Athens, Texas

Enterprise Products ESD Replacement and Safety upgrades, Coyanosa, Texas

Conoco Phillips Avalon Compressor Installation, New Mexico

Conoco Phillips Buckeye Compressor Expansion Units, Buckeye, Texas

Philippine Phosphate Fertilizer Corporation 11/1982 – 05/2010

Sr. Inspection & Maintenance Engineering Mgr 01/1997 – 05/2010

FIXED, ROTATING, E/I DEPTS, CONTRACTS ADMIN, T/A PLANNING

Isabel, Leyte, Philippines

As Sr. Inspection/Maintenance Engineering Manager, I was responsible for supervising (10) Maintenance Engineers with emphasis on predictive and preventive maintenance to reduce downtime and increase plant service factors CMMS, Turnaround Planning, and Turnaround Team Lead Role, Planning and Implementation. Post Turnaround assessment Team Lead Role, Analysis and Effectiveness, Cost/Benefit Analysis.

Sr. E/I Manager - Electrical Instrumentation Department 01/1990 – 12/1996

Isabel, Leyte, Philippines

As Sr. Electrical and Instrument Manager, I was responsible for supporting high volume production targets, in a safe, accurate and measurable manner. High reliability in all aspects of electrical and instrumentation service factors. . Establish and maintain E/I Shops in-house repair capability, motor rewinding up to 150kW motors, calibration benches and test instruments. Upgrading skills, tools and test equipment. In-house and off site training in PLC and DCS troubleshooting.

Establish and systematize plant call-in and call-duty electricians and instrument technician roster list with system updates on overtimes.

Sr. Project E/I Engineer – Project Engineering Department 11/1982 12/1999

Isabel, Leyte, Philippines

As Sr. Project Electrical Engineer, I was responsible for enforcing compliance with the National Electrical Code (USA) for construction of electrical facilities. This included installation, testing and commissioning of electrical equipment

Protective Relaying, Coordination Studies, DC Supply, Installation and

Fertilizer Project (Voltages: 480 VAC; 4,160 VAC; 13,800 VAC 138kV)

Substation, Switchgear, Motor Control Centers, Cabling

The work involved day-to-day coordination with international electrical contractors including Dragados Y Construcciones, Mitsubishi Heavy Industries, Kawasaki Steel, and Fuji Electric. Attends construction meetings. Resolves work modifications and authorization requests.

Ras Tanura Oil Refinery, ARAMCO 10/1977 – 10/1982

Senior Electrical Specialist - North Refinery Maintenance Division

Saudi Arabia

As Senior Electrical Specialist in ARAMCO Ras Tanura Oil Refinery (North Plant), main duty involved retrofitting electrical switchgear and preparing recommendations for equipment upgrade with the goal of increasing plant service factors.

#1 in the Call-out/Call-in Roster for subject matter expert.

Serves and acts as Safety Officer during Turnaround assignment.

Specific Project Involvement:

Medium Voltage Electrical Distribution: Involved in installation of main substations with the following components; 138 kV oil circuit breakers and switches, 138 kV oil-filled current transformers, overhead ACSR wiring connections, 138 kV/13.2 kV, 30 mVA transformers, and Siemens distribution switchgear (oil-filled and vacuum interrupter types). Direct-burial cable installation from main substation to different plant motor control centers and medium voltage distribution transformers.

Saudi Arabia Oil Refinery Facility Reconstruction: Participated in reconstruction of the fire-damaged gasoline blending facility at the South Plant of the Ras Tanura Oil Refinery. Reconstruction work involved safe removal of burnt cables and wiring of motor operated valves and pump motors; and installation of new switchgear, direct - burial cables, and new motors.

Waste Water Treatment: Involved in designing and troubleshooting phospho-gypsum waste water effluent treatment using series of gypsum settling ponds and return gypsum water recycling pumps back to the phosphoric acid plant.

Roasting Air Blower Retrofitting: Involved in design, equipment selection and installation of 640 kW inverter-duty motor, associated cabling, ABB motor control center with variable frequency drive, and dedicated 13.2 kV/660 VAC transformer.

Increase Capacity of Existing Utility Air Compressor: Design involved study on plant utility air consumption on normal and surge modes (24 hour operation, 7 days a week) resulting in additional capacity of 2200 cfm at 150 psig. Once CAPEX is approved, detailed engineering including equipment selection is implemented. Engineering evaluation included a determination of available capacity from the existing substation. Major equipment for the project includes Ingersoll-Rand L-type compressor; ABB 150 kW, 480 VAC, TEFC motor; ABB full voltage starter; and direct - burial cable. Involvement includes purchasing, supervision, construction and final commissioning.

Medium Voltage Motors: Involved in the design, construction, commissioning and maintenance of a fertilizer plant (Sea Water Pump Island Facility). The work includes installation of four medium voltage motors by Siemens each rated 1.76 mW at 4160 Volts. The motors are vertically mounted, directly coupled with the pumps with full voltage starters.

Generators: Involved in the design and installation of Denora Hypochlorite Generators using the Denora patented electrolytic cells with titanium plate anodes

Corrosion Management

Sacrificial Anode and Impressed Current : Involved in Pier Sheet Piles and Pipeline Cathodic protection improvement/upgrades, Cathodic Protection surveys, monitoring, troubleshooting rectifier and anode failures.

Education:

Bachelor of Science in Electrical Engineering

University of San Carlos - Cebu City, Philippines

GPA: 3.46/4.00

Professional Registration:

Registered Electrical Engineer, Philippines, License No. 2577

Professional Membership:

IIEE Philippines Lifetime Member #2577

NACE International Member #305056

IEEE Member #90734087

Personal:

Married; Became a US Citizen January 28,2015



Contact this candidate