Post Job Free
Sign in

Construction Management, Engineer, Supervision, Estimator, Schedulor

Location:
Crawfordsville, IN, 47933
Salary:
open
Posted:
October 30, 2017

Contact this candidate

Resume:

TIMOTHY (TIM) P. SHEETS

**** ***** *** ***** **** 55

Crawfordsville, IN. 47933

E-Mail: ***************@*****.***

Home Ph. 765-***-****

Personal Cell Ph. 765-***-**** *** CALL !st ***

EDUCATION:

PURDUE UNIVERSITY at West Lafayette, IN. receiving a Bachelor of Science degree in Building Construction and Contracting, May 17, 1980.

NORTH MONTGOMERY HIGH SCHOOL at Crawfordsville, IN. receiving a Diploma, May 31, 1975.

SPECIAL TRAINING/CERTIFICATIONS:

1] United States of America Passport 2-15-2013 thru 2-14-2023

2] INPO by U.S. Nuclear Regulatory Commission [NRC]; Ten Traits of a Healthy Nuclear Safety Culture.

3] Kaizen Blitz Management sessions 1-6 for Nuclear Power Plant Component Fabrications from Chicago Bridge & Iron [CB&I]/Shaw Modular Solutions.

4] All 56 Procedures requiring revision per Nuclear Regulatory Commission [NRC] Stop Work Order [SWO] from CB&I/Shaw Modular Solutions.

5] Root Cause Analysis [RCAs] for Welding Issues and Corrective Action Program [CAP] for Nuclear Power Plant Component Fabrications from CB&I/Shaw Modular Solutions.

6] Incredible number of WELDING PROCEDURES and WELDER Qualifications have been validated and approved by Stone & Webster and Nuclear Regulatory Commission [NRC].

7] Management seminars from Elkins Constructors.

8] Cost Coding, reporting and monitoring cost reports and usage from Metric Constructors.

9] Nondestructive Examination, Weld Records, Codes & Standards, Methods of Testing Piping Systems, Inspection Piping Systems & General, Control of Special Processes from J. A. Jones Construction Co.

10] Purdue Letter on B.S. Degree in Building Construction Management.

SUMMARY OF EXPERIENCE:

37+ Years in Field/Office and Educated in Construction Management, projects $300,000 thru $2 Billion.

Directly involved with all phases of Construction, Nuclear Power Plant Fabrication/Manufacturing of Modules and Construction developments; Permitting, estimating, building thru certificates of occupancy and close-out.

Responsible for supervising engineers, contractors, crafts (union & open shop), construction engineering, nuclear procedures, nuclear documentation weld logs records, purchasing, estimating, bidding, contract administration, planning, scheduling, cost control, progress tracking, QA/QC, safety.

Knowledgeable of State and Local permits, inspections and certificates of occupancy. Experienced in building; Nuclear Power Plant Components/Module Fabrications, Industrial Refineries, Steel mills, Power stations, Breweries, FDA Food, Pharmaceutical, Chemical, Water & Waste water process facilities, Packaged water cooling systems, Above & Underground utilities, Transportation Roadways & Rail Road tracks, loops, switching: Commercial & Governmental Offices, Schools, Fire Stations, Banks, Churches, Warehouses, Building & Site complexes.

EMPLOYMENT EXPERIENCE:

Wabash National Corp. 1000 Sagamore Pkwy South Lafayette, IN. 47905; March 4, 2016 to Sept. 14,2017.

Bonding Cell operator-worker and general assembly of Semi-truck Trailers; Line 1 curb side scuff plates install & compress rivets.

Integrity Staffing Solutions, Inc. Indianapolis, IN. for Amazon, INDY1; Nov.6, 2015 to Jan.9, 2016.

Temp. Floor Picker of products to be sent-out for Christmas season 11hr. Shifts 6 days a week.

Workforce Plus Crawfordsville, IN. for Heritage Product, Inc. Sept.28, 2015 to Nov.5, 2015.

WELDER OPERATOR ROBOTIC welding steel lower control arm assemblies for automobile parts.

Staffing Resources, Inc. Lebanon, IN. for Case New Holland Sept. 14, 2015 to Sept. 19, 2015.

Training for warehouse lift picking, floor picking, packing & sending; orientation week was not selected.

Absolute House Care 1719 Wabash Ave., Terre Haute, IN. 47807. Aug. 14, 2015 to Sept. 1, 2015.

Selling for Filteropur air purifications systems. DO NOT CONTACT HOSTILE EMPLOYER.

LUTECH RESOURCES, INC. for Chicago Bridge & Iron [CB & I], INC. January 27,2014 to January 29,2015

NUCLEAR CONSTRUCTION FIELD ENGINEER I

Nuclear Modular Operations, fabricating & manufacturing at 3191 W. Lincoln Road Lake Charles LA. 70605.

1/13/2014 CB&I was issued a STOP WORK ORDER [SWO] from the Nuclear Regulatory Commission. I was a group of 60 Engineers hired to be trained to record/review/correct Welding issues, procedures, and Welder Qualifications for the Modules Work Packages Books.

On 4/7/14 We Succeeded, the NRC lifted the STOP WORK ORDER and we proceeded to help the fabrication supervision, welders, workmen performing Nuclear fabrication/manufacturing per the design and approved procedures.

A Nuclear Document Engineer;

Verify all Documentation is present in the Work Package Books for Reviews to Owner and NRC Reviewers.

List associated documents, like material, filler metal Heat Numbers, Engineering & Design Change Requests [E&DCR].

Identify and Verify ALL Welds & Welders Qualified performed in Module Work Packages.

Review ALL QC reports for welds performed in Module Work Packages.

Verify ALL Non-Conformance Reports are documented & closed-out per procedures.

Perform a Final administrative review of the Module Work Packages to be submitted to Document Control.

FLUOR CONSTRUCTORS, INTERNATIONAL INC. Sept. 2, 2008 to Nov. 12, 2012

CONSTRUCTION ENGINEERING MANAGER I :Sept. 21, 2009 thru Nov. 11, 2011

LEAD CIVIL CONSTRUCTION ENGINEER V Sept. 2, 2008 thru Dec. 19, 2008

$2 Billion Marathon Detroit Heavy Oil Upgrade Project, Coker at 13500 Pleasant St. Detroit, MI. 48217

Responsible for managing engineers and providing technical construction engineering support to Marathon personnel, construction, engineering, contractors, procurement, contracts, QA/QC & safety. Assisting with design checks, inspections and monitoring installations of foundations, structures, excavating & backfilling earthwork, sheet & H piling, under ground sewer & piping systems shop drawing reviews, scopes of work for bid packages, material requests and contract administration & meetings with testing, surveying, and fencing contractors

M.T.R./ADMINISTAFF for LURGI, INC. of AIR LIQUIDE GROUP, April 23, 2007 thru January 18, 2008

CIVIL / STRUCTURAL / ARCHITECTURAL AREA COORDINATOR

$166 Million - 110 Million gallon per year Ethanol Refinery for PANDA ETHANOL, INC. at HEREFORD, TEXAS 79045

Responsible for supervising, coordinating, contract administrating, monitoring, QA/QC and inspect construction of prime contractors installations of:

Rail Road track laying- 5 1/2 miles of a double loop with switches unloading/load-out spur tie-in into a live Burlington Northern Sante Fe main rail line, including all associated earthwork and ballast.

Pre-Engineered metal buildings housing several scattered site electrical switch gear equipment.

Package Horizontal Cooling Tower 22,000,000 million gallons per day. The only site installation that was a head of schedule and on budget.

Site roadways earthwork, base, concrete and asphalt paving.

Site underground utilities- fire protection, sanitary and storm sewers, well water piping and natural gas piping.

HIBERNIA CONSTRUCTION Co. of Crawfordsville, IN. 47933 October 1, 2005 thru April 20, 2007

CONCRETE ENGINEER, CONSULTANT, CARPENTER, FINISHER, and LABORER.

Responsibilities with Residential, Apartment, Fast Foods, Churches being smaller contracts installing concrete sidewalks, walls, ramps, pads and porches. The activities included planning, design, reviewing, estimating of: demolition, excavation and grading, formwork, shoring, reinforcing steel, placement and finishing of concrete then removal of formwork and backfilling.

SHIEL SEXTON COMPANY, INC. Indianapolis, IN. 46204 March 29, 2004 thru September 16, 2005

PROJECT SUPERINTENDENT

CVS/Pharmacy at Nashville, IN. Supervising the construction. The project was built with special Nashville facade ( old big frame/farm house style) using many different types of materials, brick, PVC siding, light gage metal trusses & studs along with standard CVS storefronts, drive thru pneumatic delivery system and interiors.

CLARION WEST HOSPITAL $250,000,000 new complex at the West side of Indianapolis, IN. I assisted in supervising the completion and final Fire marshal and Building Department inspections for certificate of occupancy of the hospital.

QA/QC SUPERINTENDENT

ELI LILLY HOMOLOG OFFICE BUILDING #146 $26,000,000 Raymond Street Indianapolis, IN. Supervised monitoring and inspecting all phases of construction installations per specifications and drawings. Also start-up of HVAC equipment and steam piping systems and several roof inspections, lists.

ELI LILLY BIO-TECH LABS $250,000,000 at Kentucky Avenue Indianapolis, IN. Assisted Eli Lilly staff in monitoring and inspecting construction installations, progress of excavations, footings, foundation walls, underground piping and fittings, drains, waterproofing, compacted backfilling and removal of hazardous soils.

FIRESIDE-REFRACTORY’S INC. of Crawfordsville, IN. 47933 November 10, 2001 thru March 1, 2004

SPRAYING FOREMAN and SPRAYING/MIX MACHINE OPERATOR

Nucor Castrip Steel Mill at Crawfordsville, IN. This new plant is the 1st time in the world that thin gage metal coils are being produced in a single phase. My duties included the Vesuvius basalite [cement product] mixing machine operator, maintainer, clean,rework, spray refractory in the tundish troughs and TP's melted liquid steel applicators for the Nucor Castrip Department.

LAUTH PROPERTY GROUP of Indianapolis, IN. 46280 July 11, 1997 thru October 31, 2001

PROJECT SUPERINTENDENT

Site management and supervision for constructing $ 6,000,000 thru $600,000 multi-story offices and office complexes, US Holland Freight Terminal with Office, Maintenance shop & Fueling stations, Guitar Center

warehouse/distribution centers, shopping centers, business parks, manufacturing buildings, Target and Kohls department stores and banks.

CONQUEST ASSOCIATES INC. of Indianapolis, IN. 46280 January 20, 1996 thru July 10,1997

PROJECT SUPERINTENDENT

Site management and supervising contractors and crafts for constructing:

Jasper County low security correctional facility at Rensselaer, IN.

Y.M.C.A. Fort Benjamin Harrison at Indianapolis, IN. this project included phased demolition.

Fishers Main Fire Station and Fishers Fire Station #3 at the Town of Fishers, IN.

Department of Veterans Affairs, Roudebush V. A. Medical Center at Indianapolis, IN. 46280

THE SKILLMAN CORPORATION CONSTRUCTION MANAGEMENT, INC. of Indianapolis, IN. 46280 July 14, 1994 thru December 20,1995

PROJECT SUPERINTENDENT

Site management and supervising, coordinating, scheduling prime contractors, approval progress reports and payments of a $6,700,000 Beech Grove Middle School Beech Grove, IN. complete renovations and new gym and offices while school is in full session. Also encountering hazardous materials like asbestos insulation and fuel oil soils contamination due to underground tanks rusted out.

C.P.M. CONSTRUCTION PLANNING and MANAGEMENT INC. of Indianapolis, IN. 46280 March 21, 1993 thru July 13,1994

PROJECT MANAGER

Responsible for multi-project management including profit/loss on commercial offices, stores, restaurants, and warehouses. Projects ranging from $3,000,000 thru $300,000.

ICA CONSTRUCTION CORPORATION of ICA GROUPO MEXICO at Coral Gables, FL. March 15, 1991 thru March 5, 1993

PROJECT SUPERINTENDENT

Site supervision of prime contractors and crafts (open shop) in constructing 3 each schools price range $12,000,000 thru $6,000,000:

Cresthaven Elementary school at Pompano Beach, Fl.

Park Springs Elementary School at Coral Springs, Fl.

Henry D. Perry Middle School at Miramar, FL.

MULBERRY CONSTRUCTION COMPANY of Mulberry, FL. April 27, 1990 thru March 1, 1991

PROJECT ENGINEER

Anheuser-Busch Brewery Jacksonville, FL. A $1.5 million Demolition and utility relocation contract to enable expansion of brewery. My duties construction engineering, assisting the project manager and superintendent in buying materials, scheduling, QA/QC, records, inspections and supervising craft.

ELKINS CONSTRUCTORS,INC. of Jacksonville, FL. January 8, 1988 thru April 15, 1990

ASSISTANT PROJECT MANAGER

Construction management assisting project managers in estimating, bidding, buying, contract administration, contract scope of works, billing approvals and owner billings, rental agreements and site management :

Florida Power and Light substations.

Water and Waste Water treatment plants

Libraries and Churches

MYLAR CHURCH BUILDING SYSTEMS of Crawfordsville, IN. 47933 October 22, 1987 thru January 4, 1988

PROJECT SUPERINTENDENT

Supervision of contractors, site set-up, break ground and construct the $400,000 Liberty Baptist Church and School at Rochester, IN.

I.C.O.S. CORPORATION of AMERICA of Englewood, NJ. January 10, 1987 thru October 16, 1987

PROJECT SITE ENGINEER

Night shift (6-12hr) site engineer for perimeter concrete seal foundation slurry wall system for new construction of 56 story office high rise complex at 75 State Street Boston, MA. These wall sections involved specialized equipment and techniques to excavate 2 feet by 40 feet long by 110 feet deep at street level, then place slurry, reinforcing steel sections with tremie tubes and then pump concrete from the bottom and pump retrieve the slurry forming a continuous sealed perimeter foundation walls.

J. A. JONES GROUP- METRIC CONSTRUCTORS, INC. of Charlotte, NC. June 1, 1980 thru December 31, 1986

PROJECT ENGINEER

Construction engineering staffs on major projects assisting construction estimating, buying, contract administration, contract scope of works, vendor drawings review and approval, schedules, progress reports, cost control, billings and bill approvals, materials expediting and QA/QC.

Eastman Kodak Corp. Ethyl-ethoxy-proponate [EEP] plant at Kingsport, TN.

Box-Crow Cement Co. at Midlothian, TX. dry process cement plant from mining on property to processed ready to use cement.

Campbell Targett Bakery an Anheuser-Busch Co. at Charlotte, NC. new freezer building, relocated sower dough bake line and total plant up-grade and rework while bakery at full production.

Port Bougainville 387 Unit Condo Complex at Key Largo, FL. Many Engineering tasks; set-up concrete batch plant, concrete mix designs to allow formwork to be removed in 18 hours, shoring formwork, French tunnel form system, architectural treatments.

FIELD ENGINEER / SUPERINTENDENT

Assisted Project Superintendent in civil, structural, architectural phases in the modification and expansion of the Anheuser- Busch Brewery, Baldwinsville, New York. Started this project from drilling caisson foundations, structural steel erection, refrigerated insulated wall panels, tank and vessel setting, piping, instrumentation and electrical phase to total start-up and plant operation. The project was on time and under budget enough that J.A. Jones received a$1,000,000 bonus.

SURINA-BUZEK CONSTRUCTION CO. of Indianapolis, IN. 46218 May 5, 1979 thru September 6, 1979

UNION IRONWORKER FOREMAN LOCAL #22 Indianapolis, IN.

Warren Elementary School of Indianapolis, IN. My duties installing and placing reinforcing steel in footings, slabs, walls and monitor concrete placement.

REPP & MUNDT, INC. of Columbus, IN. May 6, 1978 thru August 25, 1978

UNION LABORER LOCAL #274 of Lafayette, IN.

Stokes Elementary School at Lebanon, IN. My duties part of a combined carpenter, finisher, labor crew placing concrete walls, slabs, sidewalks, flagpole, punch list items and final clean-up for owner's acceptance.

BAKER McHENRY WELCH, INC. of Indianapolis, IN. 46210 May 4, 1977 thru August 28, 1977

UNION LABORER LOCAL #274 of Lafayette, IN.

Constructing the 1st automated wire cleaning acid dip plant of its type in the United States of America for Keystone Wire Mills at Crawfordsville, IN. 47933. My duties part of a combined crafts excavating, forming placing and finishing concrete footings, foundations slabs, expansion joints, hand excavating underground conduits and piping. Additional mixing iron filings into top of slab to produce harden slab finish.

BAYSTONE CONSTRUCTION CO. of Muncie, IN. May 7, 1976 thru August 24, 1976

UNION LABORER LOCAL #274 of Lafayette, IN.

My duties included concrete demolition with 110# jack hammers, formwork erecting and removal, concrete placements, excavating and compacting backfill for the addition of Culver Hospital at Crawfordsville, IN. 47933.

Other Experiences: Raised & grew up on a small farm in West Central Indiana; Operating farm tractors and equipment, building barns, mixing and placing concrete, erecting grain bins.

PERSONAL:

U.S. Citizen, Single, Born: November 27, 1956, Age 58, Height 6'- 1", Weight 262#

ORGANIZATIONS and ACTIVITIES:

Murat Temple A.A.O.N.M.S. Shriner; Ancient Accepted Scottish Rite; York Rite Bodies, Masonic Lodge # 604; Fraternal Order of eagles Aerie #1005

I enjoy hunting, fishing, skiing, auto racing, site seeing, traveling, the great out doors.



Contact this candidate