Civil engineer with over thirty five years of diversified experience in supervision, design, construction and structural analysis, client interfacing and construction coordination associated with power plants, waste treatment facilities, petrochemical and refinery, pulp and paper, steel mill, residential and commercial structures.

Experience encompasses all facets of engineering analysis and design from conceptualization and planning phases through final installation, supervision and coordination of project budgets and schedules. Extensively applied computer programs (STAAD, STRUDL, STARDYNE) for Static and Dynamic Frame and Finite Element Analysis of structural steel and reinforced concrete structures. Used IBC, UBC, ACI, AISC, AWS Codes and NRC Regulatory Guides.

EMPLOYMENT HISTORY

2014-Present Amec Foster Wheeler, Power & Process Americas, Blue Bell, PA Principal Engineer

2007-2014 URS Energy & Construction, Princeton, NJ Supervising Discipline Engineer

2000-2007 Washington Group International, Inc. Princeton, NJ (later URS) Senior Engineer, Civil Engineering Department

1993-2000 Raytheon Engineers & Constructors, Inc. Princeton, NJ (later WGI) Senior Engineer, Civil Engineering Department

1989-1993 Ebasco Services, Inc. New York, NY (Later Raytheon) Senior Engineer, Civil Engineering Department

1985-1989 Ebasco Services, Inc. New York, NY

Engineer, Civil Engineering Department

1982-1985 INSA Engineering and Construction, Ankara, Turkey Engineer, Associate Partner

EXPERIENCE

Amec Foster Wheeler, Power & Process Americas:

Entergy Nuclear Operations

Pilgrim, Indian Point, James A. Fitzpatrick, Vermont Yankee, Waterford, Grand Gulf Exelon Nuclear

Peach Bottom, LaSalle

Duke Energy

Robinson, Brunswick, Oconee

PSE&G

Hope Creek

XCEL Energy

Monticello

OPPD

Fort Calhoun

American Electric Power

DC Cook

TVA

Watts Bar

Currently working for Amec Foster Wheeler, involved in projects with different clients and sites as stated above. Performing calculations, calculation reviews, drawing verifications, field walkdowns, software verification, third party reviews, proposal preparation, outage support and design & licensing basis reconstitution effort. Safeguards trained for Entergy Nuclear plants. ISMAIL AKYAR, P.E.

Page 2

DTE Energy

Fermi Nuclear Plant, Unit 2

Involved in evaluation and reanalysis of concrete members of the safety-related Reactor/Auxiliary building complex for concrete design strength in excess of FSAR commitments. Exelon Nuclear

Engineer of Choice (Services)

Supervised civil/structural team that supported Exelon stations primarily in the Mid-Atlantic

(Three Mile Island, Oyster Creek, Limerick, Peach Bottom). Scope of tasks included seismic qualification of panel mounted equipment, seismic design of suspended systems evaluation and design of structural components and the analysis and design of ISFSI related structures. Completed Exelon’s seismic qualification course. Mitsubishi Heavy Industries (MHI)

North Anna Unit 3

Assisted engineering manager in seismic task force organization. Involved in preparation of schedule for S-COLA work for site specific SSI analysis, prepare template for group working directories.

General Atomics

Next Generation Nuclear Plant (NGNP) Project

Supervised civil, structural, and architectural groups preparing conceptual design reports, updating system design descriptions, preparation of 3D model of the plant using Smart Plant, preparation of cost estimates and schedule, preparation of seismic analysis plan recommending sets of CSDRS to be used in seismic analysis.

Louisiana Energy Services

National Enrichment Facility

Supervised design of walkable ceiling and crane rail for a uranium enrichment facility, preparation of FE model to analyze steel support structure, local design of wall supports and anchors into concrete, design of movable walls along steel trolley system, evaluation of lifting crane trolley systems.

GE Energy.

Economic Simplified Boiling Water Reactor (ESBWR)

Involved as lead engineer and prepared typical seismic support details for HVAC, cable tray and safety related instrument rack supports. Developed initial sizing and preliminary design of various buildings. Analysis and design included extensive application of STAAD structural engineering software.

Philadelphia Electric Company.

Limerick Generating Station

Involved in design of independent spent fuel storage installation (ISFSI) pad which serves as temporary storage of spent fuel storage casks at job site. Work involved satisfying seismic, wind, and thermal differential loading using States Codes and NRC Rules and Regulations. Analysis and design included extensive application of STAAD structural engineering software. SGT Llc, Steam Generating Team.

Oconee Nuclear Power Station, Units 1, 2 & 3

Turkey Point Nuclear Plant, Unit 4

Arkansas Nuclear One, Unit 1

Salem Nuclear Generating Station, Unit 2

Assisted project engineer managers with design and construction during outages to replace steam generators/reactor heads. Work involved evaluations for rigging and handling, temporary supports, and removal and reinstallation of permanent plant structures. ISMAIL AKYAR, P.E.

Page 3

Consolidated Edison Company of New York.

East River Repowering Project

Project involved alteration of a power plant, removing five lower structural steel floors within a nine story building that covered 1.5 city blocks. Responsibilities included steel and connection designs, providing interface and technical support between steel fabricator, construction and engineering. Reviewed shop drawings.

Detroit Edison Company.

Monroe Fossil Fuel Plant

Evaluated and designed modifications including connection design to existing Monroe Unit #1 boiler house structure for new loading from SCR inlet-outlet breeching. Puerto Plata, Dominican Republic.

Puerto Plata Power Plant Project, SD Boiler Plant

Designed mat foundation for new boiler with prestressed concrete piles and pipe racks with extensive application of STAAD structural engineering software. West Valley Nuclear Services Co., Inc.

Remote Handled Waste Facility

Designed new concrete building which serves as a nuclear waste packaging and handling structure satisfying seismic, wind, thermal, differential and internal pressure loading using New York State Codes, Rules and Regulations. Analysis and design included extensive application of STAAD structural engineering software.

Keilco-Kepco Ilijan Corporation.

Ilijan Combined Cycle Plant

Worked on structural design of a new power generating facility in the Philippines. The combined cycle plant project consisted of two blocks each comprised of two gas turbines and one condensing steam turbine generators. Analysis and design included extensive application of STAAD structural engineering software.

Philadelphia Electric Company.

Limerick Generating Station, Units 1 & 2

Provided Fire Protection Upgrades to systems essential for Fire Safe Shutdown, addressed NRC Generic letter 92-08. Worked as responsible structural engineer for various Fire Barrier Systems that were critical to Limerick Plant safety.

Consolidated Edison Company of New York, Inc.

Indian Point Station, Unit 2

Worked on the Con Edison Maintenance Rule Structural Monitoring Program which dealt with the condition of buildings and structures to comply with the provisions of 10 CFR 50.65. Provided technical evaluation for these findings and identified / implemented a required corrective action. Northeast Utilities Service Co.

Millstone Nuclear Power Plant, Unit 2

Worked on technical evaluation of tornado pressure transient impact on HVAC systems. Using STARDYNE engineering software, prepared finite element analysis of ducts, plenums and condenser housings. Prepared DCN’s and performed field walkdowns to ensure constructability of modifications.

General Public Utilities.

Saxton Nuclear Experimental Facility

Worked on decommissioning project of an experimental nuclear plant. Responsibilities included overall structural stability as the demolition of the plant progressed. Designed portable cranes and evaluated rigging load effects on existing structures. Prepared 10 CFR 50.59 Safety Evaluation Reports.

ISMAIL AKYAR, P.E.

Page 4

Public Service Electric & Gas Co.

Salem Nuclear Generating Station, Unit 1

Worked on replacement of four steam generators each weighing 370 tons. This task involved evaluation of underground utilities within transportation route, effects of cranes and heavy equipment on existing concrete and steel structures and design of motion restraint supports for piping associated with steam generators.

Detroit Edison Company.

Fermi Nuclear Plant, Unit 2

Involved in revalidation effort in response to commitments made by DECo to the USNRC staff by providing resolution of all the issues on the Control Center HVAC Structures. This effort involved recalculation of pressure and seismic responses on ducts, duct supports and anchorages, reevaluation of systems to demonstrate their structural adequacy, design of modifications where required, and performance of constructability walkdowns to ensure implementation of effective modifications.

Westinghouse Savannah River Company.

DOE Savannah River Site Project

Design of concrete and steel structures, drainage, and sewage systems in accordance with UBC, ACI and AISC codes. Utilized Westinghouse’s Savannah River site specific design criteria for extreme load cases such as earthquake and tornado. Finite element modeling of major “Waste Treatment” facilities utilizing STARDYNE structural engineering software. Tennessee Valley Authority.

Watts Bar Nuclear Plant Project, Unit 1

Worked on “Thermo-Lag Electrical Raceway Fire Barrier” design including evaluations of Thermo-Lag and 3M Firewrap material installation for existing electrical raceways. Performed field walkdowns in the process of preparing Design Change Notices (DCN) for field changes, and performed structural evaluations and position retention evaluations of these fire barrier enclosures. Task Lead for the rigorous Unit 1 pipe whip restraint evaluation and modification program, which was completed on schedule and within budget. This included managing a team of 12 engineers and performing a detailed evaluation of heavy steel frame protective devices to address Nuclear Regulatory Commission concerns regarding abnormal thermal and seismic loading conditions and the mitigation of postulated pipe breaks. Qualification of these highly stressed steel frames and associated embedded plates required dynamic analysis using the STRUDL computer program as well as extensive client and construction interface to resolve difficult modifications to these structures.

Task Lead for the conduit support qualification group, which refined and qualified typical support calculations and configurations. The purpose of this program was to expedite construction activities with emphasis on cost saving through optimal engineering. This task was completed on time and within budget with a team of 11 engineers and walkdown personnel. Other experience includes revising design criteria, preparation of proposals and work releases, evaluation and modification of suspended system supports including HVAC and cable trays, evaluation of reinforced concrete, steel containment vessel and seismic qualification of equipment panels. Texas Utilities Electric Generating Company.

Comanche Peak Nuclear Plant Project, Units 1 and 2 Primary responsibilities included technical analysis of new and modification of “as built” cable tray/conduit HVAC duct hangers, trouble shooting complex installation problems, resolution of nonconformance and deficiency items caused by construction, interdiscipline coordination between site engineering and field construction engineering and crew, and issuance of design change authorization for modified hangers. Analysis and Design included extensive application of STRUDL static and dynamic frame analysis and finite element analysis program for complex hanger space frames, base plates, anchorage, and welded connections. ISMAIL AKYAR, P.E.

Page 5

Turkish Middle East Petroleum Refinery.

Kirikkale Refinery Project

Designed and supervised installation of pipe rack supports, equipment foundations, and piping trenches.

Hacettepe Fund.

Meteksan Paper Mill Project

Coordinated with Pierre Allibe of France to build a paper mill. Performed construction of concrete and steel superstructure / substructure and managed inter-disciplinary subcontractors, as well as tracking billing costs of the project.

World’s Housing and Development.

Batikent Housing Project

Supervised construction of multi-story apartment complex, public school, and shopping center. Also responsible for installation of solar heating systems, road and drainage system construction. This project was funded by World’s Housing and Development Project. STFA Construction Company.

Adana Steel Mill Project

Worked as a subcontractor to STFA Construction Company. Performed analysis and design of steel frames and modification of existing steel structures for the installation of a heavy-duty industrial crane (gantry). This included the supervision and inspection of associated structural steel construction work details, and coordinating with the main and sub-contractors, from fabrication through installation, for bill of quantities and cost projection. EDUCATION

B.S in Civil Engineering-February, 1982

The City University of New York, The City College

LICENSE

PE License, State of New Jersey

HONOR SOCIETY

Member of Chi Epsilon (National Civil Engineering Honor Society) PERSONAL

Married, two children