RESUME
JULIUS T. DEL ROSARIO
Objective: To seek employment as Mining Engineer, Project Engineer, Site Superintemdent or any related position relevant to my education and work experiences.
Home Address: APB 05 Ambiong Road
Ambiong, La Trinidad, Benguet
Philippines 2601
Handphone : +63-928******* (Philippines)
E mail: **************@*****.***.**
*******.**********@*****.***
BASIC QUALIFICATIONS:
• Registered Mining Engineer (License No. 1360)
• Bachelor of Science Degree in Geology
KEY QUALIFICATIONS :
•A registered Mining Engineer with more than 25 years of experience in mineral exploration; underground and surface mining, with extensive exposure in underground mine development and production works and in civil tunneling and underground structures excavations and construction,
•Experienced with both Non Bored (Drill & Blast and NATM) and Bored (TBM) tunneling.
•Also familiar with installation of permanent works in tunnels and underground structures.
EDUCATION and ELLIGIBILITY:
• Graduated Bachelor of Science in Geology, Adamson University, Philippines, March 1977.
• Graduated Bachelor of Science in Mining Engineering, Adamson University, October 1977.
• Passed the Philippine Mining Engineers Licensure examinations given on September 1977.
EMPLOYMENT
June 2016 to present Technical Consultant
Loacan Itogon Private Miners Association Inc.
Itogon, Benguet, Philippines
Serves as advisor on the operations of small scale underground gold mining operators so that safety, environmental and government regulations are complied. Trains miners on more efficient mining methods and ore beneficiation techniques. Resolve issues with regulators and other stakeholders.
August 2012 to July 2015 Senior Tunnel Engineer
Kier- Laing O Rourke- Kaden Joint Venture
MTR South Island Line (East)- Contract 901
Hongkong, SAR of China
Responsible for the operations undertaken in the tunnel section including resourcing and
overseeing the delivery to ensure safety, quality, timelines and margins meet the
project objectives. Coordinate with other engineering disciplines as required in the day to operations. Contribute to the production and modification of method statements and risk
assessments and other technical submissions. Assist senior colleagues and managers in running the project. Responsible for providing input into engineering solutions and
specifications for the resolution of issues.
This project is part of the MTR South Island Line and involves shaft sinking and
tunnels, caverns and associated adits components of the Admiralty Integrated Station
and SCL Enabling Works using drill and blast method and mechanical excavation as well as the NATM tunneling method.
January 2011 to August 2012 Project Tunnel Engineer
Gammon Construction Limited
Harbor Area Treatment Scheme 2A
Contract No. DC/2007/23
Hongkong, SAR of China
Assigned to oversee the sinking of an 8.5 meters diameter 160 meters deep production
shaft and driving of 5.2 km section of sewage deep conveyance tunnels using typical drill
and blast method.
Responsible for the monitoring and control of the shaft sinking sub contractor’s day to day works and progress. Reviewed their submitted work programs and evaluated against actual accomplishments. Liaised between the sub contractor, the various support group of the main contractor and the client’s consultants of the project. Prepared materials and equipment procurement schedules. Monitored ground improvement works (grouting) excavations, installation of rock supports and quality testing ensuring that these are done per contracts specifications. Maintained data records and prepared project status reports.
Implemented the correct work sequences and safe system of works.
In the tunneling phase, had a direct hands on organizing, planning and forecasts,
implementation and control of the tunneling works and related activities. Reviewed the
project scope and developed process maps for actual works execution. Prepared
production and maintenance programs and materials and equipment procurement
schedules. Worked closely with the engineering geologists regarding the ground
conditions and assignment of the appropriate rock support category. Advised and
assisted the drilling crew on setting the blast hole drilling pattern in the drill rig operating
system computers. Coordinated the activities of support groups and the tunneling crew.
Implemented the safe conduct and standard operating procedures in tunneling. Conducted risk assessments. Supervised and monitored high pressure grouting activities and other ground stabilization works.
Designated simultaneously as Blasting Engineer in the HATS project. .Reviewed blast
designs, prepared explosives withdrawal and blasting reports, supervised a controlled charging and blasting and blasting works.
November 2008 to January 2011 Section Engineer
Mc Connel Dowell Philippines Inc
Rehabilitation of Ambuklao and Binga Hydro
Electric Power Plants Project
Philippines
Assigned to oversee the excavation of the new Intakes, sinking of a140 meters deep -.8 meters diameter Drop Shaft and driving of the Access tunnel, new Headrace tunnels and valve chambers using the drill and blast method and mechanical excavations and rehabilitation of the two kilometer tailrace tunnel in the rehabilitation/refurbishment of two ageing two (2) hydro electric power plant in a very difficult ground condition and restricted working environment.
Responsible for the planning, drafting of construction method statements, actual execution and recording of works in excavation, installation of ground supports and ground improvement/stabilization works. Coordinated with other engineering disciplines and support groups with the tunneling crew on the day to day activities and logistical requirements .Reviewed and counter checked the ground support categories prepared by the client’s engineering geologists, monitored the installation and tested their integrity and strength after installation and ensured that these complied with the required applicable codes and accepted engineering standards. Implemented the safe conduct of tunneling and shaft sinking following accepted international practices, the design specifications and client's site instructions. Supervised and monitored drilling and blasting operations. Responsible for ensuring that approved and proper processes are identified and implemented to achieve contractual quality assurance.
Managed and controlled grouting works. Assisted in the assembly and rectification of the shaft sinking plant and laid down operating procedures. Participated in the evaluation, tendering and awards and control of sub contracted works.
July 2008 to November 2008 Tunnel Construction Manager
International Tunneling Services
Seconded to Arthe Civil & Structure BV/ Alamoot Bridge
and Building Company
Tabriz Metro Rail Project
Tabriz, Iran
Assigned as the Designer’s representative in the recovery and re start up of a 6.8 meter diameter NFM-Wirth EPB tunnel boring machine that stalled due to adverse ground condition.The project is the underground component of the Tabriz Metro Rail Organization.
Responsible for the overall supervision and control of the entire tunnel boring machines and its day to day operations and all related activities. Warranting the construction process and proposing solutions for the problems that arise during the TBM operational stages.
Liaison between the tunneling group and the management of the project. Drawing up daily progress reports. Prepared and reviewed TBM Instruction Sheets and computed the appropriate EPB pressures, tail grout volumes and pressures and other operating parameters.
Responsible for counseling and training the TBM personnel in producing the appropriate grout mixtures and ensuring correct injection, producing the t proper soil conditioning dosage for effective excavation and judging the applicability of the used solution and building the correct application and installation of the segmental linings This work involves a 6.88 m diameter NFM EPB Shield tunneling under heavily built up locations that has to be re launched after long stoppage due to serious ground settlement and collapse.
July 2006 to July 2008 Tunnel Engineer
Who Hup-STEC-Alpine Meyreder JV
MRT Circle line Contract 855
Singapore
Responsible for the day to day operations of tunneling works in the TBM. Managed the EMC system of the Slurry TBM. Predicts and orders the appropriate ring sequence. Records progress and evaluate soil types on the ring lay-out drawings. Monitor TBM operations parameters. Collect and submit all records such as ring build record, TBM operator’s record, foam injection record sheet of the EPB TBM and soil reconciliation records, backfill grouting records. Coordinated cutter head intervention works and production supports. Responsible for the preparation of daily shift reports, machine and materials breakdown/deficiencies, production delays and quality issues regarding the TBM tunneling.
The project utilized Herrenknecht Mix Shield (Slurry) in one directional drive and EPB Shield machines in the opposite drives. Exposed in assembly, operations, cutter head intervention and maintenance regime of tunnel boring machines.
March2005 to July 2006 Tunnel Engineer
Taisei Corporation
MRT Circle Line Contract 853
Singapore
Assigned to oversee the construction of the cross passages to link the twin bored tunnels. Coordinated with the Designer of Temporary Works in the excavation and Installation of temporary works. Conducted geological mapping and ground evaluation to determine the safe round length and the appropriate ground supports .Monitored ground conditions in the course of tunneling and enforce the SOPs of NATM and safe tunneling conducts. Ensured that the required ground supports are installed. Also overseen ground improvement works at the designed cross passages locations.
August 2003 to March 2005 Tunneling Engineer
ECON-NCC JV seconded to Geoconsult Asia Singapore
MRT Circle Line Contract 822
Singapore
Designated as the Designer of Temporary Works Representative to oversee the tunneling works by using two (2) 6.7 meters diameter Mitsubishi 6600 EPB machines and the construction of the cross passages linking the bored tunnels.
Coordinated with the contractor and other interfacing operational entities in the area. Monitored TBM operations and ensured that excavation does not exceed the allowable e volumes and the required backfill grout is injected.
Monitored the ground conditions cutter head interventions.
Conducted geological mapping, monitored ground conditions, issued site instructions on the advance lengths and support requirements in the driving of the cross passages and ensured that these were done accordingly.
February 2001 to August 2003 Tunneling Engineer cum Geotechnical Engineer
Samsung Corporation Engineering and Construction Group
Seconded to Meinhardt (Singapore) Pte.Ltd. / Halcrow
Deep Tunnel Sewerage System Contract T-04 Project
(Ang Mo Kio Tunnel), Singapore
Assigned as the Designers Tunneling Engineer (Supervision) to oversee the driving of the lateral connector tunnels, shafts and vortex chambers using the NATM method. Responsible for identifying ground conditions to determine the corresponding advance length and to check the appropriate ground support category necessary in safe conduct in NATM tunneling.
Prepared geological maps and interpreted geotechnical data. Implemented the SOPs of
NATM and design specifications.
November 1998 to December 2000 Tunnel Engineer
Wayys and Freytag/ECON/CEH Joint Venture
MRT-NEL Contract 704 Project
Singapore
Responsible for planning and organizing, coordination, control, monitoring, supervision and recording the works in EPB bored tunneling using LOVAT RME 2 SE/18000Series Tunnel Boring Machines. Collected, prepared and submitted TBM operational Records such as ring build protocols, ring inspections, foam injection and soil reconciliation records, backfill and secondary grouting and the TBM operator’s records.
February 1997 to September 1998 Tunneling Engineer
Development and Construction Consultants of the Philippines
Angat –Umiray Trans Basin
Metropolitan Waterworks and Sewerage Authority
Norzagaray, Bulacan, Philippines
Assigned as one of the consultant’s site representative to ensure that design specifications, TBM operational parameters, and correct work implementations are followed. Monitored ground conditions and prescribed rock support requirements. Checked and monitored the contractor’s work progress and delays and provided engineering solutions to problems and issues. Ensured that the execution of works were done in accordance with the contract.
Excavation of the 13 kilometer tunnel in hard rock was carried out with a shielded Robbins TBM with 4.88 meters excavated diameter and 4.3 meters finished diameter and service adits were excavated by NATM tunneling method.
0ctober 1994 to December 1996 Geologist/Exploration Engineer
Scott Consultant and Resource Development Corp.
Philippines
Evaluation of mineral properties that are being offered to our clients. Works included stream sediments sampling, float and outcrop sampling, semi detailed to detailed geological mapping, soil geochemistry, geophysical surveys (IP), trenching and diamond drilling. Completed reports, which include interpretations of geology and recommendations of further works or dropping the prospect
September 1990 to June 1992 Tunnel Engineer/Unit Manager
Benguet Corporation,
Philippines
Overseen and supervised the construction of the twin diversion tunnels of the Grand Antamok Project (GAP). Implemented the SOPs of NATM and enforced design specifications. Monitored work progress and evaluated against budget and schedules.
February 1989 to June 1990 Tunnel Superintendent
FF Cruz and Company Inc.
Philippines
In charge of the whole works in the tunnel components of the aqueduct system of the Angat Water Supply Optimization Project (AWSOP) of the Metro Manila Water and Sewerage System (MWSS). The contract has seven (7) NATM tunnels driven through varying ground conditions. Excavation methods include drill and blast and use of road
headers. Implemented the SOPs of NATM. Monitored and evaluated work progress, coordinated the procurement and delivery of supplies, equipment availabilities and traced manpower capabilities.
August 1986to September 1988 Mine Foreman
Atlas Consolidated Mining and Development Corporation
Philippines
In charge of one (1) production area of the Masbate Gold Operations(MGO). Laid down development and production plans for the area, managed the budget, supervised three (3) shift bosses, 6 mine supervisors, 82 miners and muckers. This underground gold mine employs combined cut and fill stoping, sublevel caving and the vertical crater retreat (VCR) mining methods.
June 1985to February 1986 Senior Associate
R.M. Banluta and Associates Inc.
Philippines
Administrator of operations in mining contracts in open cast coalmine, surface chromite mines and limestone quarries with client mining operators. The works included bench drilling and blasting, earth moving and loading and hauling in waste stripping and ore recovery.
July 1984 to April 1985 Managing Engineer
Strategic Development and Construction Corporation
Philippines
Administration and management of operations in civil works contracts focused on road building. The works involved drilling and blasting, earth moving, back filling, grading, drainage and slope protection, sub base preparation and concrete paving.
June 1982 to January 1984 Development Engineer
Metals Exploration Asia Inc.
Philippines
Supervised, monitored, scheduled and helped planned the development works in an underground gold mine. The main activity then was centered on sinking the main shaft and a ventilation shaft located in close proximity to the shoreline. The works involved excavation by drilling a and blasting, clamp shell hoisting of spoils, timbering, grouting, shotcreting concrete lining casting and other related works necessary in sinking through watery and unstable ground conditions.
December 1980 to May 1982 Mine Superintendent
Azure Mining Corporation
Philippines
Administrator of the mine department of an underground copper mines at a rated capacity of 300 metric tones per day (MTPD) Run of Mine Ore (ROMO). This company is an affiliate of Metals Exploration Asia Inc.
April 1980 to December 1980 Mine Geologist
Metals Exploration Asia Inc.
Philippines
Generated ideas for the exploration and mine development and in close coordination with the Mine Engineering department, laid down annual exploration and development programs. Calculation and reporting of ore reserves.
October 1979 to April 1980 Mine Technical Supervisor
Itogon–Suyoc Mines Inc.
Philippines
Line supervision of the works in development and stopping activities in an underground 500 MTPD gold mine employing shrinkage and cut and fill stoping method.
October 1977 to July 1979 Mining Engineer/Geologist
Philchrome Mining Corporation
Philippines
Conducted exploration works, which include geological mapping, trenching, test pitting, percussion drilling and other related activities in alluvial and elluvial chromite deposits. During the operations, made regular calculations and reporting of ore reserves as well as conducted production reconciliation
PROFESSIONAL AFFILIATION:
•Philippine Institute of Mining, Metallurgical and Geological Engineers (PIMMGE)
•Philippine Society of Mining Engineers (PSEM)
PERSONAL DATA:
Nationality : Filipino
Sex : Male
Civil Status : Married
Complexion : Fair
Height : 173 cms
Weight : 78 kgs
REFERENCES
1.Simon Hoblyn
Project Manager
Land Transport Authority
MRT Circle Line 4 &5
Contract 856
65 PasirPanjang Road, Singapore 118506
H/P (65) 98254978
2.Sam Mc Chesney
Project Manager
Land Transport Authority
MRT Circle Line Contract 854
500 Jalan Mashor, Singapore 299175
3.Andrew Kok
Professional Engineer
Meinhardt Singapore Pte Ltd
WH-STEC- AM JV
CCL 855
Tel. (65) 94885679
4.Rex Malbacias
Shaft and Tunnel Manager
Kier-Laing o Rourke-Kaden JV
MTR Contract-C901
Tel 852-********