CURRICULUM VITAE
Name : JOKO PURNOMO
Date of Birth : Cilacap, February 14th, 1976
Religion : Moslem
Nationality : Indonesian
Marital Status : Married
Education : Technical High School in Mechanical
Permanent Address : Jl. Baleng No. 32A RT. 001 RW. 10
Kelurahan Cilacap Kec. Cilacap Selatan
Kab. Cilacap Jawa Tengah 53211
Email : ****.*************@*****.***
Mobile Phone : 081*-****-****
Training and Course : 1. Computer course with program DOS,WS, LOTUS 123, BASICA.
2. Training School for Instrument Fitter Fluor Daniel Eastern,Inc.
The Scoop of Training are all job of Instrument Fitter.
3. Drafter Auto Cad EPC Standart Course for Piping YPST DESC ;
+. Manual Drafting.
+. Auto Cad/ZW Cad Training.
+. 2D and 3D Cad Training.
+. Isometric Training.
4. Training Course of ISO 9001:2015
Introduction, Awareness & Internal Quality Audit .
WORK EXPERIENCES
1. PT. SAMUDRA TEKNINDO HYDRAUMATIC
Classification : Mechanical/Piping Engineering Staff
Location : Karawang, West Java
Period of Service : September 22th 2014 to Present
Job Description : - Preparation shop drawing (Isometric and Detail) for fabrication.
- Monitoring daily shop fabrication of pipe spool and pipe support.
- Ensure latest revision drawing were used for fabrication.
- Joint and spool numbering on Isometric Drawing.
- Coordinates with Piping Engineer, QA/QC and Supervisor for all the
required material, tools and equipment needed the assigned job.
- Communicate and Coordinate with Client on project schedule of work,
progress, technical queries and safety matter.
- Assist Estimator & Marketing in calculating materials, tools and consumables
in the fabrication process for bid/tender.
- Assist and coordinate with QA/QC in the manufacture of Welding and
NDT Map.
- Prepare Hydro Test, Bolting and Nut Tightening.
- Updated as built drawing to Piping Engineers and QA/QC Departement.
- Coordinate with QC and HSE team for quality and HSE measures.
- Coordinates with unit managers about the jobs to be execute to their
respective areas, strictly following area health and safety procedures
and regulation.
- Provides engineering support during completion execution.
Reason of Living : -
2. PT. SAMUDRA TEKNINDO HYDRAUMATIC
Classification : Piping Spool Control/ Engineering Staff
Location : Onshore Receiving Facility Muara Karang & Tanjung Priuk Jakarta
Period of Service : October 21st 2013 to September 20th 2014
Job Description : - Preparation shop drawing (Isometric and Detail) for fabrication. - Monitoring daily shop fabrication of pipe spool and pipe support.
- Joint and spool numbering on Isometric Drawing.
- Coordinates with Piping Engineer, QA/QC and Supervisor for all the
required material, tools and equipment needed the assigned job.
- Prepare Hydro Test, Bolting and Nut Tightening.
- Updated as built drawing to Piping Engineers and QA/QC Departement.
- Provides engineering support during completion execution.
Reason of Living : Job Completed.
3. PT. PRATAMA JAYA PERKASA
Classification : Drafter
Location : Bekasi, West Java
Period of Service : September 3rd 2012 to SEPTEMBER 20th 2013
Job Description : Re-Drawing Mechanical and Electrical System for:
- Lay out.
- Detail Drawing.
- Isometric.
- As Built.
Reason of Living : Job Completed.
4. PT. BARATA INDONESIA
Classification : Drafter
Location : Surabaya, East Java
Period of Service : July 1st 2012 TO Aug 15th 2012
Job Description : Drawing Piping Plant System for:
-Piping Key Plan.
-P & ID.
-Isometric.
Reason of Living : Job Completed.
5. PT. SUPERINTENDING COMPANY OF INDONESIA(SUCOFINDO)
Classification : Cad Operator
Location : Pusdiklat Migas Refenery Cepu, Central Java
Period of Service : Aug 01st 2011 to December 31st 2011
Job Description : Re-Drawing Piping System for :
-Isometric.
-P & ID.
-PFD.
-Piping Plan/Plot Plan
Reason of Living : Job Completed.
6. CONSOLIDATED CONTRACTOR INTERNATIONAL COMPANY QATAR
Classification : Instrument Fitter
Location : Pearl GTL Project, Ras Laffan, Qatar
Period of Service : Aug 19th 2009 to Apr 15th 2011
Job Description : - Fabrication and Install cable tray, ladder tray.
- Fabrication and install tubing for instrument air line and impulse line.
- Leak test for instrument air line and impulse line.
Reason of Living : Job Completed.
7. CONSOLIDATED CONTRACTOR INTERNATIONAL COMPANY QATAR
Classification : Instrument Fitter
Location : RGX Project, Ras Laffan, Qatar
Period of Service : May 07th 2009 to Aug 18th 2009
Job Description : - Fabrication and install cable tray, ladder tray, and support
- Install Tubing
Reason of Living : Job Completed.
8. CONSOLIDATED CONTRACTOR INTERNATIONAL COMPANY QATAR
Classification : Instrument Fitter
Location : Qatar Gas II Development Project (QGX ll)
Period of Service : Dec 14 th 2006 TO May 4 th 2009
Job Description : - Fabrication and install cable tray, ladder tray, and support.
- Fabrication and install stanchion for transmitter.
- Termination cable at Junction box, ITR and ER.
Reason of Living : Job Completed
9. PT. BIMA SENA ARTHA PRATAMA
Classification : Mechanical Technician,Building Maintenance
Location : Puri Garden Apartment, Jakarta.
Period of Service : April 14th 2005 to Nov 25th 2006
Job Description : - Maintenance Generator, Pump, Lift and Sewege TreatmentT Plant
Reason of Living : Job Completed
10. PT. GRAMA BAZITA
Classification : Instrument
Location : Peciko 4/EPSC 3 PT. Total Indonesie, Senipah, East Kalimantan.
Period of Service : Nov 3rd 2004 to Mar 3rd 2005
Job Description : - Fabrication and install stanchion, cable tray,and support.
Reason of Living : Job Completed
11. PT. META METROPOLITAN ABADI
Classification : Fitter
Location : Puri Garden Apartment, Jakarta
Period of Service : July 9th 2003 to Nov 3rd 2004
Job Description : - Fabrication and install pipe for potable water and fire hydrant .
Reason of Living : Job Completed
12. PT. KARANGMAS UNGGUL
Classification : Instrument Fitter
Location : JEIL E & S Co, CILEGON
Period of Service : March 20th 2002 to Jan 12th 2003
Job Description : - Fabrication and install stanchion, cable tray and support.
Reason of Living : Job Completed
13. PT. ELKA INDONESIA JAYA
Classification : Instrument Fitter
Location : Pertamina UP IV Cilacap
Period of Service : AUG 4th 2001 TO JAN 12th 2002
Job Description : - Install transmitter and Loop check.
Reason of Living : Job Completed
14. PT. TRISAKA KOPKARSENTRA UTAMA
Classification : Mechanic II
Location : PT. Semen Cibinong, Cilacap Plant
Period of Service : July 1st 1999 to June 30th 2001
Job Description : - Preventive maintenance air comprssor, oil pump, raw mill and conveyor.
- Over haul air compressor, oil pump, raw mill and conveyor.
Reason of Living : Contract completed.
15. CV. DEWI SRI & CO.
Classification : Helper Finisher (Mechanic)
Location : PT. Semen Cibinong, Cilacap Plant
Period of Service : Feb 4th 1999 to June 30th 1999
Job Description : - Preventive maintenance air comprssor, oil pump, raw mill and conveyor.
Reason of Living : Contract completed.
16. DONGYEONG WIFGAS INTERNATIONAL JOINT OPERATION
Classification : Instrument Fitter
Location : Paiton Power Plant Project Phase-I Paiton, East Java
Period of Service : April 13rd 1998 to Jan 10th 1999
Job Description : - Fabrication and install cable tray, conduit and support.
Reason of Living : Contract completed.
17. PT. LIMAS CAHAYA
Classification : Instrument Fitter
Location : Pertamina UP IV Cilacap
Period of Service : Nov 12th 1996 to Aug 9th 1997
Job Description : - Fabrication and install cable tray, conduit and support.
Reason of Living : Contract completed
18. PT. INDODHARMA HARAPAN HUTAMA INTERNATIONAL
Classification : Instrument Fitter
Location : Merak West Java
Period of Service : July 10th 1995 to March 2nd 1996
Job Description : - Fabrication and install instrument air supply and stanchion.
Reason of Living : Job Completed.
Your sincerely,
(JOKO PURNOMO)