CURRICULUM VITAE
MOHAMMAD MUSTAFA
Post Applied For: Mechanical Engineer
Contact No. ++91-943*******,9835003779Email: ac1si3@r.postjobfree.com
PURPOSE STATEMENT
To work in an Extremely Challenging in Environment where I can fully utilize my theoretical skills, efficiency and responsibility, facilitating growth of the organization and to grow with it.
EDUCATIONAL/ TECHNICAL QUALIFICATION
B.Tech in Mechanical engineering from S.V. College of Engineering & Technology JNTU, Hyderabad .
I.S c. – from Bihar intermediate education council (Patna).
Matriculation from Jharkhand Academic Council Ranchi (Jharkhand),
ADDITIONAL COURSES
AUTO CAD Courses from Canter Cadd Hyderabad
EXPERIENCE INDIAN
Previous working Execution Piping Supervisor in Kp Engineers Limitedsince 01.08.2016 to 02.02.2017, for RiL J3 LDPE PROJECT REFINERY, JAMNAGAR GUJARAT,
JOB RESPONSIBILITY
Develops discipline construction schedules and monitors progress.
Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, and Availability of Construction Drawings.
Monitoring the daily work activities and updating Progress Reports.
Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location,
Orientation, alignment.Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics.
Responsible for carrying out Mechanical Clearance, Conducting Hydro and fulfilling commissioning and Pre-Commissioning requirements for the project.
Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
Ensure that hydro test reinstatement is to be done as per procedure.
Verification of Gasket, flanges, Plates (Using Positive Material Identification method) etc.
Apply usability procedures and principles at project .
Provides schedule and progress appraisal report to the Construction Manager.
To do the inspection of incoming raw materials such as material.
Read and interpret blueprints, technical drawings, schematics, and computer-generated reports.
Confer with engineers and other personnel to implement operating procedures, resolve system malfunctions, and provide technical information.
Preparing an Inspection report for Existing Pipeline & Equipment Shell using UT thickness Survey.
Conducting a detailed Study of Inspection report & Scope of work of each equipment.
Responsible in pipeline project planning, screening of pipeline project opportunities, route selection.
Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
COMPUTER KNOWLEDGE
Microsoft Office Word,Excel, Power Point,Access,Internet Browsing,
Operating System: Win98, Win XP, WinVista&Win7 ultimate, professional.
TRAININGS ATTENDED
1 month vocational Training atH.E.C Ltd. Jharkhand Ranchi 834004 (18th jun 2015 to 17jul 2015)
STRENGTH
Our positive attitude.
Keep works with short and smart ideas.
Never lose passion in any critical situation.
PERSONAL INFORMATION
Father Name : Mohammad Mahboob
Date of birth : 09.01.1992
Marital status : Single
Nationality : Indian
Language known : English, Urdu, and Hindi.
PASSPORT DETIALS
Passport No. : N 2270804
Date of Issue : 11.08.2015
Date of Expiry : 10.08.2025
Place of Issue : RANCHI
PARMANENT ADDRESS
At- Baldeo Sahay Lane Gudri, P.O- Church Road P.S – Lower Bazar, State- Jharkhand, Pin-834001
DECLARATION
I, hereby declare that all the above information furnished by me is true to the best of my knowledge.
Place:-
Date:- Mohammad Mustafa