t
a
t
e
U
n
i
v
e
r
s
i
t
y,
O
k
l
a
h
o
m
a
P
o
Page 1 of 2
Profile CAD Designer with 9+ years’ experience in CAD Drafting and Design of pipeline systems and Chemical Plants. Extensive experience in Pipeline Drafting and Checking of Alignment Sheets, Property Plats and Crossing Permits. Experienced in Pipeline Route Design of cross-country oil and gas pipelines traversing highly congested areas.
Key Skills Drafting/Design in all aspects of Pipeline Mapping
Pipeline Route and Work Space Design
AutoCad 2D and 3D drafting and Civil 3D
CADWorx Plant, Equipment and P&ID
Permit Crossing Design
Land Survey Drafting
Base File management
Microsoft Office> Word/Excel/Access/Outlook
File Management
Creation of Script Files
Client Communications
Experience
GULF INTERSTATE ENGINEERING Jan. 2007 – Sep. 2016
Senior Pipeline Mapper/Designer
Pipeline Mapping drawings including Alignment Sheets, Permits, Plats, HDD’s, Typicals and Wetland Exhibits
Creating and maintaining Centerline, Workspace, Property and Environmental Basefiles
Working directly with client and engineers to build and maintain Pipeline Centerline Routes and Easement/Workspace Footprints
Building Basefile from imported Survey Data
Writing of script files to automate and accelerate drafting
Assisting coordinators to create drafting and procedure standards to facilitate consistency and quality control
Meticulous Checking of all Pipeline Mapping drawings
Assisting Leads with distribution of work to multiple designers and checkers
Notable Projects
Acadian Haynesville Extension, Enterprise Products Project included a telescoping 42-inch, 36-inch and 20-inch natural gas pipeline from Bossier City, Louisiana and continuing 250 miles southeast to Napoleonville, Louisiana.
Alberta Clipper/ Southern Lights Projects, Enbridge Energy The Alberta Clipper Project included 326-miles of 36-inch diameter crude oil pipeline from the US/Canadian border to Superior, Wisconsin. The Southern Lights Project consisted of 136-miles of 20-inch diameter crude oil pipeline and 190-miles of 20-inch diameter diluent pipeline. Sable Trail Transmission, Florida Power & Light Company Ferc Project included 470 miles of 36-inch diameter mainline connecting the Transco pipeline system in Alabama with the Central Florida Hub near Orlando.
18007 Redbud Terrace Lane Cypress, TX 77433
832-***-**** **********@*****.***
James Tyrel Toney
t
a
t
e
U
n
i
v
e
r
s
i
t
y,
O
k
l
a
h
o
m
a
P
o
Page 2 of 2
Education
References
Constitution Pipeline Project, Williams
Ferc Project included 125 miles of 30-inch diameter pipeline beginning in Pennsylvania and extending to New York.
FREEMAN AND CURIEL ENGINEERS April 2017 – July 2017 Mechanical Drafter
Mechanical Drafting/Design using CADWorx Plant, Equipment and P&ID
Creating and maintaining Plant Models, Equipment Models, P&ID’s, Isometrics, Skid Models, Plot Plans, Plan/Section drawings and all other associated drawings
Working directly with Engineers to create and maintain Models in accordance with Standards and Codes
Occasional Electrical/Instrumentation Drafting including Wiring Diagrams, One Line Diagrams, Cable Tray Plans/Sections Cy-Fair Community College Jan. 2007
Certified AutoCad Draftsman Certificate
Cy-Springs High School June 2006
High School Diploma
Karl Knoche
Drafting Coordinator
*******@***.***
Charles Muenchausen
Lead Designer – Pipeline / Mapping
*******@***.***
Lance Thomas, P.E., P.ENG.
Chief Engineer - Pipeline
*******@***.***