EMPLOYMENT HISTORY:
**** ********- ******* ************ *********** – Blaine, MN
April CAD Technician
Generate bid proposals
Follow up on current Projects
Create and generate shop drawings to new and existing files using
Revit and AutoCAD.
2016 March - June Collabrative Design Group – Minneapolis, MN
CAD Technician
Attend in house staff meetings
Go over Project list of duties and progress
Create and generate changes to new and existing files using Revit and
AutoCAD.
Keep updating master Cad standards.
2015-2016 Gerbig Engineering – Burnsville, MN
CAD Technician
Attend in house staff meetings
Go over Project list of duties and progress
Create and generate changes to new and existing files using Revit and
AutoCAD.
Keep updating master Cad standards.
2013-2015 Target Corporation – Minneapolis, MN
Store Design
Attend in house staff meetings
Go over Project list of duties and progress
Generate changes to all Drawings of distribution centers
Convert all existing from Autocad to Revit files.
2012-2013 Flamingo Builders – Coon Rapids, MN
Project Manager
Generate business, meet the clients find their needs
Coordinate the Project with the building crew
Create all construction documents
Pull all building permits and coordinate all inspections
Conduct final walk thru and make any corrections
2007-2011 Target Corporation – Minneapolis, MN
Store Design
Create or examine Feasibility drawings
Create or examine Preliminary drawings
Create final construction documents using microstation
Coordinate all phone inquiries for RFI’s.
2006-2007 Leo A Daly - Minneapolis, MN.
CAD Technician
Create or examine Feasibility drawings.
Create or examine Preliminary drawings
Create or examine Final set of drawings-Using AutoCad 2006
with Arch. Desktop and Revit Version 9.0
Projects include government/military facilities
2000 – 2006 WCL & Associates, Inc. – St. Louis Park, MN.
CAD Technician
Meet with our client (Best Buy retail stores) and get all the specifics for
project.
Coordinate with consultants and conduct a site survey trip.
Put together costs for the project including, city fees,
consultant(s) fees, any special site-specific costs, etc.
Investigate which Building Code is applicable at any location.
Then conduct a Building Code review of the specific area.
Create a Preliminary set of Proposed rendered elevations, Floor
Plans, Site Plan, and any existing drawings that may be required.
Once the Project is approved, I begin coordinating the
Construction Documents.
Attend Pre-Bid meetings with the General Contractors.
Create job specific specification.
Coordinate all phone inquiries for RFI’s.
Coordinate all shop drawings.
Coordinate all revision changes on the clients Project Web Site.
Conduct a final walk through site visit and coordinate any
problems with the General Contractor for corrective actions.
1999 – 2000 Birkeland Architects, Inc. - Minneapolis, MN.
Design/Drafter
Design conceptual drawings for Educational and
Office buildings.
Create preliminary drawings-
Discuss project with the customer.
Oversee the structural design with the Structural Engineer.
Create final drawings to meet the deadlines.
Inspect project during construction as needed.
1997-1999 International Dairy Queen, Inc. - Edina, MN.
CAD Technician
Create or examine Feasibility drawings.
Create or examine Preliminary drawings
Create or examine Final set of drawings-
Contact Franchisee and/or Architect
Review final photos of the Project.
1996-1997 DJR Architects, Inc. - Minneapolis. MN
Design/Drafter (independent Contract)
Design conceptual drawings for Office, Religion, and
Restaurants buildings.
Create preliminary drawings.
Discuss project with the customer.
Create final drawings on the deadline.
1997-1997 Tibbets Engineering – Glencoe, MN.
CAD Technician
Design conceptual structural drawings for Projects
Create preliminary structural drawings.
Discuss project with the customer.
Create final drawings on the deadline.
1996-1997 Cargill - Minnetonka, MN
Facility Planner (independent Contract)
Meet with Department Supervisors and create Feasibility Plan,
Design Space for multiple departments,
Maintain track of materials in stock.
Schedule all contractors involved with the Project-
Oversee all phases of construction.
1994-1999 NOVA Environmental Services, Inc. - Chaska, MN.
Architectural Property Consultant
Identify structural deficiencies on commercial properties and
estimate costs for repair
Identify future costs for the commercial property throughout the
loan term.
Create a report for all site visits.
To initiate client contacts for site visits.
To check with city and fire departments on violations.
Create final report for the Real Estate client.
1991-1994 Magnetic Data, Inc. - Eden Prairie, MN.
Facility Planner
Meet with Department Supervisors and create Feasibility Plan.
Design Space for multiple departments,
Maintain track of materials in stock.
Schedule all contractors involved with the Project.
Oversee all phases of construction.
EDUCATION: Coon Rapids High School
1981 Graduate
Anoka Technical College
1989 Graduate - Architectural Construction and Technology
REFERENCES: Available upon request
PROJECTS: Educational Apartments Malls
Big box retail Restaurants Hotels