Post Job Free
Sign in

RNO/ Service delivery Consultant

Location:
Lagos, Nigeria
Salary:
500,000
Posted:
August 01, 2017

Contact this candidate

Resume:

ADEKOLA .O.OYEYIPO

No:** saratu street iyana ipaja

**********@*****.***/*******.*******@*****.***

+234**********

State Of Origin: Kwara – Nigeria.

D.O.B 9th oct 1985

OBJECTIVE

Highly dedicated and motivated professional with over 6 years of multivendor experience in Technical and High-level reporting roles. Developed and proven proficiency in RAN and IBS/DAS Planning and Optimization, coverage & capacity planning, Frequency Planning, Neighbor planning, site integration and post processing. Complete know-how of maintenance, RF planning & design, and post processing tools

SUMMARY

•Vendor Experience in 2G/3G Optimization and Planning.

•Multi-Vendor GSM Experience – Huawei/Ericsson/Alcatel-Lucent.

•Strong 2G/UMTS/3G/HSDPA/HSUPA Planning & Optimization Experience – Huawei.

•Optimization of Data Services (EDGE/GPRS), Radio & KPI’s of GSM/UMTS.

•Experience in Managed Services & RF Planning /Optimization Projects.

WORK EXPERIENCE

Location : {Nigeria}

Company: CTSL

Date: Nov: 2016 till date

Designation: Project Consultant /Service Delivery manager

Project: ( MTN Benchmark/Cluster Assurance Performance Test)

Strategic End-to-end management and consulting of Radio network Optimization based projects.

Drawing up a budget for the project and executing the project with the available resources using cost-effective methods

Optimizing operation processes to ensure a more efficient delivery of the project

Providing technical support for the engineers when necessary.

Build a cordial working relationship with the clients and provide regular updates to all stakeholders ensuring all Service Level Agreements are met.

Perform quality checks on deliverables before they are sent to customers

Location :South west {Nigeria}

Company: Lightning Networks

Date: Sept 2016 – Nov 2016

Designation;) Snr LTE /RF Engr

•Coverage and throughput prediction.

•LTE: PCI, TAC, TAL, TA, X2, NB Cells and PRACH Planning Using UNET,ATOL, SMART RNO.

•Conducting of TSS (Technical Site Survey).

•Antenna Height and coordinate Planning using GOOGLE EARTH.

•LTE Parameter Optimization; Pilot Polution, co-channel interference, PDCP congestion, sumptuous interference, Service Drop

Location :South west {Nigeria}

Company: Lightning Networks

Date: May 2016- Sept2016

Designation;) Snr 2G/3G RF Optimization Engr

Project: ( VVIP/Cluster Network Assurance/Multi Sector Implementation and optimization)

Analysis of the collected KPI statistical data with their respective counters and monitoring of The KPIs on daily, weekly, and monthly basis.

Traffic balancing on high congested cells.

Reducing Pilot Pollution & improving Ec/No.

HSxPA maximum throughput evaluations & investigations for different UEs categories.

Evaluate & Investigate the Voice Quality (MOS) over the 3G networks

Coverage; RSCP, Ec/No, Path Balance, Pilot SIR, Pilot Pollution, and Uplink & Downlink.

depth knowledge for the improvement of KPIs like reducing DL power congestion and UL power congestion, improving RRC SSR, PS RAB SSR, CS RAB SSR, PS and CS IRAT,SHOSR.

Optimization of worst cells using collected statistical data from M2000, and parameter tuning in order to imp

improve network KPIs

Location :South west {Nigeria}

Operator : Airtel

Company: Lightning Networks

Date: August 2015- May 2016

Designation; RF Optimization Engr

Project: {( VVIP/Cluster Network Assurance /Antenna Redesign/Tower De-loading Project}

Radio Network Optimization (2G & 3G) for antenna redesigned cells

Troubleshoot worse Cells for CSRAB,PSRAB,PSRRC, PSDCR,SHO

Troubleshoot worse Cells for CSSR,DCR,Sddrop,HOSR,TCHcong

Planning and implementation of AOP for newly redesigned cells

Re-planning of underutilized TRX and TRX expansion of priority cells

Re-planning of multiple antenna using Triband to decongest tower load.

Prepare daily Antenna redesigned cell Performance report for customer

Escalate cell with High packet loss to BO

Liaise with level 1 engineer to conclude on physical adjustment proposed.

Monitor worse cells after modification and adjustments of antenna designed

Daily and weekly progress report

Tools used:

Business Object, Citrix(Amos), MCom,

Location :Lagos

Operator :MTN

Vendor :Ericsson

Contractor: Netclean

Project : Golden corridor project

Date: August 28th

Designation 2G/3G RNO

Resolving V.I.P complaint promptly

Perform Network Optimization data analysis

Recommend parameters change and perform advance analysis

Define drive routes and prepare MapInfo maps, for Drive Test

Prepare daily performance reports and identify worst performing cells

Network parameters consistent check on weekly and monthly basis according to project requirement

Process Drive test log file, analyze, recommendations giving and reporting using ACTIX, TEMS Discovery

Making accurate technical analysis and reports of both 2G and 3G.

-Analyzing events such as call drops, handover failures, coverage and quality issues, overshooting, swap sectors .

Carry Out High level network performance management and improvement

Location :Niger Delta Region

Operator :MTN Nigeria

Vendor :Huawei

Project :FY13 TURNKEY PROJECT{Roll out of sites nationwide}2G

Feb/ 2013- Auust 2014

Designation 2G /3G RF Optimization Engr

2G Role.

Optimization for New Roll-out sites

Optimizing Degraded Network KPI’s CSSR, HOSR, DCR, GPRS

using M2000,CME,LMT,Nastar,

Daily Query of Worst Cell Analysis on M2000 for new roll out site

Ensure new sites don’t degrade The BSC

Daily Escalation of Traffic affecting Alarms to BSS Alarm clearing Team

Parameter Optimization to improve, TCH Congestion,SDCCH Congestion, Poor CSSR,Poor HOSR

DCR, Traffic Balancing using M2000,CME,LMT

Cluster Optimization.

Neighbor Planning and Optimization (Intra, Inter, 2G/3G EXT, IRAT)

Resolving Interference using M2000 and Nastar, to improve Network Quality

Analyze and Resolving SDCCH,TCH Congestion, overshooting cell,Swap cells

Engineering parameters preparation.

New sites Monitoring and Analysis of issues as it pertain to network KPI’s.

Function: Network Performance Monitoring and Management

Coordinating of drive test team

Traffic and Capacity Optimization,

Ensure early SLA,FAC and PAC of all integrated sites

Ensuring that customer signs and Accept all Turnkey sites after optimization.

Parameter Optimization to implementation KPI’s RRC setup Success Ratio,RAB setup success Ratio

CDR, CS IRAT, PS IRAT, throughput issues in HSDPA, SHO, to meet requirements of site acceptance

using M2000,CME,LMT,Omstar,FMA 3.8,Unet.

Traces on UU, IUB, IUR and analysis

Daily Escalation of Traffic affecting Alarms to RAN Team

Neighbor Planning and Optimization (Intra, Inter, 2G/3G EXT, IRAT)

Resolving Code Congestion, power congestion, CE congestion, IUB congestion

Pilot Pollution, Overshooting Cells,

Ensure all parameter are correct before Submitting to customer for Acceptance

Location :Niger Delta Region

Operator :MTN Nigeria

Vendor :Huawei

Project :MTN Swap project (Ericsson to Huawei)

Designation 2G RF Optimization

Jan 2012- Dec 2012

Function:

Monitor HUAWEI SWAPPED BSC’s (6900) from Ericsson RBS 2000

Perfom cell parameter mapping and KPI parameter maping from Ericsson to Huawei

Perform Traffic KPI monitoring and Analysis of the swapped sites and compare before and after swap statistics

Parameter Configuration, RNO and neighbour script configuration, External Neighbor relation to the swapped cells.

Traffic balancing between 900 and 1800 band and TRX Reshuffling on Site level

Ensure that the traffic channel of a cell is not over congested or under utilized

Perform the Top N worse cell analysis per Cluster per BSC

via Imanager2000,

Optimizing the Macro Cell by allocating proper Neighbors, Handover criteria, Cell Select/ Reselect Offset Criterion

Analyze performance reports on daily basis and identify the cells where Key Performance

Indicators (KPIs) such as call drop rate, handover failure rate, SDCCH & TCH congestion, SDCCH drop

Solving customer complain{call tracing, checking call procedure from the BTS to the MSC,

Physical optimization tilting of Antenna, correction of wrong Azimuth

Post and Pre network performance monitoring and KPI optimization.

Drive Test Team management to ensure timely delivery.

Location: Western Region,Ghana

Operator: Globacom Ghana

Vendor: Alcatel-lucent

Designation:2G&3G Drive Test Engr

August –October 2011

RESPONSIBILITIES INCLUDE:

2G/3G cluster VOICE AND DATA

FTP test and HTTP test on{hotspot}

R99 UL & DL and HSPA UL & DL

Model tuning {FREQUENCY SCANNING TEST}

Using a post processing tools to analyze[ACTIX]

RNC ATP of takoradi and sekondi which involves Service Bearing Tests such as paging services for Voice, Video and Packet services, RRC Connection Bearing, Calling Services,SMS Service Bearing. Mobility Management for softer HO, Soft HO and Hard HO

Coordination with the Customer, OMC and WRAN Team about site status.

Operator: Etisalat

Vendor: Nokia Siemens (NSN)

Contractor: Quantum-Basics Nigeria Limited

2G Drive Test and Post processing

Site Verification tests:

TRX Testing, Testing Inter-site and Intra-site handovers, Site Coverage Tests, GPRS Testing etc; Drive tests by using TEMS 9.0.

Post process reporting by MAP INFO & TEMS

Identifying Low Power Issue, Faulty TRX,VSWR issues

Functionality testing of site for verification of all TRXs

Edge & GPRS testing.

Intra Cell Hand Over Testing

Intersite Hand Over Testing for defined successful Hand Over

Call Quality Test (CQT) and identification of faulty Trx by locking each Trx and checking call quality on each Trx.

Monitor system performance indicators such as Receive level, Receive Quality, Dropped calls, Blocked calls, HO failure and missing neighbors

Cluster Drive Testing, Short Call Sequence and Long Call.

Report making, with optimization comments.

Drive test for redesigning and Optimization activity to check the following Parameters.

Coverage problems, Capacity problems, Drop call, Handover failure issues and Trxs problems..

Field Identification and survey of new sites.

Supervised riggers in Site Audits, This Involved Pictures of the Site & Antennas etc; Checking Orientation & Adjustment and Checking of Mechanical and Electrical Tilts. Also supervised the changes to Sector Orientation

Monitoring and creating performance Report using Netact 8.0

Contractor: Quantum-Basics Nigeria Limited

Network optimization

Location: Northern region Nigeria/kano

Operator: ZAIN nigeria

Vendor: msi/Aircom

Project :3G/HSPA/GPRS/EDGE/2G Drive Test and Post processing

March-August 2010

Responsibilities

RF Engineer North West Region on “MSI/ZAIN” network optimization project.

Conducting 3G/UMTS Drive test with RF frequency scanning using Z750i UE.

Post-processing of UMTS logfiles with Actix analyzer and TEMS

Identifying and making recommendations towards resolutions of areas of Pilot pollution, IRAT

HO, Inter-frequency and SHO, RAB and RRU issues for UMTS HSPA and R99 networks.

Analysis of Bad radio signal, poor Rx Quality and Interference in problematic areas.

Analyze drive Test Report Through Map Info & ACTIX,Route Analysis

Tems Investigation (8.0,9.0,9.1,) Data Collection

Optimise Network (Checking Call setup success rate, Drop call rate, Handover success rate, Call Block Rate)using Actix analyzer

TRX testing of swap sites (checking for partial swap, low power TRX, Mute call,

EDUCATION

2008 :kogi state university

B.sc (computer science)

2009:quantum basics institute

Cert(Radio network planning and optimization)

2010: quantum basics training school

Layer 3 analysis, KPI OPTIMIZATION ISSUES

2014:PMP in view

2014:Ibadan Business School {Business Risk management}

RF TOOLS USES

Tems Investigation (8.0, 9.0,10,11.0,12.1,13,15.)

Moshell

Discovery 10.01

ACTIX

Tems investigation Route Analysis

Google Earth

ASSET Planner

TEMS CELL PLANNER,8.0

MapInfo, 7,8.5, 9.0 11.0

FMA 3.8

GPS

Compass

PATHLOSS 4.0

Omstar

TEKTRONIX NETWORK ANALYZER(SITE MASTER YBA250/SPECTRUM ANALYZER YBT2

Netact

UNET



Contact this candidate