Asghar Ali
Summary
Low Current System Technical Engineer, with 8+ years of experience in the Field of Low voltage and Extra Low Voltage Systems Installations.
Personal Data
Date of Birth: 13 January 1988
Nationality: Pakistani
Marital status: single.
Religion: Islam
Contact Information
Dammam: Dammam, Saudi Arabia
Mobile KSA : +966 058*******
E mail: ****@******.***.**
************@*****.***
Education
Continue, “BS (IT) From
Virtual University Pakistan.
July, 2008 “Diploma of Electrical Engineering”
PBTE LAHORE
IT Skills:
Microsoft Office
Internet Browsing
AutoCAD
Languages:
English
Arabic
Urdu
Professional Experience
May 2016 Up to date Tamkin Network & Communication information Technology Dammam – Saudi Arabia
Position: Technical Engineer
Role:
•Project Management.
•Leadership.
•Project Planning.
•Technical support.
•Data center.
•Commissioning.
•Networking
•Structure Cabling Network (Inside / Outside Planet (IPS/OSP)
•Fire Detection and Alarm System.
•Physical layer
•Projects:
•PID: Park Inn Hotel Jabail.
•PID, Park Inn Hotel Dammam.
•Hotel : Redsun Blue hotel Khubar (Dammam).
May 2014 March 2016 Innovative Contractors for Advanced Dimension’s
ICAD, Jeddah –Saudi Arabia
Position: Low Current Systems supervisor
Role :
•Lead and Supervise Field Technical Team for Implementation of First Fix, Second Fix and Third Fix for all ELV systems:
•Fire Detection and Alarm System.
•Structure Cabling Network (Inside / Outside Planet (IPS/OSP)
•Fiber Optic installation & splicing.
•Physical layer.
•CCTV system.
•IP Telephony system.
•Audio Visual system.
•IP TV system.
•Public Address and Voice Evacuation System.
•Access Control System
•Wired Data and Telecom Systems.
•Wireless Data Systems.
•Projects:
•KAIA: King Abdul Aziz International Airport Jeddah.
•MOI, Ministry of Interior, Security Complex, Holy City of Makkah.
•KT: KINGDOM TOWER JEDDAH .
•Duties and Responsibilities
Supervision and Management:
•Discuss and negotiate the required resources availability (manpower, tools, and materials) with the site engineers to perform the required Tasks and activities to meet the Time, Cost and quality constraint of the Project.
•Perform Site visits and attend pre construction meetings with Project team to discuss and contribute in Project planning and scheduling process.
•Monitor the resource Quality of the Work of the field team technicians and subcontractors.
•Communicate with the site engineers, site manager, and subcontractors regarding the site problems and discuss and implement proposed solutions.
•Project Health and safety supervision.
•Perform project reports: weekly report and daily report.
•Attend project meetings: weekly meeting and so on.
•Make sure the work progress is according to the project master plan, take any needed corrective actions to meet the site plans.
•Contribute the Consultant Work Inspections Processes with site engineers and main contractor.
Technical & Site.
•Supervision of ELV and Electrical Site Installations, First fix, Second Fix and third fix.
•Guide site team leaders and technicians in both technical issues and challenges also on site task planning and responsibility distribution.
•Coordinate with MEP, Civil and Other trades on site to resolve any site conflicts and issues.
•Inspect Subcontractor completed installations and observe operations, to ensure conformance to design, Drawings and equipment specifications and compliance with technical, operational and safety standards.
•Perform any needed corrections and re work following site engineers, Consultant, Main contractor and customer inspection notes and comments.
•Carry out Commissioning and Testing for all ELV systems in accordance with Commissioning and testing Plans, best practice and industrial standards.
•Review and execute of all ELV systems shop drawings, Plans, schematics, Risers… and feedback the design team for any ideas and conflicts.
•Contribute the handover process and Snag List preparation with site engineers, consultant, Main contractor and Client.
•Make Sure and Confirm that all the Snag list notes are handled and corrected in the preagreed schedule.
EXPERIENCE OF ELECTRICAL
February 2009 to May 2014 in Fair deal, Shah Ji & sons & co.
Position: Electrical Supervisor
•High voltage & Medium voltage Secondary and primary transmission line.
•LT cable Termination Expertise Synchronizing of Alternators.
•Battery Charger Capacity 55Ah
•Safety Relays under Voltage, Over Voltage, Over Current.
•Differential Protection Ground & Earth Fault
•Participated in CAT 3520c Gas Engine top end maintenance.
•Participated in the Erection Project of 100000 no of layer control shed.