Post Job Free
Sign in

Mechanical Engineer Maintenance

Location:
Tijuana, B.C., Mexico
Posted:
July 26, 2017

Contact this candidate

Resume:

Topete Vargas Pedro

Birthdate: May **, **** Age: 26 years’ old

Student of Mechanic Engineering (9th semester)

Marital status: Single

Residencie: Miguel Romero St # 48 Colonia Francisco Villa, Tijuana Baja California

HomePhone:664-***-****, CellPhone:664-***-****, Nextel:152 * 1003563 * 1 Email: ac1h59@r.postjobfree.com, ac1h59@r.postjobfree.com Aim

Be part of the team, bringing knowledge and experience, spirit of service to achieve organizational objectives. “Think first and improve safety always” Work History

Toyota Motor manufacturing of Baja California July 2015 current. Body weld specialist, exercising the position of project engineer, in charge of rebalance of production line, manage projects from planning to execution, in charge of lead the people to establish the correct ideology of the company, execute the team work to improve the system and equipment’s. Main projects:

*Improve automatic guide karts

*Improve the efficiency of robots

*Implement friction drive conveyor

*Develop system to assure the safety of people in not standardized jobs

*Rebalance of process

*Lead contractors and trials.

*Review quotes and manage the money of the shop

Smith connections. December 2014 to July 2015

In this job I have been in charge of the maintenance of the equipment’s to build aerospace connectors, my main activity was to make troubleshooting to machines. Also I was designated to read the diagrams of the machine to level up the equipment.

Main activities:

*Introduce new equipment

*Improve system for preventive maintenance

*Maintenance of equipment and robots

*Improve safety for maintenance team

*Improve machines for better performance.

Mega Electro mechanics. June 2014 to December 2014 In this job I was a temporary technical assistant in the assembly machines area, my work was to do the electrical installation of the machines to produce and assemble the parts, devices and boards needed, design and connection boards plc, and review diagrams of machines.

Also I make market rates, estimates, projections, surveys of the work and modifying the electrical installations in other companies. Main activities:

*Quotes and estimates

*Drawing layouts

*Drawing diagrams of new equipment

*Design controller integration of equipment

*Electric installation

*Mechanical installation

Cosemsa S.A de C.V. August 2013 to April 2014

In this job my work was to draw single line diagrams of electric distribution for contractors and electrical installation of medium and high voltage, project plans to field, draw electric sub stations, develop budgets and estimates for 33 local branch.

Main activities:

*Drawing electrical diagrams

*Drawing layout maps

*Installation of electric cable 480v & 13200v

*installation of electric transformers

*Create quotes

JL Constructores. (JL Builders) March 2013 to August 2013 In this job my work was to draw plans, budgeting, check the input and output warehouse materials and get the materials and equipment needed for construction work in progress.

Main activities:

*Draw electric diagrams

*Façade design of little Caesars stores

*Supervisor of main storage

REMY Electromecánica (REMY Electromechanics), October 2012 to March 2013

In this job my work was make the electrical installations and maintenance of medium and low voltage and mechanical installations, to manufacturing plants. Main activities:

*Electric installation technician

*Mechanical installation technician

Costco Service Provider from 2010-2011

I was laboring as maintenance assistant in bakery area, my job was to assist in what is offered in this sector or do anything what the area’s manager ordered. Main activities:

*Maintenance service

*Maintenance support.

Academic Background

*Engineering electro mechanic at Instituto Tecnologico de Tijuana (ITT) 2010-2014

*Mechanical Engineer at CETYS university 2015-2017 Course and training for managing Opus cms operating system, April 2014.] Studied in Bit center, got training for budgeting by unit price. Job training in Communication. 2007-2010

Studied at the Preparatoria Federal Lazaro Cardenas (high school) got 3 years training to edit radio, video, and image, a brief training in marketing. Additional Information

English 70% - Office 90% - Current USA Visa, experience with project lead, people development.

Knowledge

Operational Systems -Windows and OS

AutoCAD, Opus cms, Allen Bradley PLC, Visual C # sharp, knowledge of welding with electrode and mig, electricity diagrams reading, electronic diagrams reading, pneumatic systems, hydraulic systems, mechanical systems of all kind, profile oriented to electricity.

Tools knowledge.

Vernier, Micrometer, tape measure (inches and centimeters), some tools for installation and maintenance of electrical installations and mechanical, torch, hacksaw and others.



Contact this candidate