DONALD RICHARD DEPOTO
PLAINFIELD N.J., *****
*********@*****.*** 908-***-****
CONSTRUCTION PROJECT MANAGER, with GENERAL AND MECHANICAL
CONTRACTING, ESTIMATING, and PLANING
RICH-MAR CONSTRUCTION (Neptune Twp., N.J.)
Senior Project Manager, Sept. 2008 to Oct. 2016
Coordinated and led 3 Project Managers on 6 projects which were completed without exceeding manpower or financial estimates. Total manpower for each project 25, all union trades. Initiated weekly tool box safety talks with Forman evaluations for their respective workforce.
Six Warehouse Projects, average size of warehouse 15,000 s.f., all union trades on site total workforce of 35,(Laborers, Plumbers, Sprinkler Fitters, Tin Knockers, Fitters, Electricians) coordinated workforce for duration of project.($1,200,000 ea, total cost $7,200,000.)
SCHERING-PLOUGH PHARMECUETICAL (Union, N.J.),
Project Manager and Field Engineer, January 1992 to July 2008
Conversion of existing warehouse into three level State of the Art R & D Labs, each level approx. 90,000 s.f., all union trades total manpower at peak of project 200 (Fitters, Plumbers, Tin Knockers, Sprinkler Fitters, electricians, FF&E, Asbestos Abatement, and other trades), issued all hot work and confined space permits each day by 7 am start time, Completed the project within the estimated manpower and financial obligations. Project done in 2 phase (total cost $110,000,000).
Demo and new research lab, total s.f. 40,000 (all union trades, total workforce throughout project 75, over budget by 4% due to unforeseen asbestos problem. Supervision of all trades……… (total cost $ 750,000)
Installation of new Linear Accelerator in existing building, total workforce of 30 through entire project, (all union trades), project came in on time and under budget by 5% (total cost $3,300,000).
Installation of new Co-Generation Plant on site, with support building, (all union trades) total cost $8,340,000).
Responsible for complete layout, design, and estimating supervision of following projects:
Installation of new above ground research waste line with support towers, workforce on entire site 45, (all union trades (total cost $450,000)
Emergency spill detection system, plant wide, workforce 15 (all union trades) total cost $350,000)
New company 1000 s.f. Computer Mainframe Command Center, workforce 30 (all union trades) (total cost $350,000).
Process Plants Construction Division, Coke Oven construction
Cosentini Associates (Atlantic City, N.J.) Field Engineer
Senior Project Manager, Sept. 1979 to Dec. 1991
Various Casino and Commercial Projects, oversee all construction on sites throughout Atlantic City, N.J. and surrounding area.
Casino Projects estimated s.f., 2,500,000, each project
Commercial Projects estimated s.f., 150,000.
All of the above projects brought in within allowable time frame and estimated monetary values.
Projects Associated with above Casino and Commercial work
1.Bally’s Casino/Hotel and revamp of Dennis Hotel, Sr. MEP Design Supervisor.
2.Golden Nugget Casino/Hotel, 28 story hotel tower, MEP Project Manager.
3.Ocean Condominium Project (2 towers, 16 stories each). MEP Project Engineer.
4.Ocean One Mall Pier, Project Engineer.
5.Resorts Int. Casino/Hotel, Bradway Addition, Lead Piping Designer.
6.Showboat Casino/Hotel, 22 story Hotel Tower, MEP Lead Design.
7.Claridge Casino/Hotel, New Mechanical Room, M&P,HVAC PM.
8.Bally’s Casino/Hotel, New 36 story Hotel Tower, M&P PM.
9.Tropicana Casino/Hotel, New Mechanical Room, MEP PM.
10. Trump Plaza Casino/Hotel, 30 story Hotel Tower, Field Engineer
Allied Chemical Corp. (Morristown, N.J.)
Senior Piping Designer, Aug. 1969 to Aug. 1979
Process Plants Construction Division (PPCD)
PROFESSIONAL REFERENCES PERSONAL REFERENCES
Mr. Oris Neely 732-***-**** Mr. Tom Walsh
Sr. Field Engineer Knights of Columbus, Union
Schering-Plough, Kenilworth, N.J. (908) 591- 1279
Mr. Joseph Belucci 973-***-**** Mr. Robert Genevese
Education Manager Knights of Columbus, Union
Lincoln Technical Institute 908-***-****
Mr. Louis Vendrell 973-***-****
Vice President, Education
Lincoln Technical Institute
PROJECTS LIST
RICH-MAR CONSTRUCTION (Neptune Twp., N.J.) Senior Project Manager
Six warehouse projects w/sitework (avg. approx. $1,200,000 ea 7,200,000
SCHERING-PLOUGH (UNION,N.J.), Project Manager & Field Engineer
Conversion of existing warehouse into new R&D Labs 110,000,000
Demo and new research labs 750,000
Installation of new Linear Accelerator w/bldg 3,300,000
MERCK and COMPANY (RAHWAY,N.J.) Project Manager & Field Engineer
Installation of research waste line with support towers 450,000
Emergency spill detection system, (plant wide 350,000
New computer command center 500,000
CIBA-GEIGY CORP., (TOMS RIVER, N.J.) Sr. Piping Designer
Upgrade of Waste Water Treatment Facility 1,275,000
ALLIED CHEMICAL CORP., (MORRISTOWN, N.J.), Sr. Piping Designer
Process Plants Construction Division
COSENTINI ASSOCIATES (Atlantic City, N.J.) Field Engineer
Various Casino and Commercial Projects 750,000,000