Summary: Over 15 years of Project Management/Design/Construction Administration experience with, Healthcare (OSHPD 1); K-12 schools with Long Beach, Los Angeles, Victory Valley, Glendora, Chino USD and the Los Angeles County Office of Education under DSA jurisdiction; American Honda Motor Corporation and Warner Electra Atlantic Corporation (a Time Warner company) in the construction of renovated and new buildings.

Professional Experience:

Project Manager/Salinas Valley Memorial Hospital, Salinas, CA 1/17-4/17

Installation of floors in patient care rooms (mother baby, pharmacy, labor and delivery, sterile and planning for decontamination room). Construction /planning of surgical light replacement assessment in OR’s, ED optimization, kitchen upgrade, Donor wall, and including the Diabetes center with coordination with users, onsite construction management and OSHPD officials.

Project Manager/ SWA Architects, Pasadena, CA 1/15-9/16

Beverly Hospital, Montebello CA; Voluntary Seismic Improvement on Hospital Tower (some areas modified include radiology, operating rooms, nurse station, lobby, dark room, IT room, Angio room, restrooms, patient showers and rooms, isolation rooms, elevators and lobby offices, stairwells, roof redesign) ADA compliance throughout hospital, Water Heater Pipe Reroute project along with improvements to maintenance facility.

Henry Mayo Hospital, Santa Clarita, CA- Boiler Replacement, Domestic Hot Water Heater Replacement, NICU Humidifier Upgrade and Vacuum Pump Replacements projects. All project under OSHPD jurisdiction for office and field approval, create ACD’s, review and answer RFI’s (develop construction details), submittal review, consultant coordination, shop drawings review for expedient processing to maintain and assure project schedule deadlines. Review and approved PCO’s and pay applications obtain closeout documents.

Project Management/ Design Consultant, Long Beach, CA 5/9-1/15

Consultant

Planned and designed ten new apartments (8,000 total/800 sq. ft. each) added to twelve existing units with new underground subterranean parking for the entire site (2014)

Planned and designed a high school swimming pool complex housing locker/shower area, weight/aerobic rooms, athletic support classrooms, presentation to Compton Superintendent of Schools and staff for pool replacement, 32k sq. ft. (2013)

Develop program and designed a new type of commercial warehouse (22k sq. ft.)/office complex (6k sq. ft.) for a former VP of facilities/Real-Estate (2012)

Partner with contractor with design and construction documents for residential projects with submittal to local agencies for approval. Assist with the projects to final construction and occupancy.

Design the tenant improvement for new restaurant/ residential units in the city of Pasadena CA.

Current with CBC, IBC, NFPA, ADA, LEED, and new building applications through AIA seminars

Civic Obligation/Paid

Long Beach City Commissioner, Board of Examiners, Appeals and Condemnation (building code compliance)

Volunteer at VA Long Beach Healthcare System in the general engineering department; Optometry, Pathology, Hemodialysis patient care new engineering/ police station and day care center buildings, high voltage electrical upgrades,

physical therapy and campus master plan revisions; assisting with QA, design, construction administrations and project closeout.

Mentor/Tutor students at various grade levels at local schools and the Flying Academy at Compton airport where they are trained and have become commercial pilots.

African American Convening Committee (AACC) Long Beach, CA

Project Manager, CSDA Architects, Marina del Rey, CA 4/06-5/09

Managed and designed multiple school sites under Task Order projects for LAUSD and Victor Valley USD for renovation of classrooms, libraries, kitchen facilities, science rooms and installation of relocatibles, led team on DSA corrections for 40-million-dollar HS.

Obtained DSA approval and reviewed/approved/denied submittals, shop drawings, RFI’s, RFC’s, CO’s and created FCD’s during construction for immediate approval, formed punchlist and obtained final closeout documents

Designer, The Austin Company, Irvine, CA 4/05-3/06

Valued engineered construction documents to eliminate waste and incomplete details for a new 40 million dollars private high school athletic complex and completed code analyses for constructability.

Created construction documents and specifications for ADA upgrades for restroom facilities and a new company store at an aerospace company site to local agency for approval, updated database for completed projects

Project Manager, Mcdonald Soutar & Paz, Long Beach, CA 12/02-4/05

Completed Program analysis and client input for schematic design, 3D model and construction documents, specifications for submittal and approval to DSA for Los Angeles County Office of Education and LAUSD for classrooms and office building projects

Managed in house staff, MEP and Structural consultants in completing and coordinating construction documents for projects up to 40 million dollars in construction value

Construction Administration/Production, NTD, Glendora, CA 11/01-11/02

Produced production documents and construction administration on K-12 modernization school projects in Chino, Lake Elsinore and Palmdale USD in the range of 20 to 40 million dollars

Coordinated construction documents with MEP and Structural engineer. Reviewed and approved submittals, RFI’s, RFC’s and CO’s expeditiously for timely project completion and adhering to client’s schedule

Attended project meetings, writing and delivering minutes, resolved construction issues and conducted punchlist for final closeout

Designer/Production, Gonzales Goodale Architects, Pasadena, CA 10/00-11/01

Completed field investigation with measurements and photos to verify existing conditions and prepared code analysis to determine the extent of site and building modification to be completed against approved budget

Designed and prepared construction documents for six school modernization projects and relocatibles for Glendora USD in the range of 14 to 30 million dollars

Performed civil engineering survey of sites to host relocatable buildings

Project Administrator, American Honda Motor Corp, Torrance CA 3/97-7/00

Established program requirements by obtaining client input and created capital budgets for approval. Projects ranged in value and scope from 1 to 30 million dollars on renovation and new construction on facilities throughout the US. CPM methods employed throughout all projects.

Selected from a pool of qualified contractors and architect’s proposals for bids for design and construction. Reviewed proposals for completeness against scope of work and “tough” negotiated a final cost for award of contracts in favor of owner

Managed the entire team- Architects, MEP and Contractors in the process of construction from design to final construction monitoring changes, resolving conflicts and maintained budget and key milestones

Assistant to VP Facilities, Warner Elektra Atlantic, Burbank CA 3/92-3/97

Established the program with input from client and created budget for capital projects. Managed a range of projects in several parts of the country from a new office/ warehouse facility of over 500 thousand square feet with a budget of

40 million dollars to smaller space planning projects in the range of 200 thousand dollars and value engineered project for cost reductions

Obtained entitlements, incentives from utilities companies in using energy efficient equipment

Managed and worked with Architects, Contractors and Engineers and monitored project against undesirable changes, resolve construction issues amicably and completed final punchlist items and obtained final Certificate of Occupancy

Technical Skills:

AutoCad 2013, Revit 2013, 3Ds MAX, Rhino, Sketchup, Microstation, CBC, NFPA, OSHPD, LEED knowledgeable, Microsoft Word, Excel, Power Point, Project, Expedition Primavera P6, Structural Engineering (Dynamic/Static), Finite Element, HAZWOPER 40, CAL/OSHA 30

Additional Volunteer:

Architect Design Volunteer, Long Beach Habitat for Humanity, Long Beach, CA

Atlantic Community Economic Board, Long Beach.CA

UCLA special events, Los Angeles, CA

Education:

University of California Los Angeles, Los Angeles, CA – M. Architecture 1

California State University Los Angeles, Los Angeles, CA - Bachelor of Science Civil Engineering (Structural)

California State Polytechnic SLO ME, EIT no. 53047



Contact this candidate