Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Malolos, Central Luzon, Philippines
Posted:
July 19, 2017

Contact this candidate

Resume:

Emmanuel A. Carpio

Personal Information

Age: ** yrs. Date of Birth: January 01, 1975

Nationality: Filipino Gender: Male

Marital Status: Married Height: 167.70cm Weight: 67kg

Father’s Name: Eliseo B. Carpio Sr.

Mother’s Name: Ma. Belen Alano Carpio

PhilHealth#: 19-026225677-8 SSS#: 33-4190833-5

Pag-Ibig#: 121********* TIN#: 906178367

Contact no. +63-998-***-****

Permanent address: 025 Mambog, Malolos City 3000 Philippines

Education

1991 to 1996 Bulacan State University Malolos City

Bachelor of Science in Electrical Engineering

Professional Certification/Board Passed

Registered Electrical Engineer May 1997 Manila, Philippines PRC Licensed No. 00009121

Years of Work Experience

Current Employment:

Employment (Overseas - Kuwait)

20 years

NEW SAN JOSE BUILDERS, INC.

Quezon City

SENIOR SUPERVISING ENGINEER

September 2016 to June 2017

Managing and supervising works for designated projects in construction of residential and commercial buildings with specialization in Electrical works (HV/MV/LV) & systems including but, not limited to Auxiliary Systems – Fire Alarm, Security Access Control, CCTV, Structured Cabling, Telephone, Intercom & Public Address, Cable TV, HVAC, etc.

Managing all necessary review and study of Electrical design and drawings as per international and/or local codes and standards, e.g. IEC, CE, IEEE, PEC, NFPA, BPS, prior to construction implementation including recommendation for revision and changes to suit and fit the best possible solution as per necessary and actual site condition.

Engaging and participating in every construction coordination meeting, planning & design coordination meeting and contractor’s work scheduled meeting.

Managing and leading all significant staff, e.g. junior engineers, foreman, lead man, skilled workers and helpers, through all aspect of construction related work for electrical including time and man-power schedules, scope of work, day-to-day and weekly activities, toolbox meeting, PPE reminders, materials & equipment schedule, etc.

Managing reviews and preparation of correspondence and documentation for all relevant matters and issues within the construction period to harmonize and synchronized all trade works to prevent unnecessary down fall or work lag as all works progresses.

Managing reviews and rechecking of bill of materials for estimated and actual costing prior to set the target and required quantities against the actual progress of work.

Supervising the preparation and arrangement and conducting of pre-Quality check inspection prior to scheduling of required site electrical inspection to be conducted by QA/QC department as part of construction procedure in electrical works and its auxiliary system.

Engaging and arranging required technical documents, drawings and layouts for approval and acceptance of utility companies for the application of their rendered services provided to the newly constructed building prior to their implementation at site.

ABJ ENGINEERING and FABRICATION CO. K.S.C. Manpower Supply to:

PROJECT 1050 – Maintenance of Electrical Switchgear and Transformer

Sabiya Power Station and Water Distillation Plant.

MINISTRY OF ELECTRICITY AND WATER, STATE OF KUWAIT

June 2011 to May 2015

Electrical Specialist(Plant & Auxiliary Maintenance)

Managing and supervising works for preventive and corrective maintenance that proves the elimination of unwanted shutdown and operation disturbance of the plant

Facilitating the required testing and commissioning of all equipment that undergoes maintenance which creates trouble-free operation and transforms into high efficiency of production output.

Ensuring and maintaining all systems, but not limited to electrical, it also includes HVAC, Fire fighting system, material handling & lifting system, potable water supply, etc., are in good condition for a more reliable and safe operation which result No-Losses in the entire plant.

Executes proper planning, designing and reviewing necessary tender documents for annual maintenance of all equipment that leads into well-organized, fully safe and healthy work environment.

Conducting on-hand inspection and testing of protection system devices which provides status information of plant, thus keeping a healthy and active plant system against any false and nuisance alarm

Supervising and managing technical personnel in implementation and execution of day to day works in accordance to Occupational Health & Safety procedure which creating well-accomplished, on-time completion and accident-free job performance.

Preparing, designating and reviewing all required materials and spare parts necessary in plant & facilities maintenance, thus establishing adequate supply, preventing downtime during emergency works, and avoiding incomplete job.

Coordinating to other section/department all relevant jobs required and scheduled for maintenance, thus formulating ease of work, synchronized action in critical areas and uncompromising the quality of work.

Participating and attending relevant meetings and training’s required for proper maintenance programming, which enhance specific guidelines and procedure for more systematic approach, redefines strategies and techniques in handling critical points and simplifies solution in dealing in all categories of work.

Creating relevant correspondence for all categories of work which provides necessary tools for coordination in all sections and extends effective communication in all levels.

Doosan Heavy Industries & Construction

PJT: Sabiya Distillation Plants with Recarbonation System

MINISTRY OF ELECTRICITY AND WATER, STATE OF KUWAIT

(Stage I&II) – October 2005 to October 2006

(Stage III) – November 2006 to October 2007; Nov2007 to June 2011

Electrical Engineer (Project Engineering, Procurement, Commissioning and Guarantee Maintenance)

Reviewing and preparing technical documents, design specifications, site test procedures, equipment drawings, electrical & instrumentation diagrams and layouts of electrical equipment’s, e.g. Power Transformer, Switchgears (HV/MV/LV) and Motor Control Center, Bus Duct System (HV/MV/LV), DC & UPS System, etc. before and after revisions and after approval from Owner’s Engineering department and to conform that it meets relevant international codes and standards, .e.g. IEC, BS, CE, etc.

Managing and supervising the actual installation & erection of electrical equipment’s, e.g. transformers, switchgears, control panels, power cables, control cables, etc. that meets the expected deadline in accordance to the project time-table and resulted in an error-free and on-time completion of work.

Reviewing and preparing technical documents, design specifications, drawings and layouts of auxiliary systems, e.g. earthing and lightning protection, cathodic protection system, lighting and power sockets, cable routes, HVAC, fire fighting equipment, Motors (MV/LV) & Motor-operated Valves, Handling & Lifting equipment, etc. before and after revisions and after approval from Owner’s Engineering department and to conform that it meets relevant international codes and standards, .e.g. IEC, BS, CE, etc.

Managing and supervising the actual installation & erection of auxiliary equipment’s, e.g. earthing and lightning protection, cathodic protection system, lighting and power sockets, cable routes, HVAC, fire fighting equipment, Motors (MV/LV) & Motor-operated Valves, Handling & Lifting equipment, etc. in collaboration with Vendors and Contractors to meet the expected deadline in accordance to the project time-table.

Preparing and revising site test procedures and documents as required by the Owner’s Engineering department for pre-commissioning of all relevant equipment, but not limited to electrical system, but including auxiliaries in mechanical, HVAC and fire fighting, which established Quality Assurance as the Standard operating procedure ensuring the readiness of these equipment’s prior to Plant Start-up and Commissioning.

Planning and preparing scheduled meeting for managers, engineers and supervisors, i.e. civil, mechanical, instrument contractors together with sub-contractors and/or vendors to established rapport in all areas and facet of work, thus preventing any conflict and risk of propagating delays to the expected completion date.

Facilitating required testing and calibration as part of pre-commissioning test to all relevant equipment including control and instrumentation devices e.g. protection relays, transducers, meters, etc. which enable to prove its functionality, safety and integrity before start-up and during operation.

Preparing and checking inspection report of all relevant equipment necessary for submittals to Site Manager in compliance to all completed work, thereby creating status in every aspect of work and conforming related site progressive report,

Preparing documentation in all completed works in the form of progress report, weekly site schedule, inspection report of all relevant equipment, pre-commissioning test report and commissioning report.

Managing and supervising group of technical personnel in maintaining the operation of the plant during the Commissioning stage, Reliability test Stage and Performance Guarantee Period and ensuring that all equipment are continuously running without downtime at any rate of unwanted disturbance.

Employment (Local - Philippines)

Bridex Electric Phils. Inc. Makati City

Technical / Project SL Engineer

Set to perform in 100% capacity for doing technical design works and specifications and field work with regards to project supervision on installation, testing and commissioning of power & control with inclusion of digital metering devices, switchgear protection relays and power circuit breakers (LV/MV), motor control devices, digital soft starters, variable frequency drives, generator protection relays, etc.

Meet customer satisfaction in attending and providing solutions to complaints and queries right on time for the supplied equipments to be rendered inspection and service at site.

Do project design, cost estimates and specifications for the size and capacity of equipment to be proposed for every project that are subject for bidding.

Conduct presentation and demo to client for the equipment to be supplied as part of orientation and trainings to them.

Work Tenure: December 2002 – August 2005

Plug Electric Corporation Parañaque City

Project & Service Engineer

Do design, cost estimation and tendering works.

Responsible in testing and commissioning of equipment supplied at site from LV/MV switchgear to panel board.

Handles and supervise a group of technical personnel to work at project site, from power to control wiring, cable pulling, equipment positioning and mounting, wire way installation, etc.

Handles and supervise production technician to finish every electrical project inside the plant like LV and MV Switchgear, Motor Control centers, Power Capacitor banks, Meter centers, Auto and manual transfer switches, Distribution panel boards, etc.

Ensure the quality of each equipment finish from the production before it transfers to other section for packing and delivery.

Work Tenure: January 2000 – November 2002

Synchrotech Power Ltd. Co. (Dissolved) Makati City

Technical Engineer

Responsible in design, estimates, testing and quality checking of control panels and switchgears (e.g. LV/MV Switchgear, Auto/Manual Synchronizing Panel, Auto/Manual Transfer Switch, Auto Capacitor Bank, Generator Control panel, Solar panels, etc.)

Handles and performs project works in installation of electrical switchgears, distribution panels, transfer switches, generator control panels with mounting of cable trays/wire ways, conduits, power and control cables, support and harness.

Perform necessary check as per approved drawings and diagrams, and then start preliminary testing and commissioning.

Conduct the necessary testing and commissioning at site with the presence of contractors and equipment manufacturer prior to energizing of switchgears, distribution panels, control panels, etc.

Handles and assist in monitoring and inventory control of components and equipment inventory and incoming stocks.

Assist and support in product demonstration and presentation of some of the company’s new products (e.g. UPS, AVR, Motor, etc.).

Work Tenure: June 1997 – January 2000

RMR Electric Corporation Quezon City

Technician

Responsible in wiring, assembly, testing and quality checking of LV and MV Switchgear, Motor Control centers, Power Capacitor banks, Power Transformers, Meter centers, Auto and manual transfer switches, Distribution panel boards, etc.

Assigned at project site for servicing works of supplied equipment, includes installation, retrofitting, testing and commissioning.

Assigned to perform preventive maintenance work of electrical equipment for our client.

Do check and inspect the rendered service work are fully functioning and operating in normal condition (After Sales Servicing).

Work Tenure: June – November 1996

Skills and Strengths

Testing and commissioning of HV/MV/LV equipment – 16 yrs.

Field Servicing Works (Electrical Equipment) – 8 yrs.

Project Cost estimates and Tendering – 7 yrs.

Supervision for Installation of Equipment – 16 yrs.

Project Management & Evaluation – 3 years

Electrical equipment design and specifications – 6 yrs.

Power and Control diagram design – 8 years

Maintenance and repairs of equipment – 6 yrs.

Computer knowledge and operation – 8 yrs.

Knowledge of Microsoft office and tools – 7 yrs

Computer aided drawing & design(CAD) – 6 yrs.

Languages

Written and Spoken language – Filipino and English

Seminars/Trainings

A.“Total Solution in Electrics and Automation” LG Industrial Systems Product Launching and Presentation, October 2004 by Mr. Lee of LGIS at Merck’s Bar & Resto, Makati City in cooperation by Bridex Electric Phils. Inc.

B.“Electronic Metering Solutions, Genius MK6 Meter” EDMI Pte., November 2003 by Mr. Sukant Beheera of EDMI at Dusit Hotel Makati City in cooperation by Bridex Electric Phils. Inc.

C.Electronic Motor Controller (VSD and Digital Soft starter), June 2003 by Mr. Jhun Ferrer at BEPI Conference Room.

D.“New Generation of Molded Case Circuit Breaker” ABB, Inc, July 2002, by Mr. Alvarez at ABB Inc. Conference Room, Parañaque City.

E.“Technical Seminar on Supervisory Development” SPECS, April 2002, by DTI at Schneider Electric Function Room, Makati City.

F. “Product Seminar on Digital Metering” Bridex Electric Phils, July 2001, by Mr. John Floyd of EDMI, Pty, Australia at Urbanbank Tower, Makati City.

G.IIEE 25 Years in Service to the Profession, Mid-year General membership Meeting, June 2000 (with seminars on electrical safety and eng’g practice, emergency power supply and grounding systems.)

H.“Electrical Practitioners: Powering the Economic Recovery thru RA 7920” IIEE Annual National Convention, November 1998 ( with seminars in protective relays, electrical safety, Phil. Electrical Code 1 and lightning protection)

I.“Electrical Practitioners: Powering the Economic Recovery thru RA 7920” IIEE Mid-year General Membership Meeting, June 1998 ( with seminars in electrical design in High rise building, electrical maintenance of High rise building, telecommunication equipment grounding and electrical distribution design.)

J.Seminar in Motor Control by Poweline Review Center, conducted by Engr. Ramon Cugal, February 1996 at BSU Eng’g Library.

K.Seminar in Industrial Pneumatics by Intercoastal Int’l Trading Corp. (Bosch Hydraulics & Pneumatics) by Engr. Mirabuenos, December 1995.

References

Engr. Ferdinand Jimenez, Project Manager, New San Jose Builders, Inc.

Miss Reneth Datahan, Senior Manager – Human Resources, New San Jose Builders, Inc.

Engr. Fuad Dashti, Electrical Superintendent, MEW Subiya Power Station

Engr. Mohammad Noor, Electrical Consultant, MEW Subiya Power Station

Mr. Su Gwuen Ju, Senior Manager, Desalination Group, Doosan Heavy Industries and Construction Co.

Mr. Dae Yong Yu, Manager, Thermal Eng’g Team, Doosan Heavy Industries and Construction Co.



Contact this candidate