Robert Connely Dale
*** ***** ***** *****, ********, MS 39702
662-***-**** ********@*****.***
EDUCATION
• B.S. Electrical Engineering, Mississippi State University, Starkville, MS, May 2012 EXPERIENCE
• Electrical Engineer/Designer for Integral Systems Engineering, Columbus, MS, May 2012 – Present, Full- time
o Electrical system design and CAD implementation for commercial and industrial buildings o Estimate project costs based on building scope
o Supervise projects to ensure that deadlines are met and budget is maintained
• Electrical/Project Engineer for Irvin Electrical Incorporated, Lackey, MS, May 2012 – Present, Full-time o Responsibilities included:
§ Prepare and review engineering plans, designs and circuit diagrams for projects
§ Execute various projects, ensuring compliance with safety requirements and American and European standards
§ Identify and propose improvements to existing electrical systems
§ Write reports detailing current systems and changes to each site
§ Periodic maintenance – transformer testing, relay testing, troubleshooting and maintenance of PLCs, Distributive Control Systems(DCS), and switchgear equipment
§ Write new DCS code for new instrument installations
§ Make changes to DCS logic to streamline processes
§ Estimate cash flow projections for projects
§ Troubleshoot electrical systems and equipment
§ Manage/coordinate mechanical, civil, and software engineers
§ Maintain relationships with crews and contractors
§ Writing and teaching training materials for Instrument Technicians on Site – DCS Training, Hazardous Area Training, and Emergency Generator Controls Sequence
§ Provide power study information for multiple facilities – protective device coordination, short circuit analysis, power quality information, and load calculations
• Integral Systems Engineering Technician, Columbus, MS, June 2003 – May 2012, Part-time o Testing and evaluating of electrical systems and grounding systems o Verification and corrections of electrical drawings NOTABLE PROJECTS
• C-89 Rectifier Upgrade
o Project Budget: $500,000
o Managed the installation of a new 45kA rectifier to replace an older, less efficient 40kA rectifier o Selected new equipment after receiving multiple proposals o Developed an installation plan due to retrofit requirements to an old transformer o Supervised all aspects of installation of equipment, project budget, and schedule
• 13.2 kV Segmentation
o Project Budget: $125,000
o Managed installation of isolation switches to allow for segregation of troubled areas when necessary
• Hazardous Area Instrumentation Audit and Corrections o Project Budget: $1,500,000
o Conducted audit of all instrumentation in plant’s classified areas o Determined that there were several instruments in Class 1, Div 2 areas that did not meet NEC specifications
o Managed project to correct issues
o Developed and taught a course for Electrical and Instrumentation Technicians on proper installation and maintenance of instrumentation in hazardous areas.
• Arc Flash Mitigation Upgrades
o Project Budget: $500,000
o Selected and managed installation of 19 SEL arc flash relays. o Programed relays individually for each switchgear section using proprietary SEL software
• Installation of New Atlas Copco ZR 200 Air Compressor and a new Air Dryer o Project Budget: $425,000
o Selected equipment for expansion of air compressor system o Supervised installation of equipment, project budget, and schedule
• Generator Controls Testing and Troubleshooting
o Project Budget: $800,000
o Tested load availability for emergency generators and synchronous controls o Researched and presented multiple options for fixing the issues found
• Boiler Instrumentation Installation
o Project Budget: $500,000
o Tested all the auxiliary instrumentation on a recently damaged boiler o Supervised the installation and commissioning of the new flowmeter and any other devices that had to be replaced.
CERTIFICATIONS
• E.I.T. (ID# 13-794-73) – Will sit for PE exam in October 2017
• ABB Harmony Rack I/O (DCS)
• ABB Composer (EWS)
• ABB Conductor NT (HSI)
• EasyPower
SOFTWARE
• EasyPower, ABB Composer, ABB Conductor NT, DBdoc Hyperview, SEL RTAC and acSELerator, and Autocad
• OrCAD, PSpice, Eagle, C++, C, Assembly, MatLab, and Mathematica.
• Minitab, Microsoft Word, Excel, Access, Outlook, Project, and PowerPoint. OTHER INTERESTS
• Worship Leader at First Baptist Church of Columbus, MS References Available on Request.