Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Sampaloc, CALABARZON, Philippines
Posted:
September 10, 2017

Contact this candidate

Resume:

DENNIS G. SELMO

*** ****** *** ****** **** Pangasinan

Philippines 2420

Mobile No. +639*********

Email address – ac18p5@r.postjobfree.com

Summary of Qualifications

** ***** ********** ** *** construction, commissioning and project management of Electro-Mechanical Works for Oil & Gas Facilities, Building and Infrastructure Works in various Projects in Middle East, China and the Philippines with world renown clients such as Saudi Aramco/Kuwait National Oil Company, Qatar Petroleum, Royal Dutch Shell, Chevron and SM Prime Holdings

Bachelor’s Degree Holder in Electrical Engineering

Chartered Engineer (REE) in the Philippines PRC License No. 018872

Knowledgeable in various Engineering code of practice eg. SAES, NEC, BS, QCS, Kahramaa, ADDC, PEC

DUTIES & RESPONSIBILITIES:

A. MEP SITE MANAGER:

1.Develop a general QA/QC Plan to serve as Pre Construction, Construction and Post Construction Guideline during project implementation

2.Develop ITP (Inspection and Test Plans) and Method Statements for specific materials and installation with responsibility matrix

3.Conduct design review and raise RFI’s for conflicts, gray areas and over/under designs.

4.Develop/Initiate preparation of CSD’s (Combined Services Drawings) incorporating all MEPS works to resolve conflict areas.

5.Prepare/Check Material Submittals for approval by Consultants.

6.Prepare/Check detailed shop drawings, red line mark ups and as built drawings.

7.Conduct/Participate with technical meeting with Design and Project Management Consultants to highlight technical problems, work schedule slippage and propose corrective measures.

8.Overall supervision of works to check conformity with standards and specifications.

9.Develop procedures for Testing and Commissioning with utmost adherence to safety.

10.Prepare correspondences and technical write ups.

11.Prepare hand over/acceptance documents for project turn over.

12.Perform Cost Management with consideration to commercial and technical aspect of the project. Initiate value engineering if found feasible.

13.Prepare QS/estimates and participation in bid conferences for prospective projects.

B. ELECTRICAL COMMISSIONING, STARTUP AND SYSTEMS COMPLETION:

1.Enforce the highest level of safety and security to personnel including assets and equipment owned by the company.

2.Inform construction and pre-commissioning / commissioning work sequences according to system priorities and highlight critical works to facilitate planned commissioning activities.

3.Responsible to identify and marked up system limits-boundaries in the latest approved SLD drawings and P&ID.

4.Responsible for the preparation of Mechanical Completion and Commissioning Hand over Dossiers and system hand over to operation.

5.Responsible for revalidation of inputted data, Mechanical Completion Check sheets and Commissioning Completion Check sheets in ZENATOR data base.

6.Categorized and summarized punch list per sub system and give to construction and pre-commissioning for rectification prior to hand over to operation and introduction of hydrocarbon.

7.Organized interface meeting between the company and contractor project team with regards to the issuance of Ready for Commissioning Certificate and Ready for Startup certificate (Commissioning Clearance Certificate).

8.Commissioning of high voltage/low voltage switchgears, motor control centers, emergency

Diesel generators and power transformers. Setting, calibration, and testing of power system

Protective relays.

9.Commissioning and startup of facilities utility and safety systems such as diesel and fuel gas

Systems, vent/flare and drain systems, hot oil system, firewater and deluge systems,

Produced water system, seawater and potable water systems, instrument and service air

System, chemical injection system, UPS and DC systems, communication systems, etc...

10.Prepare daily Commissioning activities, progress measurement and evaluate progress for reporting directly to Project Manager and Planning Department.

11.Evaluate and resolve any field design problems, drawing discrepancies and coordinate such matters to client.

12.Lead the commissioning and startup and prepare energization program.

13.Perform Lock out –Tag out on electrical equipment.

14.Attend inspection for SAT and certification.

15.QEP-Qualified Electrical Personnel

B. ENGINEERING:

14.Procedure writer (Method of Statement, Commissioning Procedure, Initial Power Up Procedure)

15.Possess ability on detail engineering and design.

16.Drawing As-builting.

17.Review and preparation of installation and commissioning work activity listing and schedule.

18.Liaise with design and construction personnel to highlight technical problems and propose corrective measures.

19.Review project drawings and document. (Design and vendor package).

20.Review / prepare material takeoff

21.Review materials needed for construction, precommissioning, commissioning, and start up, completion to ensure on time availability during the phase of implementation.

22.Perform field and office engineering by gathering information to provide basic and detailed engineering design and calculation of electrical loads. This includes by consideration but not limited to the area of classification, applicable codes standard and project specification, etc.

23.Review and evaluate materials and Equipment acceptability and conformance to specification (either supplied by Client or consumable supplied by Contractor).

C. PROCUREMENT:

1.Prepare request for quotation and purchase order.

2.Monitoring the delivery and availability of materials.

3.Ensure material management and proper warehousing that includes preservation.

COMPANY/PROJECT HISTORY:

1.

Position

:

Senior Commissioning Electrical Engineer

Duration

:

September 1, 2013 – June 10, 2016

Company

:

CDB Chevron (Thru SEPAM Engineering and Consulting Co.)

Industry

:

Oil and Gas

Project Name

:

Chuandongbei Gas Project (CDB)

Main Contractor

:

Chevron-Petro China

Location

:

Nanba Town, Xuanhan County Sichuan Province, PR CHINA

Department

:

Commissioning

Owner

:

Chevron-Petro China

2.

Position

:

MEP SITE MANAGER

Duration

:

2011 – 2013

Company

:

Bosphorus Engineering Company

Industry

:

Infrastructure, Industrial

Project Name

:

Dukhan Community Infrastructure Works & Lusail Water Treatment Facilities

Main Contractor

:

Metito Middle East/Samsung Engineering Company

Location

:

Dukhan/ Lusail City, Qatar

Department

:

Commissioning

Owner

:

Qatar Petroleum

3.

Position

:

Commissioning Electrical Engineer

Duration

:

2010 – 2011

Company

:

Al Hammam Contracting

Industry

:

Refinery, Oil and Gas

Project Name

:

SASREF SCOT Project/ KJO Water Treatment Facilities

Main Contractor

:

JGC( Japan Gas Corporation)

Location

:

Jubail Industrial City/ Al Khafji, KSA

Department

:

Commissioning

Owner

:

Saudi Aramco, Shell, Kuwait National Oil Company

4.

Position

:

Resident Electrical Engineer

Duration

:

2008 – 2010

Company

:

Arab Engineering Bureau

Industry

:

Building and Infrastructure

Project Name

:

Al Bateen Development/ Lulu Mall

Main Contractor

:

Al Hadi Company

Location

:

Abu Dhabi, UAE

Department

:

Project Management and Supervision

Owner

:

ALDAR/ EMKE Group

6.

Position

:

Electrical Lead Supervisor

Duration

:

2007 – 2008

Company

:

Construction Specialist (Conspel Qatar)

Industry

:

Building and Infrastructure

Project Name

:

The Pearl Qatar

Main Contractor

:

J & P

Location

:

Doha Qatar

Department

:

Electrical

Owner

:

United De velopment Company

7.

Position

:

Resident Electrical Engineer

Duration

:

2000 – 2007

Company

:

D. A. Abcede & Associates

Industry

:

Construction Project Management

Project Name

:

SM Supermalls

Main Contractor

:

New Golden City/Monolith/DMCI

Location

:

All over the Philippines

Department

:

Electrical

Owner

:

SM Prime Holdings

8.

Position

:

Electrical Project Engineer

Duration

:

1998– 2000

Company

:

System Energizer Corporation

Industry

:

Electrical Construction

Project Name

:

Standard Chartered Bank, Fujixerox, UST

Main Contractor

:

Philippine Hitachi Plant/SECOR

Location

:

Manila, Philippines

Department

:

Electrical

Owner

:

Standard Chartered Bank, Fujixerox, UST

CODE AWARENESS:

IEC

-

International Electrotechnical Commission

NEC

-

National Electrical Code/NFPA

SAES

-

Saudi Aramco Engineering Standard

NEMA

-

VE 1, VE 2-2000

BS

-

British Standard

QCS

-

Qatar Construction Standards

PEC

-

Philippine Electrical Code

SPECIAL SKILLS:

Knowledge in quantity survey, including various civil, piping and structural works.

Computer literate, windows, excel, word etc.

ZENATOR user

Integrated Commissioning and Progress System (ICAPS-Total)-Software

Can operate Auto cad software.

Knowledge in estimation, preparation of claims, variation order, work order and Extra work.

Vast Knowledge in Lock out –Tag out on electrical equipment.

PERSONAL PROFILE:

Date Of Birth : December 13, 1975

Marital Status: Married

EDUCATION

FEATI University

1998

Sta. Cruz, Manila, Philippines

Bachelor of Science in Electrical Engineering

Registered Electrical Engineer

November, 1998

Professional Regulations Commission - Philippines

Professional License Number 018872

MOST RECENT TRAININGS:

Hot Work Training CDB, China (Chevron)

H2S Training CDB, China (Chevron)

Safety Work Practice Training CDB, China (Chevron)

H2s Training CDB, China (Chevron)

Permit to Work Training CDB, China (Chevron)

Confined Space Work Practice Training CDB, China (Chevron)

Working at Heights/ Fall protection Training CDB, China (Chevron)

Hazard Identification Tool Training CDB, China (Chevron)

Job safety Analysis CDB, China (Chevron)

Electrical Safety Seminar CDB, China (Chevron)

Simultaneous Operation (SIMOPS) CDB, China (Chevron)

Permit to Work Supervisor QP, Qatar



Contact this candidate