Post Job Free

Resume

Sign in

Electrical Engineer Power

Location:
San Gabriel, CA
Salary:
30
Posted:
September 05, 2017

Contact this candidate

Resume:

ELECTRICAL ENGINEER

Objective

Seeking a Full-Time Position as an Electrical Engineer to utilize and develop my skills within a potential company.

Technical skills

Functional program skills: AUTOCAD, MASM, PLC, Pspice, MATLAB, Microsoft Office.

Programming languages: C language.

Complex problem solving, critical thinking.

Education

MASTERS IN INDUSTRIAL AND TECHNICAL STUDIES DEC 2016

CALIFORNIA STATE UNIVERSITY LOS ANGELES GPA: 3.0

Major: Power Systems and Control Systems.

Minor: Vocational education and modern industry.

BACHELORS IN ELECTRICAL AND ELECTRONICS ENGINEERING MAY 2014

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD GPA: 6.9

Major: Electrical courses dealing from exterior devices to interior design and working.

Minor: Management sciences and power electronics

RELATED COURSEWORK: Electric power distribution, State space control systems, Power system analysis and stability, Linear system analysis, Power system protection relay, Renewable energy sources, Stochastic systems and estimation, Industrial education, vocational education, comprehensive career education, industrial technology, Research development, power and control systems, HVDC transmission, High voltage engineering, EHVAC transmission, Computer methods in power systems, Power semiconductor devices, Power electronics, Switching theory and logic design, Electrical circuits, Electrical machines, Circuits and machines lab.

Project Exposure

“SUBSTATION MAINTENANCE AND OPERATION” AT 132/33KV SUBSTATION DEC 2013

Actively involved in maintenance of transformers, auto transformers, circuit breakers, and other substation equipment’s.

Dealt with Load calculations, Design of substation, single line diagrams, Investigating, troubleshoot and problem solving experience.

Executed Breakdown operations during faulty conditions and inspection of heating & cooling units.

Hands on experience of all relays and their functioning and purpose. Study on feeder voltage profile on the substation.

“TRANSMISSION LINE ENGINEERING” AT 132/33KV SUBSTATION APRIL 2014

Worked on the specifications of the transmission lines and introduced to factors like sag and tensions, clearances and load types.

Executed Sag tension calculations done by MS EXCEL and Auto -CAD software used for tower load calculations.

Finally, surveying of transmission line is performed.

“STUDY OF OFFSHORE AND ONSHORE WINDFARMS” MARCH 2014

Types of wind farms and its transmission and Introduces HVDC and its transmission through VSC’s. Advantages of offshore windfarms like wind zones, obstructiveness, productivity.

transmission issues faced through power transmission process over offshore windfarms.

In depth of why offshore wind farms is preferred D.C transmission over A.C and their comparison with factors.

“BASIC HOMEMADE BIOGAS ENERGY GENERATOR” AUG 2016

Researched on the Process of generating heat from biological waste through anaerobic digestion principle.

Extracted biogas which is methane but proportionally from the decomposed biomass

“THERMOELECTRIC POWER GENERATION USING EXHAUST GASES” DEC 2016

THESIS: Nurtured the idea of producing electricity from exhaust gas further to next level by also using the engine rotation.

worked on operation of equipment's such as battery, generator, thermo-electric controller unit and Learned about the microcontrollers and switchboard connections for the output.

Produced dual power through the turbine and thermoelectric generator from exhaust gases.

Experience

PROJECT INTERN- APTRANSCO (132/33KV SUBSTATION) JUNE 2013- APRIL 2014

Role: Create and update single line diagrams, prepare calculations and equipment specifications.

Choose relays, control devices, CTs, PTs, lightning arrestors, wave traps, batteries, wiring per the standards and retrieving part numbers from catalogs.

Used to regularly meet and corresponds with outside personnel.

Attained strong technical, leadership and interpersonal skills.

INTERN- J.K. ENTERPRISES MAY 2013- JUN 2013

Trained under professionals on towers erection on the corresponding power stations.

TRANSMISSION & DISTRIBUTION INTERN- ASTER DEPENDABLE SERVICES AUG 2012- DEC 2012

Executed Plant Electrification which involves electrical schemes and single line diagrams, sizing and selection, etc.

Installed and tested the power transformers, optimized solutions for selection of plant automation system.

Professional Organization

Active member of IEEE- Institute of Electrical and Electronics Engineers and active volunteer in IEEE- Industrial Applications Society(IAS).

Active volunteer in GRID ALTERNATIVES – nonprofit which make renewable energy technology accessible to underserved communities.

Volunteered in AIDS Awareness camp.



Contact this candidate