SWETHA
Electrical Engineer
Email: ac12ja@r.postjobfree.com
Contact No: +1-860-***-****
Career Objective:
To obtain a challenging position in a high quality engineering environment where my resourceful experience and academic skills will add value to organizational operations.
Education:
Masters of science, electrical engineering GPA -3.10 DEC-2016
University of Hartford – Hartford city
Bachelors of Technology, Electrical and Electronics Engineering, GPA-3.5 JUN-2013
Chilkur Balaji Institute of Technology - India
TECHNICAL SUMMARY:
Over 2 years of experience in electrical
Utilized an Arduino microcontroller to manage the video surveillance cameras and inconspicuous wheels for propulsion with a DC motor and laser sensors.
Autodesk, MathCAD, LabVIEW, Rhino, MATLAB, Mathematica, SolidWorks, MS Project, MS Office Suite (Word, Excel, Outlook, PowerPoint)
Familiarity with Analog Circuit, Digital Circuit, PCB design, schematic,
Worked with various software tools such as PSPICE, TANNER, COMSOL I have a knowledge of ORCAD lab experiments, Power Electronics
Computer Skills:
C programming, Microsoft Office, Simulink, Multisim, LABVIEW, Balsamic, Enterprise Architect, Pencil, MS Visio, Basic SQL, Salesforce Admin, Salesforce developer, Basic QA
Relevant Courses:
Power Electronics, Fiber optics, Power Systems, Control system, Electrical machines, Switch gear protection, EMF, Electrical devices Circuits, Transformers, HVDC, PV wind energy, Multi-disciplinary, System design, Integration circuits, power systems
Academic Experience:
Arduino based sensor data acquisition and Simulation in PSPICE
New software update release of Orcad Pspice version 17.2. As this version currently supports the Hardware virtualization and Hardware in the loop, which Arduino plays the part for central processing unit of the circuit and gives the simulation, live, used TMP- 36 temperature sensor and photo diode resister for detecting the light and TILT sensor
Control strategies for distribution static compensator for power quality
The reactive power is the main cause of increasing distribution system loses and various power quality problems. Conventionally, Static Var Compensator (SVCs) have been used in conjunction with passive filters at the distribution level for reactive power compensator and mitigation of power quality problems
Extra-curricular activities:
Active member of Voluntary Blood Donor’s Club
Worked for Association named “Make a Difference (MAD)” which involves in various activities like teaching and in providing basic facilities for education to the poor children
Client: Next Education PVT. LTD, India Feb 2015- June 2015
Role: Associate TM
Introduced the product to the customers and informed the benefits and how it works with the software
Maintained a professional relationship with customers.
Ensured that all incoming & outbound calls were courteously & efficiently handled.
Assisted the special projects when needed.
Taking monthly readings for all L.T. high value service and all industrial services in his jurisdiction
Prompt action in disconnecting the services included in the defaulter list and in returning the Disconnection list.
Prompt action in arranging to serve the current consumption charges bills to the consumers well before 1st of every month.
Conduct 11KV feeder wise and distribution transformer wise, energy audit, arrive at line losses and take remedial measures to reduce them.
Maintaining initial accounts of the work orders received, Maintaining initial accounts of the work orders received
Client: 1000 Power Distribution Company LTD, Hyderabad June 2013- Nov 2014
Role: Assistant Engineer
Prompt disposal of pending service connection applications
Taking meter readings before 10th of the month and send the meter readings registers to ERO by 11th of the month after due review prompt replies to the exceptional lists communicated by P.A.A./In- house computer, ensuring that the mater readings in full shape are made available
Taking monthly readings for all L.T. high value service and all industrial services in his jurisdiction
Prompt action in disconnecting the services included in the defaulter list and in returning the Disconnection list.
Prompt action in arranging to serve the current consumption charges bills to the consumers well before 1st of every month.
Conduct 11KV feeder wise and distribution transformer wise, energy audit, arrive at line losses and take remedial measures to reduce them.
Maintaining initial accounts of the work orders received, Maintaining initial accounts of the work orders received