Post Job Free

Resume

Sign in

Project Design

Location:
Bixby, OK
Salary:
125000
Posted:
June 22, 2017

Contact this candidate

Resume:

JJ NEERMAN

865-***-****

***** *. ***** **. *., Bixby, OK 74008

ac0ypt@r.postjobfree.com

PROFESSIONAL SUMMARY

**-*****’ Experience: Process Engineering (8-yrs.) with Project Management (5-yrs.), and Mechanical Technician (10-yrs.) – degreed B.S. Chemical Engineering Cross-functional competencies in all areas of project management & sub-contractor quality management, project engineering, process design, procurements, fabrication, quality, and logistics. Provides an innovative approach to industrial applications incorporating combinations of proven, R&D and prototyping technologies to positively affect production, quality, and profits. Multitasking capabilities to independently accomplish tasks & achieve goals, and delegate project scopes while overseeing others’ productivity & milestone achievements. Organization, documentation & presentation(s) of project scope, check/hold points, specialty deliverables, budgeting & schedule, contractor/client inspection event(s), etc. Well equipped to accomplish turn-key projects and assigned tasks, and takes initiative to proactively discover process areas of improvement, and then proposes possible solutions. Above all contributes to the TEAM dynamic with a strong individual commitment to excellence and translating it to others through effective communication, attention to detail, and exhortation. CORE COMPETENCIES

Project Management skills – scope detail, project execution schedule, vendor / contractor / client coordination, project delegation, Fabrication & Equipment/Man-hour assessments, Contract Terms & Conditions, Milestone / Payment Terms, personnel qualification req’s, weekly team meetings, Progress Report presentation(s), Lean Manufacturing & Six Sigma exposure;

Engineering/Project Drawings & Documents – PFD’s, P&ID’s, General & Piping layout drawings, Equipment sizing & specifications, Equipment/Instrument Data Sheets, Design Criteria, RFP’s, Process/System & Process Control Descriptions, Inspection Schedules, Equipment/Materials Estimates & Take-offs, Calculations,

Codes, Standards, Specifications – API / NFPA / ASME experience, development, review, evaluation, implementation of many national codes and standards

Business Development – takes initiative to market company products and services to potential clients. participates in developing strategies for recruiting new business revenue

Manufacturing Technology Development – Process/System time study & analysis, Prototyping, R&D, development, installation, optimization

Computer Skills – Microsoft Office Suite (proficient; MS Project exposure), ChemCad/ AutoCad/ Microstation (limited experience)

CAREER ACHIEVEMENTS

Managed multiple Boiler Design / Build Projects for various clientele in the U.S.A. and Canada; on one project, captured nearly $2-MM in change order requests caused by Customer’s design changes

Increased Project Revenue by nearly 28%

Improved Project Margin by more than 24%

Inherited a disjointed project and salvaged a working relationship with an otherwise challenging customer

Facilitated and effectively communicated project needs with the Customer, Customer’s Engineer, Third Party Inspector, Sub-contractors, and other equipment suppliers, to recover a project that was quickly getting out of control

JJ NEERMAN

865-***-****

10336 E. 113th Pl. S., Bixby, OK 74008

ac0ypt@r.postjobfree.com

CAREER ACHIEVEMENTS (continued)

Engineered and managed the design of a 250,000 -BBL API 650 Condensate AST for Client in Texas

Conducted site visit & project kick-off meeting

Developed P&ID’s mechanical piping drawings, engineered Foundation/Ringwall Structural Design Package & Containment Area Expansion Design including containment calculations

Managed and coordinated electrical engineering design package

Supported client with other contractors’ design element reviews

Coordinated with and provided engineering support to Field GC

Coordinated and consulted with Client and Client’s contractors regarding “unique” soils issue in the containment and foundation/ringwall areas

Managed project budget, schedule and internal resources and all client interface duties Engineered and managed the design and procurement of Fuel Additive System for an existing Tanker Terminal in California for the regular and premium gasoline lines

Completed FEL-2 Study and Design Basis Memorandum; conducted project kick-off site visit

& walk-down; developed & maintained project & milestones schedule

Developed PFD’s, P&ID’s, mechanical piping & civil drawings

Managed and coordinated electrical engineering and design, and drafting resources

Prepared System Description, Process Description, and Process Controls Description, and Primary Equipment Data Sheets

Solicited bids, provided bid tabs, managed oversight of vendors during fabrication

Worked independently and coordinated with Client throughout the process providing milestone achievements and 50%, 75%, & 90% Design Reviews

Supported Client’s permitting efforts and provided seismic analysis for Structural elements

Coordinated California PE stamping for complete IFC design package Proposed alternative design for Reagent Processing Building (BRP) at Nuclear Material Reprocessing site eliminating $4,000,000.00 capital cost; eliminated on-site reagent manufacturing and implemented off-site processing and logistics to provide twelve (12) necessary reagents

Developed Concept and Proposed to Client and Management; recruited, visited, proposed concept to thirty (30) chemical suppliers to ensure a minimum of six (6) interested suppliers for RFP bid process

Evaluated existing BRP design to determine equipment/systems deletions and implement new necessary chemical storage and transport systems

Initiated new facility general and equipment layout complete with arrangement drawings, PFD’s, P&ID’s, piping layout drawings, contractor/sub-contractor/vendor business requirement documents, logistical plans, chemical reagent specifications, process/system descriptions, process/system calculations

Coordinated and lead contractor/sub-contractor/vendor progress report meetings and provided updated status presentations with client

2-Year design package completed and delivered on time and under budget JJ NEERMAN

865-***-****

10336 E. 113th Pl. S., Bixby, OK 74008

ac0ypt@r.postjobfree.com

CAREER ACHIEVEMENTS (continued)

Took initiative to design, propose, prototype, test, & duplicate innovative oil application system that applies oil to fin stock prior to entering fin press forming fin packs for heat exchangers – elements Stage-Gate methodologies employed

Initial prototype experimented on one (1) fin press, then four (4), and then designed specific systems for all forty-seven (47) fin press throughout the manufacturing facility

1st Year oil costs reduced $175,000.00; 2nd Year projected savings $300,000.00

Oil Application Project paid for through savings in 1st Year

Reduced necessary oil applied to fin stock 75%; decreased product returns due to excessive oil smoke during heat exchanger 1st operation 65%; increased customer satisfaction 50% Discovered bottlenecking and operational inefficiencies with heat exchanger paint lines; took initiative to design two universal dip tanks; eliminated the need to change out paint dip tanks when running variable size heat exchangers – elements Stage-Gate methodologies employed

Dip tank change outs took two and a half (2-1/2) hours to conduct; eliminated set up times to improve piece per hour painting efficiencies

In 1st year of operation, efficiency improved 35% allowing management to cut back paint operations from three (3) shifts to two (2) shifts

Eliminated fourteen (14) dpi tanks by implementing two (2) universal dip tanks – one (1) oil- based and one (1) water based paint dip tanks

As a secondary benefit, paint drying line efficiency positively resulted since heat exchangers did not sit too long on conveyor in ovens getting scorched causing rework Proposed a pilot scale environmental testing chamber for analysis of proprietary coating for copper tubing preventing formicary corrosion; needed real-world simulation to test heat exchanger operating conditions; developed concept, sought managerial approval, designed

& built simulator – elements Stage-Gate methodologies employed

Could not adequately mimic real-world failure in lab environment; designed system to house multiple exchanger tubing packs to test variable coating applications scenarios

Successfully demonstrated a system to provide three (3), six (6), twelve (12), eighteen (18), and thirty-six (36) month exposure conditions

Resulted in advanced R&D of coating providing additional data for analysis Proposed, developed and published, feasibility for production of Next Generation Universal Spent Nuclear Fuel (SNF) Storage Casks

Proposed a design of a Cask for the containment, transport and disposal of SNF eliminating the need for multiple SNF handling operations

Using a proprietary blend of depleted uranium oxide and special aggregate, improved cask capacity 40%; improved critical impact performance results 60%

Evaluated equipment/materials design criteria, process conditions, engineered necessary and sufficient equipment, designed production protocols and timelines, assessed production, labor and transport costs

Published work and presented to National Laboratory scientists and directors JJ NEERMAN

865-***-****

10336 E. 113th Pl. S., Bixby, OK 74008

ac0ypt@r.postjobfree.com

CAREER ACHIEVEMENTS (continued)

Proposed and designed a computer modeling simulator for the production, storage, transport, and end-use applications, of hydrogen using steam-methane reforming

Using a proprietary software, designed equipment and systems to produce hydrogen from steam-methane reforming process; evaluated mass, energy, and chemical balance calculations

Modeled storage tanks, transfer piping systems, end-user tanks and supply chain dynamics

Analyzed via staged approach reaction kinetics and steady state characteristics for the validation of a real-world, localized hydrogen economy

Documented, reported, and presented findings to National Laboratory scientists and directors PROFESSIONAL EXPERIENCE

VICTORY ENERGY OPERATIONS – Collinsville, OK

Project Manager – 2015 to 2017

Boiler Design / Build Management; Project Values ranging from $1-MM to $10-MM. Managed commercial and technical project elements as the Liaison between the customer, our design team, and various suppliers. Primary functions include, but not limited to:

Project Handover from Applications /Sales Team requiring reviews of Customer Specification, As-Sold Proposal, VEO/Customer Contract documents including Terms & Conditions, Design Criteria and Logistics

Internal / External Kick-off to establish project goals and direction including scheduling each phase of the design / build process with the project execution team including Engineering, Design / Drafting, Instrumentation & Controls, Purchasing / Procurement, Fabrication, Shipping & Receiving, Transportation

Supplier RFQs / Bid Tab evaluation to secure cost effective and timely provision of materials, products and services critical to successful project execution; managed supplier production schedule to track fabrication commensurate with milestone payments

Order Entry review and control to maintain budget or improve upon overall project margin by controlling costs for project materials, equipment, services, or other

Change Order Management to minimize scope creep and to maximize opportunity to improve the project’s projected margin

Document Control of project documentation for review, approval and construction, as well as As-Builts at project’s end including engineering calculations, P&IDs, General Arrangements

(Boiler, System, Piping, Economizer, etc.), equipment and instrument lists, I&C Data Sheets, O&M Manual development

Milestone Invoicing

ON POINTE RESOURCES & ENGINEERING – Bixby, OK

Project Engineer/Manager – 2014 to 2015

Engineered and managed Client projects in the Oil & Gas industry. Worked directly with Clients on various projects facilitating and managing all facets of projects including:

FEL-1, 2, & 3 Studies, Basis of Design, Conceptual Design, Project Schedule development and implementation, Vendor coordination

JJ NEERMAN

865-***-****

10336 E. 113th Pl. S., Bixby, OK 74008

ac0ypt@r.postjobfree.com

PROFESSIONAL EXPERIENCE (continued)

Engineering design of civil/structural packages, mechanical piping packages, vessel design, all necessary calculations, Data Sheets, System Descriptions, Process Descriptions, Process Control Descriptions

Managed and coordinated internal drafting and engineering resources

Facilitated internal design reviews and client reviews

Took initiative with Business Development to create new relationships with potential Clients to grow the business and revenue

CB&I FEDERAL SERVICES (formerly Shaw E&I Group) – Knoxville, TN Process Engineering Consultant – 2008 to 2014

Worked specifically with DOE Client located in Aiken, SC, on Mixed Oxides Fuels Facility

Managed long-lead system procurements as Subcontract Technical Representative (STR); Generated scopes of work, developed Design Criteria, project schedule, procurement specs, developed and analyzed pre-qualified & approved bidders list, developed & evaluated Requests for Proposal (RFPs), Supplier’s Submittal Schedules, milestone payment schedules, witness & hold point inspections, personnel qualification requirements & site inspections

Career Achievement Project – Proposed alternative solution to existing BRP design eliminating $4,000,000.00 capital cost; created list of, spoke with and/or visited thirty (30) chemical suppliers to consider new BRP design concept; gained managerial approval to move forward with new design initiative; developed, completed and presented new design package to client on time and under budget

Partnered with Fuels Group in Dallas, TX, to perform clean/inspect/repair projects on Above Ground Storage (AGS) tanks for the Defense Logistics Agency (DLA)

Developed scopes of work, evaluated piping systems and fuel supply chain systems, conducted material take-offs, labor, material and equipment estimates, etc. B&W Y-12 NATIONAL SECURITY COMPLEX – Oak Ridge, TN Process Engineer – 2007 to 2008

Process design & evaluation of uranium dissolution, down blending, representative & remote liquid sampling techniques & transfers, glove-box exhaust filters with push through bag-out technology, and contaminated & non-contaminated floor cleaning operations, developed PFDs

& P&IDs, system specifications, mass, energy & chemical balance calculations, prepared reports & presentations

LUVATA GRENADA HEATCRAFT – Grenada, MS

Process Engineer – 2005 to 2006

Designed, built prototype, tested, analyzed data, and installed Innovative Oil Application System on 47-fin presses

Designed, built installed universal dip tank system; developed O&M documentation and training programs

R&D’d proprietary copper tubing coating designed to prevent formicary corrosion on copper tubing; designed and built copper tubing coating application system

Designed and built environmental testing simulator for analysis of proprietary coating JJ NEERMAN

865-***-****

10336 E. 113th Pl. S., Bixby, OK 74008

ac0ypt@r.postjobfree.com

PROFESSIONAL EXPERIENCE (continued)

Analyzed bottlenecking on coil assembly and brazing lines; optimized processes

Evaluated and resolved cause of false positive results on coils in helium leak testing process

Daily duties included: managing and maintaining 47-fin press operation; oil application analysis on pressed fin packs; laboratory research on proprietary coating and copper tubing analysis

OAK RIDGE NATIONAL LABORATORY – Oak Ridge, TN

Higher Education Research Experience (HERE) and Community College Internship Program – 2003 to 2004

Developed simulation modeling steam-methane reformation for Hydrogen production, capture, and storage;

Developed feasibility for production of the Next Generation Spent Nuclear Fuel Storage Cask; developed PFDs, equipment and instrument lists, design criteria and materials, and evaluated production and labor costs

NEERMAN EQUIPMENT SERVICES – Tulsa, OK

Mechanical Assistant – Summers and As Available – 1990 to 2000

Serviced, maintained, and installed, highly precision German machinery including Heidelberg printing presses, cutters, folders, & other bindery equipment; systems technologies included pneumatic, hydraulic and electronic; coordinated vendors – electricians, plumbers, HVAC technicians, and rigging professionals

EDUCATION

TENNESSEE TECHNOLOGICAL UNIVERSITY – Cookeville, TN Bachelors of Science in Chemical Engineering

Graduated 2007

GPA 3.3 / 4.0

Emphasis Materials Engineering

AIChE Vice-President and Car Team



Contact this candidate