TESLEY MARVIN ROWE
Haddington District, Hopewell P.O. Hanover, Jamaica W.I.
(876) 364 – 6489
D.O.B.: December 18, 1978
Email: ac0vgm@r.postjobfree.com
WORK OBJECTIVE Concrete Finisher/Block Layer
HIGHLIGHTS OF QUALIFICATIONS
Over ten years experience in residential construction as a concrete finisher and concrete block layer.
Apply desired finish to concrete surfaces using hand tools, power tools, pliers, hammers, drills, shovel, float, cold chisel, ball pein hammer, hatchet, etc.
Repair, resurface and replace damaged sections of floors, walls, roads and other concrete structures
Read sketches and blueprints to determine materials. Cut and trim concrete blocks to specification using hand tools
Prepare and lay concrete blocks, installed rebar and similar materials to construct or repair walls, foundations and other structures in residential and commercial construction
Able to work well with little or no supervision
Enjoy working with people from diverse backgrounds, excellent team player
Fluent in English- speaking, reading and writing
Certified as a construction worker with HEART TRUST NTA WORK EXPERIENCE
Concrete Finisher/Block Layer
Aug 2000 - Present
Assisted in renovation and erecting fence wall
Assisted in excavation, construction of concrete poles and other general duties
Prepare material list and cost estimate
Shoveled cement and other materials into cement mixers; mixed, poured and spread concrete using shovel
Assisted in demolishing existing structure to accommodate renovation and construction of new buildings
Installed floor and bathroom wall tiles
Erect wooden structure to support concrete platforms for roof and decking
Operated electric drills to break up concrete or pavement
Repair, waterproof and restore concrete surfaces, smooth the surface of the concrete, round the edges and make joints or grooves to help control cracking on the surface MAJOR ACHIEVEMENT
Construct two bedrooms dwelling including bathroom, kitchen and laundry room.
This include preparing excavation, installed rebars, building blocks, mix concrete mixture, place wet concrete into forms and spread it to a specified depth
Apply architectural, patterned, stamped, broomed or smooth finish concrete surfaces
• Prepare material list and cost
• Supervised up to 12 workers on site
Construct 200 feet length concrete fence wall
Partially completed 7 bedrooms dwelling along with other accommodation EDUCATION AND TRAINING
Aberdeen All Age School Aberdeen, St. Elizabeth, Jamaica 1987 - 1996 General Construction Level 2 Granville Institution HEART TRUST NTA St. James, Jamaica 2014 - 2015
References available upon request